Add office photos
Employer?
Claim Account for FREE

Gaja Engineering

4.0
based on 218 Reviews
Filter interviews by

10+ New Mano Builders Interview Questions and Answers

Updated 29 Jun 2024

Q1. What is the meaning of FIFO

Ans.

FIFO stands for First In First Out. It is a method of inventory management where the oldest stock is sold first.

  • FIFO ensures that the oldest stock is sold first

  • It is commonly used in industries with perishable goods such as food and pharmaceuticals

  • It helps prevent spoilage and waste of products

  • FIFO is also used in accounting to calculate the cost of goods sold

  • Example: A grocery store uses FIFO to ensure that the oldest produce is sold first to prevent spoilage

Add your answer

Q2. How can find out the hazard

Ans.

To find out hazards, conduct thorough risk assessments, inspect the workplace, analyze incident reports, and involve employees in hazard identification.

  • Conduct risk assessments to identify potential hazards

  • Inspect the workplace regularly to identify any new hazards

  • Analyze incident reports to identify recurring hazards

  • Involve employees in hazard identification through safety meetings or suggestion programs

View 1 answer

Q3. How much of limmunition inside tunnel

Ans.

The amount of ammunition inside a tunnel should be limited based on safety regulations.

  • The amount of ammunition stored inside a tunnel should be determined by the tunnel's size and ventilation system.

  • The type of ammunition being stored should also be taken into consideration.

  • The maximum amount of ammunition allowed inside a tunnel should be determined by safety regulations and guidelines.

  • Regular inspections and maintenance should be conducted to ensure the safe storage of amm...read more

Add your answer

Q4. What is the store operation

Ans.

Store operation refers to the process of managing and maintaining inventory in a retail store.

  • Receiving and inspecting incoming shipments

  • Organizing and storing products in the appropriate location

  • Maintaining accurate inventory records

  • Issuing products to customers or other departments

  • Performing regular stock checks and audits

Add your answer
Discover New Mano Builders interview dos and don'ts from real experiences

Q5. How to purchase material

Ans.

To purchase material, one must follow a systematic process that involves identifying the need, selecting a supplier, negotiating terms, and placing an order.

  • Identify the need for the material

  • Select a supplier based on quality, price, and delivery time

  • Negotiate terms such as payment, delivery, and returns

  • Place an order and follow up on delivery

  • Maintain records of purchases for future reference

Add your answer

Q6. How to chuck transferems

Ans.

To chuck transferems, ensure proper labeling and packaging, and follow established protocols for disposal.

  • Label transferems with appropriate information such as date, contents, and destination.

  • Package transferems securely to prevent leaks or spills during transport.

  • Follow established protocols for disposal, which may include incineration or chemical treatment.

  • Ensure compliance with all relevant regulations and guidelines.

  • Train staff on proper handling and disposal procedures....read more

Add your answer
Are these interview questions helpful?

Q7. Which IS Code is used for Rcc structure?

Ans.

IS 456 is used for RCC structures.

  • IS 456 is the Indian Standard Code of Practice for Plain and Reinforced Concrete.

  • It provides guidelines for the design and construction of RCC structures.

  • It covers various aspects such as materials, design, construction, and quality control.

  • It is widely used in India for the design and construction of RCC structures.

  • Other relevant IS codes for RCC structures include IS 875, IS 13920, and IS 1786.

Add your answer

Q8. Tunnel which standard follow

Ans.

Tunnels must follow safety standards set by regulatory bodies and organizations.

  • Tunnels must follow safety standards set by regulatory bodies and organizations such as OSHA, NFPA, and ANSI.

  • Standards may vary depending on the type of tunnel, its location, and its purpose.

  • Some common safety standards for tunnels include proper ventilation, lighting, emergency exits, and fire suppression systems.

  • Tunnel operators must also conduct regular safety inspections and train employees on...read more

Add your answer
Share interview questions and help millions of jobseekers 🌟

Q9. What is the full from of ETABS?

Ans.

ETABS stands for Extended 3D Analysis of Building Systems.

  • ETABS is a software used for structural analysis and design of buildings.

  • It allows for the creation of 3D models of buildings and analysis of their behavior under various loads.

  • ETABS can be used for designing structures made of steel, concrete, or composite materials.

  • The software is widely used in the construction industry for designing high-rise buildings, bridges, and other structures.

  • ETABS is developed by Computers ...read more

Add your answer

Q10. what is the file formate for ETABS?

Ans.

The file format for ETABS is .EDB

  • ETABS saves files in .EDB format

  • This format is used to store the model and analysis data

  • Other file formats used by ETABS include .E2K and .ET

  • The .E2K format is used for importing and exporting data to other software

  • The .ET format is used for exporting data to Excel

Add your answer

Q11. Experience in Waste/Water Treatment

Ans.

I have extensive experience in waste and water treatment processes, including designing and implementing treatment systems.

  • Designed and implemented a wastewater treatment system for a manufacturing plant, reducing pollution and ensuring compliance with environmental regulations.

  • Developed process improvements for a municipal water treatment plant, resulting in increased efficiency and cost savings.

  • Managed a team of engineers and technicians in the operation and maintenance of ...read more

View 2 more answers

Q12. Procurement of materials within the budget

Ans.

Procurement of materials within budget is crucial for efficient supply chain management.

  • Develop a detailed budget for procurement expenses

  • Regularly monitor and track expenses to ensure they stay within budget

  • Negotiate with suppliers for better pricing or discounts

  • Consider alternative suppliers or materials to reduce costs

  • Implement cost-saving measures such as bulk purchasing or inventory management

  • Utilize technology for procurement process optimization

Add your answer

Q13. TDS of River Water

Ans.

TDS of River Water

  • TDS stands for Total Dissolved Solids

  • It measures the concentration of dissolved solids in water

  • TDS includes minerals, salts, metals, and other substances

  • High TDS levels can affect water quality and taste

  • TDS can be measured using a TDS meter or through laboratory analysis

View 1 answer

Q14. Costing of DI PIPES, HDPE PIPES

Ans.

Costing of DI PIPES and HDPE PIPES involves considering material costs, manufacturing processes, transportation, and overhead expenses.

  • Consider material costs for ductile iron (DI) pipes and high-density polyethylene (HDPE) pipes.

  • Factor in manufacturing processes such as casting and extrusion for DI and HDPE pipes respectively.

  • Include transportation costs for delivering the pipes to the desired location.

  • Take into account overhead expenses like labor, utilities, and administra...read more

Add your answer

Q15. Had you deal with fatal accidents

Ans.

Yes, I have dealt with fatal accidents in my previous role as HR Manager.

  • I have provided support to employees and their families during such incidents

  • I have worked with management to ensure proper communication and support is provided to affected employees

  • I have also reviewed and updated safety protocols to prevent future incidents

  • For example, in one instance, an employee passed away due to a workplace accident and I worked with the management team to provide grief counseling...read more

Add your answer

Q16. What are factory acts .

Ans.

Factory acts are laws that regulate the working conditions in factories.

  • Factory acts are designed to protect the health and safety of workers.

  • They typically cover issues such as working hours, breaks, and safety equipment.

  • Examples of factory acts include the Factory Act of 1833 in the UK and the Occupational Safety and Health Act in the US.

Add your answer

Q17. Design mix, use of retarders..

Ans.

Design mix refers to the process of selecting suitable materials and proportions for concrete mixtures. Retarders are additives used to delay the setting of concrete.

  • Design mix involves selecting the right combination of cement, aggregates, water, and admixtures to achieve desired properties.

  • Retarders are chemicals added to concrete mixtures to slow down the setting time, allowing for more workability and placement time.

  • Examples of retarders include lignosulfonates, gluconate...read more

Add your answer
Contribute & help others!
Write a review
Share interview
Contribute salary
Add office photos

Interview Process at New Mano Builders

based on 23 interviews
Interview experience
4.0
Good
View more
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Top Interview Questions from Similar Companies

3.8
 • 1.4k Interview Questions
3.9
 • 253 Interview Questions
4.2
 • 237 Interview Questions
4.4
 • 218 Interview Questions
3.8
 • 211 Interview Questions
3.9
 • 208 Interview Questions
View all
Top Gaja Engineering Interview Questions And Answers
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
70 Lakh+

Reviews

5 Lakh+

Interviews

4 Crore+

Salaries

1 Cr+

Users/Month

Contribute to help millions

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter