posted on 12 Dec 2022
I applied via Referral and was interviewed before Dec 2021. There were 3 interview rounds.
This test contain electrical , refrigeration, Mechanical questions.
Top trending discussions
I applied via Naukri.com and was interviewed before Feb 2021. There was 1 interview round.
I appeared for an interview before Nov 2020.
The plant start up process involves preparing equipment, conducting safety checks, and gradually bringing the plant online.
Ensure all equipment is properly prepared and in working order
Conduct safety checks to identify and mitigate any potential hazards
Gradually bring the plant online to avoid sudden surges in production
Monitor the process closely for any issues or abnormalities
Have a contingency plan in place in case ...
To hold plant on emergency, ensure proper emergency response plan, backup systems, trained personnel, and communication protocols.
Develop and implement an emergency response plan outlining procedures for different types of emergencies
Install backup systems for critical equipment to prevent downtime during emergencies
Train personnel on emergency procedures and conduct regular drills to ensure readiness
Establish clear co...
posted on 4 Oct 2023
Technical knowledge questions answer |
I applied via Campus Placement and was interviewed before May 2022. There were 3 interview rounds.
Electrical knowledge
A star delta starter is a type of reduced voltage starter used for starting three-phase induction motors.
Consists of a star contactor and a delta contactor
Initially motor is started in star configuration to reduce starting current
After a set time, switches to delta configuration for full speed operation
Contactor interlocking is a safety feature to prevent simultaneous operation of multiple motors.
Contactor interlocking ensures only one motor can run at a time to prevent overload.
It is achieved by using electrical interlocks between contactors of different motors.
For example, if Motor A is running, the contactor for Motor B will be prevented from closing.
This prevents both motors from running simultaneously and causin...
Wiring in panels involves connecting electrical components using proper techniques and materials.
Ensure proper wire sizing and insulation for the current being carried
Follow wiring diagrams and manufacturer instructions for correct connections
Use wire labels and organize cables neatly for easy troubleshooting
Check for loose connections and secure all wires properly
Test the panel for functionality and safety before clos...
posted on 11 Jul 2023
I applied via Referral and was interviewed before Jul 2022. There were 4 interview rounds.
Cooling tower parameters include water flow rate, temperature, pressure, and chemical levels.
Water flow rate must be monitored to ensure proper cooling efficiency
Temperature of the water entering and exiting the tower should be measured
Pressure levels need to be maintained within specified ranges
Chemical levels such as biocides and corrosion inhibitors should be regularly checked
The HVAC process diagram illustrates the flow of air through a heating, ventilation, and air conditioning system.
Start with the intake of outside air through vents or ducts
Air passes through filters to remove dust and particles
Air is then heated or cooled by the HVAC unit
The conditioned air is distributed through ductwork to different rooms
Return air is collected and recirculated through the system
PPE stands for Personal Protective Equipment.
PPE is equipment worn to minimize exposure to hazards that can cause injuries or illnesses.
Examples of PPE include gloves, goggles, helmets, and respirators.
PPE is essential in maintaining safety in various industries such as construction, healthcare, and manufacturing.
Star-delta connection reduces starting current in three-phase motors, improving efficiency and reducing stress on electrical components.
Star connection (Y) is used for starting, providing high voltage and low current.
Delta connection (Δ) is used for running, providing high current and low voltage.
Example: A 400V motor starts in star (230V per phase) and switches to delta for full power.
Reduces mechanical stress and ele...
I applied via Naukri.com and was interviewed in Jul 2023. There was 1 interview round.
based on 1 interview experience
Difficulty level
Duration
Senior Executive
62
salaries
| ₹2.4 L/yr - ₹5.5 L/yr |
Area Sales Executive
61
salaries
| ₹3 L/yr - ₹6 L/yr |
Executive
46
salaries
| ₹2 L/yr - ₹5 L/yr |
Junior Manager
43
salaries
| ₹3.3 L/yr - ₹8.2 L/yr |
Assistant Manager
40
salaries
| ₹4 L/yr - ₹11.1 L/yr |
WNS
Varun Beverages
Sodexo
Future Group