Upload Button Icon Add office photos

Filter interviews by

Ganadhi Pati Construction Interview Questions and Answers

Be the first one to contribute and help others!

Interview questions from similar companies

I applied via Recruitment Consultant and was interviewed before Oct 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. About the background

Interview Preparation Tips

Interview preparation tips for other job seekers - Please have good job knowledge

I applied via Company Website and was interviewed in Jun 2021. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. Why you left from your current company? What is your job profile? How to manage all things? To whom reported? How many employee in your current & previous company? What was the roll in previous company? Ho...
  • Q2. What is your current job location. What is the project cost? How much percentage hike my salary? What is the leave policy, HR Policies extra .

Interview Preparation Tips

Interview preparation tips for other job seekers - What is the achievements in previous companies.

I applied via Naukri.com and was interviewed before Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Quality checking methods
  • Q2. Design reviews checking.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and answers only technically.

I applied via Recruitment Consultant and was interviewed in Sep 2019. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. About my previous experience, and my scope of work?
  • Q2. Areas of strengths and areas need to develop

Interview Preparation Tips

Interview preparation tips for other job seekers - The interview consisting of two rounds, first is about my personal details, which is intervied by Hr person. the second round is technical one, which was taken by Project director of the particular project. So i advice everyone be confident what you answering them, all the questions were asked about my experience part, and the knowledge what i have gained during the work apart from my education life. They also check all my documents. After completion of my interview and after 1 month, i got the offer letter of this company. Now iam so happy for this achievement. I hope all of the others who were attending for the interviews, hope you all get placed.

Thanks and Regards
Rahman

I applied via Campus Placement and was interviewed before Mar 2020. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. What is the most challenging situation you have been through in your career?

Interview Preparation Tips

Interview preparation tips for other job seekers - To ace an interview you need to be a good listener as much as a good speaker. Try to listen and understand what the interviewer is asking and then reply. Never be in a hurry to answer, take time. If you did not understand what interviewer is asking simply ask him to repeat, pls don't presume anything and answer anything that comes to your mind. Most importantly never fake in an interview just try to be your best...

I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.

Interview Questionnaire 

6 Questions

  • Q1. Can you explain Man day
  • Q2. Can you explain manpower mobilization.
  • Ans. 

    Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.

    • Identifying the required personnel for a project

    • Recruiting and hiring personnel

    • Training and orienting personnel to the project

    • Assigning roles and responsibilities to personnel

    • Managing personnel performance and productivity

    • Ensuring compliance with labor laws and regulations

    • Examples include mobilizing a construc...

  • Answered by AI
  • Q3. How to cost control in project
  • Ans. 

    Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.

    • Create a detailed project budget and stick to it

    • Track expenses regularly and adjust budget as needed

    • Identify and eliminate unnecessary expenses

    • Negotiate with vendors for better pricing

    • Implement cost-saving measures without compromising quality

    • Use project management tools to monitor expenses and progress

    • Reg...

  • Answered by AI
  • Q4. Can you explain how to handle clinent
  • Ans. 

    Handling clients requires effective communication, understanding their needs, and providing timely solutions.

    • Listen actively to their concerns and requirements

    • Communicate clearly and professionally

    • Provide timely updates and solutions

    • Build a strong relationship based on trust and respect

    • Be proactive in identifying and addressing potential issues

    • Ensure customer satisfaction by going above and beyond expectations

  • Answered by AI
  • Q5. Flow chart for manpower mobilization
  • Ans. 

    Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.

    • Identify the need for manpower

    • Plan the recruitment process

    • Source and screen candidates

    • Conduct interviews and assessments

    • Select and hire candidates

    • Provide training and orientation

    • Deploy manpower to required locations

  • Answered by AI
  • Q6. Prepared organisation chat for project handling

Interview Preparation Tips

Interview preparation tips for other job seekers - Please see all questions

I applied via Naukri.com and was interviewed before Sep 2020. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. About pipeline
  • Q2. Hydrotest procedure
  • Ans. 

    Hydrotest procedure is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water and pressurizing it.

