Filter interviews by
I applied via Shine and was interviewed in Jun 2022. There were 2 interview rounds.
7QC tools are a set of quality control tools used to identify and solve quality problems in manufacturing processes.
7QC tools include Pareto chart, cause-and-effect diagram, control chart, histogram, scatter diagram, flowchart, and check sheet.
They help in identifying and analyzing quality problems, determining root causes, and implementing corrective actions.
They are used to improve product quality, reduce defects, an...
PPAP and APQP are quality management systems used in manufacturing.
PPAP stands for Production Part Approval Process and is used to ensure that manufactured parts meet customer requirements.
APQP stands for Advanced Product Quality Planning and is used to plan and manage the design and development of new products.
Both systems are commonly used in the automotive industry but can be applied to other manufacturing industrie...
Pareto is a principle that states 80% of effects come from 20% of causes.
Also known as the 80/20 rule
Used in business to identify the most important factors
Can be applied to various fields such as economics, engineering, and social sciences
Example: 80% of a company's profits come from 20% of its customers
OEE can be calculated by multiplying Availability, Performance, and Quality percentages.
Calculate Availability by dividing Operating Time by Planned Production Time.
Calculate Performance by dividing Actual Production by Maximum Production.
Calculate Quality by dividing Good Units by Total Units Produced.
Multiply Availability, Performance, and Quality percentages to get OEE.
I applied via Campus Placement and was interviewed in Jul 2020. There was 1 interview round.
I appeared for an interview before Jan 2024.
posted on 21 Oct 2024
I applied via Recruitment Consulltant and was interviewed in Sep 2024. There were 3 interview rounds.
Verbal, quantitative and manual description in detail .
posted on 22 Oct 2024
I applied via Recruitment Consulltant and was interviewed in Sep 2024. There were 3 interview rounds.
Topics like blood relation, time, train
Smoke testing is a preliminary testing to check if the basic functionalities of a software application are working fine.
Smoke testing is a subset of regression testing and is usually performed after a build is received from the development team.
It is a high-level testing to verify if the critical functionalities of the software are working without any major issues.
Smoke testing is not exhaustive and is meant to ensure ...
Integration testing is a type of testing where individual units or components of a software application are combined and tested as a group.
It focuses on testing the interactions between different components/modules of the software.
It helps in identifying issues related to data flow, communication between modules, and integration points.
Examples include testing the integration between a front-end user interface and a ba...
STLC stands for Software Testing Life Cycle, which is a systematic process for testing software applications.
STLC involves different phases such as requirement analysis, test planning, test design, test execution, and test closure.
Each phase has specific activities and deliverables to ensure the quality of the software.
STLC helps in identifying defects early in the development cycle, reducing the cost of fixing them la...
Agile methodology is a flexible and iterative approach to project management.
Agile focuses on delivering small, incremental releases and adapting to change
It emphasizes collaboration, customer feedback, and continuous improvement
Common practices include daily stand-up meetings, sprint planning, and retrospectives
Popular frameworks include Scrum, Kanban, and Extreme Programming
posted on 12 Dec 2024
The question is related to structural engineering concepts like code, footing design, and load combination.
Code refers to the set of rules and regulations that govern the design and construction of structures.
Footing design involves determining the size and depth of footings to support the structure above.
Load combination is the process of combining different types of loads (e.g. dead load, live load, wind load) to ass
posted on 11 Jan 2025
Audit sales call audits as per QA parameters and upload file in google form
I have 5 years of experience in call audits, including monitoring, analyzing, and providing feedback on call quality.
5 years of experience in call audits
Proficient in monitoring calls for quality assurance
Skilled in analyzing call data and identifying areas for improvement
Experienced in providing feedback to agents and management on call performance
Familiar with call audit tools and software
I applied via Company Website and was interviewed before Apr 2023. There was 1 interview round.
Types of wires include solid, stranded, and braided wires. Colors of wires vary depending on their purpose and industry standards.
Types of wires: solid, stranded, braided
Colors of wires vary by industry standards
Common wire colors: black, red, blue, green, white, yellow
Assistant Manager
172
salaries
| ₹2.1 L/yr - ₹7 L/yr |
Senior Executive
169
salaries
| ₹1.5 L/yr - ₹4.9 L/yr |
Senior HR Executive
120
salaries
| ₹1.8 L/yr - ₹3.8 L/yr |
HR Executive
96
salaries
| ₹1.1 L/yr - ₹4 L/yr |
Facility Executive
69
salaries
| ₹2.4 L/yr - ₹5 L/yr |
Coca-Cola Company
Dhoot Transmission
Apotex Research
Athena BPO