I applied via Recruitment Consultant and was interviewed before Jan 2021. There was 1 interview round.
ITP stands for Inspection and Test Plan, WPR stands for Welding Procedure Record, and WPS stands for Welding Procedure Specification.
ITP is a document that outlines the inspection and testing requirements for a project.
WPR is a record of the welding procedure used during fabrication.
WPS is a document that outlines the specific welding procedure to be used for a particular joint.
All three are important documents in ensu...
posted on 11 Dec 2023
Welding quality related
based on 1 review
Rating in categories
HSE Advisor
45
salaries
| ₹7.2 L/yr - ₹20 L/yr |
Mechanical Engineer
39
salaries
| ₹6 L/yr - ₹20 L/yr |
Construction Management
33
salaries
| ₹12.5 L/yr - ₹41.1 L/yr |
Civil Engineer
21
salaries
| ₹5.5 L/yr - ₹22.2 L/yr |
Electrical Engineer
20
salaries
| ₹7.5 L/yr - ₹22.8 L/yr |
Larsen & Toubro Limited
Punj Lloyd
Simplex Infrastructures
Hindustan Construction Company