Filter interviews by
I applied via Naukri.com and was interviewed in Jun 2021. There were 3 interview rounds.
OHSR calculation involves determining the required volume of water for a specific duration of time.
OHSR stands for Overhead Service Reservoir
The calculation involves determining the water demand of the area served by the reservoir
Factors such as population, water usage patterns, and fire-fighting requirements are considered
The formula for calculating OHSR capacity is: OHSR capacity = (Maximum daily demand x Maximum dai...
Top trending discussions
based on 1 review
Rating in categories
Assistant Manager
15
salaries
| ₹7.2 L/yr - ₹11.2 L/yr |
Engineer
11
salaries
| ₹2.4 L/yr - ₹5 L/yr |
Senior Manager
8
salaries
| ₹11.7 L/yr - ₹22 L/yr |
Executive Accountant
7
salaries
| ₹3.1 L/yr - ₹4 L/yr |
Civil Engineer
6
salaries
| ₹1.8 L/yr - ₹5 L/yr |
Larsen & Toubro Limited
Tata Projects
GMR Group
Reliance Infrastructure