Upload Button Icon Add office photos

Filter interviews by

GREEN POWER INTERNATIONAL Power Plant Operator Interview Questions and Answers

Updated 10 Sep 2021

GREEN POWER INTERNATIONAL Power Plant Operator Interview Experiences

1 interview found

I applied via Walk-in and was interviewed in Mar 2021. There were 3 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Engine konsi company ka he
  • Q2. H T temp high kitna
  • Q3. Cooling system pressure kitna

Interview Preparation Tips

Interview preparation tips for other job seekers - No advice interview is scheduled good

Interview questions from similar companies

Interview Questionnaire 

1 Question

  • Q1. Technical Questions related to my field were asked.

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep your technical knowledge strong
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Mar 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Explain All the laws of Thermodynamics
  • Ans. 

    The laws of thermodynamics are fundamental principles governing energy and heat transfer in physical systems.

    • First Law: Energy cannot be created or destroyed, only transferred or converted.

    • Second Law: Heat naturally flows from hot to cold objects, and entropy tends to increase over time.

    • Third Law: As temperature approaches absolute zero, entropy approaches a minimum value.

    • Examples: A car engine converting fuel into mot...

  • Answered by AI
  • Q2. One should have good Engineeringskills
Round 2 - HR 

(1 Question)

  • Q1. Salary Expectation

I applied via Company Website and was interviewed in Feb 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Introduce yourself? What are roles and responsibilities at Current organization? Tell me procedure for Domestic connection? Administration skills?

Interview Preparation Tips

Interview preparation tips for other job seekers - First thing is to being Relax at Interview. As interview is all about Inter communication skills it shall be a two way dialogue. My interview conducted through Video Conference.

Following point should be in consideration:-

1) Be honest in your CV as well as in an Interview.
Mentioned the things in CV which are your actual responsibilities. As Interviewer are most experienced so we can't fooled them.
2) Talk on Facts.
3) Be a realistic person.
4) Avoid topic you are less known for.
5) Ideas should be practical and workable.

Lastly, all the best to all of friends for your interviews and just do it.
Interview experience
-
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Dec 2020. There were 4 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Pls take my interview
  • Q2. Consider my resume
Round 2 - HR 

(2 Questions)

  • Q1. Pls take my resume
  • Q2. Pls consider my resume
Round 3 - Personal Interview 

(3 Questions)

  • Q1. Any types& Pipeline Engineering
  • Ans. 

    Pipeline engineering involves designing, constructing, and maintaining pipelines for various industries such as oil and gas, water, and transportation.

    • Designing pipelines to transport fluids or gases efficiently

    • Constructing pipelines using materials like steel, plastic, or composite materials

    • Maintaining pipelines to prevent leaks and ensure safety

    • Types of pipelines include transmission pipelines, distribution pipelines

  • Answered by AI
  • Q2. NDT related & quality related
  • Q3. Pipeline field CGD and cross country related
Round 4 - Technical 

(2 Questions)

  • Q1. Pls take my resume
  • Q2. Pls consider my resume

Interview Preparation Tips

Interview preparation tips for other job seekers - Technical & non-technical
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jul 2023. There were 2 interview rounds.

Round 1 - One-on-one 

(4 Questions)

  • Q1. Explain Bank System in CNG cascade?
  • Ans. 

    Bank system in CNG cascade involves multiple banks connected in a series to provide continuous supply of CNG.

    • CNG cascade system typically consists of multiple high-pressure cylinders connected in a series.

    • Each bank in the cascade is filled with CNG at different pressure levels.

    • The banks are interconnected to ensure a continuous and reliable supply of CNG.

    • Pressure regulators are used to control the flow of CNG between t...

  • Answered by AI
  • Q2. Types of Compressor?
  • Ans. 

    Types of compressors include reciprocating, rotary, screw, and centrifugal compressors.

    • Reciprocating compressors use pistons to compress air.

    • Rotary compressors use rotating vanes or screws to compress air.

    • Screw compressors use intermeshing screws to compress air.

    • Centrifugal compressors use a rotating impeller to compress air.

    • Examples: Ingersoll Rand reciprocating compressor, Atlas Copco rotary compressor, Gardner Denve...

  • Answered by AI
  • Q3. GCR and inter distance between equipment of CNG station?
  • Ans. 

    GCR stands for Gas Compression Ratio and inter distance refers to the spacing between equipment at a CNG station.

    • GCR is the ratio of the volume of gas before compression to the volume after compression.

