Filter interviews by
I have over 5 years of experience in maintenance engineering, specializing in troubleshooting and preventive maintenance.
5+ years of experience in maintenance engineering
Specialize in troubleshooting and preventive maintenance
Experience with equipment maintenance and repair
Knowledge of safety regulations and protocols
Strong problem-solving skills
My notification period is one month.
My notification period is one month
I am required to give one month notice before leaving my current position
This allows my current employer enough time to find a replacement and for me to transition smoothly
I have extensive knowledge of SAP modules such as PM, MM, and SD, as well as experience in implementing and customizing SAP solutions.
Experience with SAP modules such as PM (Plant Maintenance), MM (Materials Management), and SD (Sales and Distribution)
Knowledge of SAP implementation and customization
Familiarity with SAP ERP system and its functionalities
Ability to troubleshoot and resolve issues within SAP environment
E
I resolved breakdown issues by quickly identifying the root cause, planning and executing repairs efficiently, and implementing preventive maintenance measures.
Quickly identify the root cause of the breakdown
Plan and execute repairs efficiently to minimize downtime
Implement preventive maintenance measures to prevent future breakdowns
I applied via Naukri.com and was interviewed in Nov 2024. There were 2 interview rounds.
Top trending discussions
posted on 24 Nov 2024
I applied via Naukri.com
Types of maintenance include preventive, predictive, corrective, and proactive maintenance. Each type requires different strategies to effectively manage and address maintenance issues.
Preventive maintenance involves regularly scheduled inspections and tasks to prevent breakdowns (e.g. changing air filters in HVAC systems)
Predictive maintenance uses data and analytics to predict when equipment will fail and schedule ma...
I applied via Naukri.com and was interviewed in Mar 2024. There was 1 interview round.
Erection and commissioning of a pneumatic compressor involves assembling the components, connecting the necessary piping, testing for functionality, and fine-tuning for optimal performance.
Assemble the components of the pneumatic compressor according to the manufacturer's instructions.
Connect the necessary piping for air intake, compression, and output.
Test the compressor for functionality by running it empty and check...
Blowdown of cooling tower can be calculated using cycles of concentration. Maintenance practices include regular cleaning, inspection, and water treatment. Cooling tower capacity can be calculated based on heat load and design parameters.
Calculate blowdown using cycles of concentration formula: Blowdown = Evaporation Loss / (Cycles of Concentration - 1)
Maintenance practices include regular cleaning of cooling tower fil...
RCM stands for Reliability Centered Maintenance, a proactive maintenance strategy focused on identifying and preventing equipment failures.
RCM is a systematic approach to maintenance planning that aims to optimize maintenance tasks to ensure equipment reliability.
It involves analyzing the functions and potential failure modes of equipment to determine the most effective maintenance strategies.
RCM prioritizes maintenanc...
Pumps can be classified based on their casings as follows: volute casing, axial split casing, and radial split casing.
Volute casing pumps have a spiral-shaped casing that gradually expands to the discharge outlet.
Axial split casing pumps have a casing split along the horizontal centerline of the pump.
Radial split casing pumps have a casing split along the vertical centerline of the pump.
Air compressor works by compressing air to increase its pressure and decrease its volume.
Air is drawn into the compressor through an intake valve.
The air is then compressed using a piston or rotating impeller.
Compressed air is stored in a tank or released directly for use.
Examples of air compressors include reciprocating, rotary screw, and centrifugal compressors.
The amount of amps a 30 kW motor takes depends on the voltage it is operating at.
The formula to calculate amps is: Amps = kW / (Volts * 1.73)
For example, a 30 kW motor operating at 480 volts would take approximately 36 amps
Higher voltage motors will draw fewer amps compared to lower voltage motors
I applied via Naukri.com and was interviewed in Nov 2022. There were 3 interview rounds.
Maintenance work includes preventive, corrective, and predictive maintenance to ensure optimal performance of equipment and facilities.
Preventive maintenance involves routine inspections, cleaning, and replacement of parts to prevent breakdowns and extend equipment life.
Corrective maintenance involves repairing equipment after a breakdown or malfunction.
Predictive maintenance involves using data and analytics to predic...
posted on 10 Oct 2023
I applied via Referral and was interviewed before Oct 2022. There were 2 interview rounds.
Vernier caliper is a precision measuring tool used to measure internal and external dimensions with high accuracy.
Ensure the jaws are clean and free from debris before use
Close the jaws and check if the zero error is present, if so, adjust accordingly
Place the object to be measured between the jaws and gently close them to get a reading
Read the main scale value and the vernier scale value to get the final measurement
Ta
Types of belts include V-belts, timing belts, flat belts, and ribbed belts.
V-belts are commonly used in industrial applications and have a trapezoidal cross-section.
Timing belts have teeth on the inner side to prevent slipping and are used in engines and machinery.
Flat belts are flexible and used in conveyor systems and power transmission.
Ribbed belts have longitudinal ribs on the inner side for better grip and are use
Friction is the force that resists the relative motion or tendency of such motion of two surfaces in contact.
Friction is caused by the roughness of surfaces in contact.
It acts in the opposite direction of the applied force.
Friction can be static (when the object is at rest) or kinetic (when the object is in motion).
Examples include the friction between tires and the road, or between a screw and a nut.
posted on 25 Jul 2021
I applied via Naukri.com and was interviewed in Jan 2021. There were 3 interview rounds.
Safety during confined space is crucial to prevent accidents and ensure the well-being of workers.
Proper training and education on confined space hazards
Use of personal protective equipment (PPE) such as respirators, harnesses, and gas detectors
Implementing a permit system to control access and monitor activities
Continuous monitoring of atmospheric conditions
Establishing emergency procedures and rescue plans
Regular equ...
I applied via Naukri.com and was interviewed before Jun 2022. There were 2 interview rounds.
My expected CTC is negotiable based on the job responsibilities, company size, and location.
Consider the job responsibilities and required skills when determining expected CTC
Research industry standards and average salaries for similar positions in the area
Be prepared to discuss benefits, bonuses, and other compensation packages during negotiations
based on 2 interviews
Interview experience
based on 1 review
Rating in categories
Senior Executive
60
salaries
| ₹2.4 L/yr - ₹5.4 L/yr |
Area Sales Executive
46
salaries
| ₹3 L/yr - ₹5.3 L/yr |
Executive
45
salaries
| ₹2.2 L/yr - ₹4.5 L/yr |
Junior Manager
42
salaries
| ₹3.2 L/yr - ₹7 L/yr |
Junior Executive
33
salaries
| ₹1.7 L/yr - ₹3.5 L/yr |
Amul India
Mother Dairy Fruit & Vegetable
Nestle
Britannia