Filter interviews by
I applied via Referral and was interviewed in Dec 2021. There were 2 interview rounds.
SEBI LODR
I applied via Referral and was interviewed in Aug 2019. There were 3 interview rounds.
Yes, multiple MMEs can be configured in a single eNodeB.
Multiple MMEs (Mobility Management Entities) can be configured in a single eNodeB (Evolved Node B) in LTE networks.
This configuration allows for load balancing and redundancy.
Each MME can handle control plane signaling for a subset of connected UEs (User Equipment).
The eNodeB distributes the UEs among the available MMEs based on various factors like load and capac...
Check network connectivity, restart MME, check configuration settings.
Check if there is any issue with the network connectivity
Restart the MME and check if the alarm disappears
Verify the configuration settings of the MME
Check if there is any hardware failure
Contact the vendor for further assistance
Integration process refers to the process of combining different systems or components into a single unified system.
Integration involves connecting different systems or components to work together seamlessly
It can involve data integration, application integration, or system integration
Integration can be achieved through APIs, middleware, or custom code
Examples of integration include integrating a CRM system with a mark...
I applied via Walk-in and was interviewed before Mar 2020. There was 1 interview round.
I applied via Naukri.com and was interviewed before Sep 2020. There was 1 interview round.
Hydrotest procedure is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water and pressurizing it.
The vessel or pipeline is filled with water and pressurized to a specified level
The pressure is held for a specified amount of time to check for leaks or deformations
The test is usually performed before commissioning or after repairs
The test pressure and duration are deter...
HDD procedure refers to the process of installing and configuring a hard disk drive in a computer system.
Ensure the HDD is compatible with the computer system
Physically install the HDD in the appropriate bay
Connect the necessary cables to the HDD and motherboard
Configure the HDD in the BIOS settings
Format the HDD and install the operating system
Test the HDD for proper functionality
I applied via Naukri.com and was interviewed in May 2021. There was 1 interview round.
I applied via Shine and was interviewed before May 2021. There was 1 interview round.
I applied via Approached by Company and was interviewed before Jun 2022. There were 3 interview rounds.
Load factor is the ratio of the actual output of a power plant to its maximum possible output over a period of time.
Load factor is calculated by dividing the average power output by the maximum power output over a specific period.
A high load factor indicates efficient utilization of the plant's capacity, while a low load factor suggests underutilization.
It is important for assessing the economic performance of a power ...
A steam turbine in a thermal power plant converts thermal energy into mechanical energy through a series of components and processes.
Main components of a steam turbine include rotor, blades, casing, and steam inlet/outlet.
Functions of a steam turbine include converting thermal energy into mechanical energy, generating electricity, and driving the generator.
Working principle involves high-pressure steam entering the tur...
Key challenges in minimizing heat losses in thermal power generation and ensuring efficient heat transfer.
Key challenges include heat losses in the boiler, condenser, and other components leading to decreased efficiency and increased operational costs.
Considerations include proper insulation of components, regular maintenance to prevent leaks, and optimizing combustion processes.
Efficient heat transfer can be achieved ...
Primary responsibilities include ensuring smooth operation of electrical systems in a thermal power plant. Testing and commissioning a generator involves several steps.
Ensure proper maintenance and operation of electrical equipment to prevent breakdowns
Troubleshoot electrical issues and perform repairs as needed
Monitor electrical systems for efficiency and safety
Conduct regular inspections and tests to identify potenti...
Main factors affecting thermal power plant efficiency and strategies for optimization.
Main factors include boiler efficiency, turbine efficiency, heat rate, and plant load factor.
Optimization strategies include regular maintenance, use of advanced technology, and efficient fuel management.
Example project: Implementing a heat recovery system to capture waste heat and improve overall efficiency.
Example initiative: Upgrad...
I applied via Approached by Company and was interviewed before Aug 2022. There were 5 interview rounds.
Logical reasoning, numerical skill, verbal ability
I applied via Naukri.com and was interviewed in Aug 2023. There were 3 interview rounds.
Assistant Manager
12
salaries
| ₹6.5 L/yr - ₹9.5 L/yr |
Deputy Manager
11
salaries
| ₹9 L/yr - ₹15.9 L/yr |
Senior Executive
6
salaries
| ₹4.5 L/yr - ₹6.6 L/yr |
Senior Manager
6
salaries
| ₹25 L/yr - ₹42 L/yr |
Executive Accountant
5
salaries
| ₹2.4 L/yr - ₹2.7 L/yr |
Quess
L&T Construction
OPPO
Mahindra Logistics