    • Inter distance between equipment at a CNG station is important for safety and efficient operation.

    • For example, the inter distance between a compressor and a storage tank should be sufficient to allow for proper ventilati

  • Answered by AI
  • Q4. Applicable standards for CGD
  • Ans. 

    Applicable standards for CGD include ISO 9001, Six Sigma, and Lean principles.

    • ISO 9001: Quality management system standards

    • Six Sigma: Process improvement methodology

    • Lean principles: Eliminating waste and improving efficiency

  • Answered by AI
Round 2 - One-on-one 

(3 Questions)

  • Q1. Why you want to change your job?
  • Ans. 

    Seeking new challenges and growth opportunities in a more dynamic work environment.

    • Looking for career advancement

    • Seeking new challenges and responsibilities

    • Interested in working in a more dynamic and fast-paced environment

  • Answered by AI
  • Q2. If I will give another departments, will you work?
  • Ans. 

    Yes, I am willing to work with other departments to achieve common goals and support the overall success of the organization.

    • I believe in collaboration and teamwork to achieve common goals.

    • I am open to learning new skills and working in different areas.

    • I understand the importance of cross-departmental communication and coordination.

    • For example, in my previous role, I collaborated with the marketing team to launch a suc

  • Answered by AI
  • Q3. Are you ready for relocation
  • Ans. 

    Yes, I am open to relocation for the right opportunity.

    • I am willing to relocate for career growth and new experiences

    • I have relocated in the past for job opportunities

    • I understand the importance of being flexible and adaptable in a new location

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Read all standards properly if you are from CGD background

I applied via Naukri.com and was interviewed in Oct 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. The HR round was very pathetic. Sreethala took my HR round.

Interview Preparation Tips

Interview preparation tips for other job seekers - Please don't waste your precious time in giving the interview for Baker Hughes, Powai
Mumbai location. They will take all the interview rounds. The HR will ask you to submit all documents and last moment they will cancel your candidature without giving you any specific reason.

I applied via Recruitment Consultant and was interviewed in Dec 2020. There were 6 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. 1st round is technical , 2nd is values & behaviors , 3rd is assessment road
  • Q2. Be clear on values & behaviours , practice assement round offline before attempting

Interview Preparation Tips

Interview preparation tips for other job seekers - its a long process may take 2-3 months , there is internal & external assement before selectioon is finalized . Good luck
Interview experience
4
Good
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Not Selected

I applied via Company Website and was interviewed in May 2024. There were 2 interview rounds.

Round 1 - Group Discussion 

Behavioral questions and resume delve

Round 2 - Case Study 

Pmi - product management information

Interview Preparation Tips

Interview preparation tips for other job seekers - study supply chain, product management information and presentation
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Jan 2024. There were 3 interview rounds.

Round 1 - Group Discussion 

My GD topic was renewable energy.

Round 2 - HR 

(7 Questions)

  • Q1. Tell me about yourself
  • Ans. 

    I am a Senior Engineer with 10+ years of experience in designing and implementing complex systems.

    • 10+ years of experience in engineering

    • Specialize in designing and implementing complex systems

    • Strong problem-solving skills

    • Experience with various programming languages such as Java, Python, and C++

  • Answered by AI
  • Q2. Why do you want to leave your previous company and join GAIL
  • Ans. 

    Seeking new challenges and growth opportunities at GAIL.

    • Desire for new challenges and opportunities for growth

    • Interested in working in a different industry or with different technologies

    • Attracted to GAIL's reputation and projects

    • Seeking a more collaborative and innovative work environment

  • Answered by AI
  • Q3. What do your parents do
  • Ans. 

    My parents are both retired now, but my father used to work as a civil engineer and my mother was a teacher.

    • Father worked as a civil engineer

    • Mother was a teacher

    • Both are retired now

  • Answered by AI
  • Q4. Have you ever visited Delhi earlier
  • Ans. 

    Yes, I have visited Delhi earlier for a business trip.

    • Visited Delhi for a business trip

    • Explored historical sites like Red Fort and Qutub Minar

    • Enjoyed local cuisine like butter chicken and chaat

  • Answered by AI
  • Q5. How did you reach Noida for interview
  • Q6. Where are you staying in Noida for interview process
  • Ans. 

    I am staying at a hotel in Sector 18, Noida for the interview process.