    • The vessel or pipeline is filled with water and pressurized to a specified level

    • The pressure is held for a specified amount of time to check for leaks or deformations

    • The test is usually performed before commissioning or after repairs

    • The test pressure and duration are deter...

  • Answered by AI
  • Q3. HDD procedure
  • Ans. 

    HDD procedure refers to the process of installing and configuring a hard disk drive in a computer system.

    • Ensure the HDD is compatible with the computer system

    • Physically install the HDD in the appropriate bay

    • Connect the necessary cables to the HDD and motherboard

    • Configure the HDD in the BIOS settings

    • Format the HDD and install the operating system

    • Test the HDD for proper functionality

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic of pipeline and brief knowledge required.

Skills evaluated in this interview

I applied via Referral and was interviewed before Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Mainly consantraint for pump and high temp lines and material.

Interview Preparation Tips

Interview preparation tips for other job seekers - As above questions mention

Interview Questionnaire 

3 Questions

  • Q1. How many time u take any update shuttering system?
  • Ans. 

    The question is unclear and lacks context.

    • Please provide more information about the 'update shuttering system'.

    • Specify the time frame for the updates.

    • Clarify the purpose or objective of the updates.

    • Provide any relevant examples or scenarios.

  • Answered by AI
  • Q2. Why u want to work as a execution engineer? Why not any special team such as formwork team,or quality team?
  • Ans. 

    I want to work as an execution engineer because I enjoy the challenge of overseeing and coordinating all aspects of a project.

    • As an execution engineer, I would have the opportunity to work on a variety of projects and oversee all aspects of their execution.

    • I enjoy the challenge of coordinating different teams and ensuring that everything runs smoothly.

    • While working on a formwork or quality team would be valuable experi...

  • Answered by AI
  • Q3. As contractor farm Engineer in RCC which is most important? 1) Reinforcements 2)Formwork 3)Concrete And why?
  • Ans. 

    Concrete is the most important as it provides the strength and durability to the structure.

    • Concrete is the backbone of any RCC structure.

    • It provides the strength and durability to the structure.

    • Reinforcements and formwork are important too, but without concrete, they are useless.

    • Proper mix design and curing of concrete are crucial for the longevity of the structure.

  • Answered by AI

I applied via Company Website and was interviewed before Apr 2020. There were 4 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Load distribution under rigid and flexible footings,water tank design, steel foundation design
  • Q2. Mix design of concrete, btech project
  • Ans. 

    Mix design of concrete and BTech project

    • Mix design involves determining the proportions of cement, water, aggregates, and admixtures to achieve desired properties of concrete

    • Factors like strength, workability, durability, and cost are considered while designing the mix

    • BTech project can involve studying the effect of different mix designs on properties of concrete or developing a new mix design

    • Examples of BTech projects...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - be well prepared with basics and if you are already experienced, be prepared with site knowledge

Tell us how to improve this page.

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 753 Interviews
AECOM Interview Questions
4.2
 • 117 Interviews
Apco Infratech Interview Questions
3.7
 • 116 Interviews
AtkinsRealis Interview Questions
3.9
 • 88 Interviews
View all

Ganadhi Pati Construction Reviews and Ratings

based on 6 reviews

4.4/5

Rating in categories

4.2

Skill development

4.3

Work-life balance

4.4

Salary

4.4

Job security

4.5

Company culture

4.1

Promotions

4.2

Work satisfaction

Explore 6 Reviews and Ratings
Project Engineer
3 salaries
unlock blur

₹3 L/yr - ₹4.3 L/yr

Civil Site Engineer
3 salaries
unlock blur

₹1.5 L/yr - ₹3 L/yr

Site Engineer and Incharge
3 salaries
unlock blur

₹2.4 L/yr - ₹3 L/yr

Explore more salaries
Compare Ganadhi Pati Construction with

L&T Construction

4.0
Compare

Simplex Infrastructures

3.4
Compare

AECOM

4.2
Compare

L&T Energy Hydrocarbon

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview