GlobalLogic
HaslerRail Interview Questions and Answers
Q1. Loadrunner scripting, execution and reports issue faced and how to process?
Issues faced in Loadrunner scripting, execution, and reports
Scripting: faced issues with correlation, parameterization, and dynamic data handling
Execution: encountered problems with test environment setup, resource constraints, and test data management
Reports: struggled with result analysis, performance bottlenecks identification, and report customization
Q2. What is correlation and parameterization?
Correlation is the process of extracting dynamic values from server responses and passing them to subsequent requests. Parameterization is the process of replacing hard-coded values in scripts with variables.
Correlation involves identifying and capturing dynamic values like session IDs or tokens from server responses.
Parameterization involves replacing hard-coded values in scripts with variables to make them reusable and dynamic.
Correlation is essential for maintaining sessio...read more
Q3. LG calculation and workload modelling process?
LG calculation and workload modelling process involves determining the number of Load Generators required and creating a realistic simulation of user behavior.
Calculate the number of Load Generators needed based on expected user load and performance goals.
Create workload models by analyzing user behavior patterns, transaction volumes, and system usage.
Consider factors like peak load times, user distribution, and transaction mix in workload modelling.
Use tools like LoadRunner,...read more
Q4. Explain load, stress, all testing?
Load testing is to test the system under normal and peak load conditions, stress testing is to test the system beyond its limits, and all testing is a combination of both.
Load testing checks the system's ability to handle expected load levels, ensuring performance under normal conditions.
Stress testing pushes the system beyond its limits to identify breaking points and measure performance degradation.
All testing combines load and stress testing to ensure the system can handle...read more
Q5. Explain PTLC?
PTLC stands for Performance Testing Life Cycle, which is a set of activities involved in the performance testing process.
PTLC involves planning, preparation, execution, analysis, and reporting of performance tests.
It includes defining performance goals, creating test scenarios, setting up test environments, running tests, analyzing results, and making recommendations.
Example: In PTLC, performance engineers work closely with developers and stakeholders to ensure the applicatio...read more
Q6. NFR scenarios?
NFR scenarios refer to non-functional requirements that define the quality attributes of a system.
NFR scenarios focus on aspects like performance, scalability, reliability, and security.
Examples include load testing to assess system performance under expected load, stress testing to evaluate system behavior under extreme conditions, and security testing to identify vulnerabilities.
NFR scenarios help ensure that the system meets user expectations in terms of usability, availab...read more
Interview Process at HaslerRail
Top Performance Test Engineer Interview Questions from Similar Companies
Reviews
Interviews
Salaries
Users/Month