    • Staying at a hotel in Sector 18, Noida

    • Close to the interview location

    • Comfortable accommodation for the duration of the process

  • Answered by AI
  • Q7. Related family background
Round 3 - Technical 

(7 Questions)

  • Q1. Detailed technical questions about bearing, pump, furnace tubes (1st and 2nd pass)MOC, TLE MOC, heat exchanger tube MOC, TEMA codes and classification etc.
  • Q2. Decoking process of cracking furnace, Naphtha circuit of furnace with sketches,
  • Ans. 

    Decoking process involves removing coke deposits from cracking furnace and naphtha circuit to maintain efficiency.

    • Decoking process involves burning off coke deposits using controlled combustion.

    • Mechanical decoking involves using high-pressure water jets to remove coke deposits.

    • Chemical decoking involves using solvents or acids to dissolve coke deposits.

    • Regular decoking is essential to prevent blockages and maintain fur

  • Answered by AI
  • Q3. Detailed refrigeration cycles
  • Ans. 

    Refrigeration cycles are thermodynamic processes used in refrigerators and air conditioners to transfer heat from a low temperature reservoir to a high temperature reservoir.

    • Refrigeration cycles typically involve four main components: compressor, condenser, expansion valve, and evaporator.

    • The refrigerant undergoes a cycle of compression, condensation, expansion, and evaporation to absorb heat from the space being coole...

  • Answered by AI
  • Q4. Safety related questions which I couldn't answer well
  • Q5. Safety procedures before starting of hot job
  • Ans. 

    Safety procedures before starting a hot job include obtaining a hot work permit, conducting a hazard assessment, ensuring proper ventilation, and having fire extinguishing equipment nearby.

    • Obtain a hot work permit before starting any hot job

    • Conduct a hazard assessment to identify potential risks

    • Ensure proper ventilation in the work area to prevent buildup of flammable gases

    • Have fire extinguishing equipment nearby and r

  • Answered by AI
  • Q6. Furnace tubes Welding related questions
  • Q7. Scaffolding and insulation related general questions (easy)

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared for GD and just keep enough technical knowledge on your field of experience. Be relaxed and give interview with happy face..don't be depressed if you couldn't answer any question during interview. If you don't know anything just say "I don't know" ...keep the things simple and give honest answer always.

GREEN POWER INTERNATIONAL Interview FAQs

What are the top questions asked in GREEN POWER INTERNATIONAL Power Plant Operator interview?

Some of the top questions asked at the GREEN POWER INTERNATIONAL Power Plant Operator interview -

  1. Cooling system pressure kit...read more
  2. Engine konsi company ka...read more
  3. H T temp high ki...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

ExxonMobil Interview Questions
3.8
 • 64 Interviews
GAIL Interview Questions
4.4
 • 64 Interviews
bp Interview Questions
3.8
 • 61 Interviews
Saudi Aramco Interview Questions
4.4
 • 56 Interviews
Baker Hughes Interview Questions
4.0
 • 54 Interviews
Petrofac Interview Questions
4.3
 • 41 Interviews
Mahanagar Gas Interview Questions
4.3
 • 28 Interviews
Gps Renewables Interview Questions
4.0
 • 22 Interviews
Kent plc Interview Questions
4.3
 • 21 Interviews
View all
GREEN POWER INTERNATIONAL Power Plant Operator Salary
based on 4 salaries
₹1.5 L/yr - ₹1.9 L/yr
84% less than the average Power Plant Operator Salary in India
View more details

GREEN POWER INTERNATIONAL Power Plant Operator Reviews and Ratings

based on 2 reviews

5.0/5

Rating in categories

3.0

Skill development

4.0

Work-life balance

4.0

Salary

4.0

Job security

4.0

Company culture

3.0

Promotions

4.9

Work satisfaction

Explore 2 Reviews and Ratings
Engineer
11 salaries
unlock blur

₹2.9 L/yr - ₹5 L/yr

Senior Engineer
11 salaries
unlock blur

₹4.3 L/yr - ₹7.6 L/yr

Electrical Engineer
11 salaries
unlock blur

₹2.2 L/yr - ₹5.3 L/yr

Associate Manager
9 salaries
unlock blur

₹6.6 L/yr - ₹10.6 L/yr

Junior Engineer
8 salaries
unlock blur

₹2.8 L/yr - ₹3.5 L/yr

Explore more salaries
Compare GREEN POWER INTERNATIONAL with

GAIL

4.4
Compare

Petrofac

4.3
Compare

Saudi Aramco

4.4
Compare

Baker Hughes

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview