Filter interviews by
I applied via Walk-in and was interviewed before Oct 2023. There were 3 interview rounds.
Ask about previous job details, work etc
Viscosity of bitumen refers to its resistance to flow, which is important in determining its suitability for various applications.
Viscosity of bitumen is a measure of its resistance to flow under specific conditions.
It is typically measured in units such as poise or Pascal-seconds.
Higher viscosity bitumen is more resistant to flow, while lower viscosity bitumen flows more easily.
The viscosity of bitumen can be influenc...
Top trending discussions
posted on 31 Oct 2022
I applied via Walk-in and was interviewed in Oct 2022. There were 2 interview rounds.
posted on 1 Mar 2024
I applied via Walk-in and was interviewed before Mar 2023. There were 3 interview rounds.
They have a test paper that you have to fill before meeting MD in final round
posted on 7 Nov 2019
The finishing process involves tiling, wall gypsum, plaster, and waterproofing with specific material proportions and properties.
The first step is to prepare the surface by cleaning and leveling it.
Waterproofing is done to prevent water damage to the walls and floors.
Gypsum plaster is used to create a smooth surface for painting or wallpapering.
Tiling involves laying tiles on the floor or walls using adhesive and grout...
based on 1 review
Rating in categories
Project Manager
4
salaries
| ₹7.1 L/yr - ₹14 L/yr |
Account Assistant
4
salaries
| ₹3.5 L/yr - ₹3.5 L/yr |
Civil Engineer
4
salaries
| ₹2.4 L/yr - ₹3.5 L/yr |
Senior Site Engineer
4
salaries
| ₹12 L/yr - ₹14 L/yr |
Senior Engineer
3
salaries
| ₹3.8 L/yr - ₹9.6 L/yr |
DLF
Sobha
Prestige Group
Godrej Properties