Filter interviews by
I applied via Campus Placement and was interviewed before May 2022. There were 2 interview rounds.
I applied via Company Website and was interviewed in Dec 2022. There were 3 interview rounds.
Technical Questions I'm electrician and CNC Machine Knowledge
I applied via Recruitment Consulltant and was interviewed before May 2023. There was 1 interview round.
I applied via Referral and was interviewed before Oct 2020. There was 1 interview round.
Flexituff Ventures International interview questions for popular designations
I was interviewed before Feb 2021.
Managing the power of hiring compensation moral and productivity
Visit
Management relationship
Natural culture
posted on 15 Dec 2017
Salary expectations and residential situation preferences
Discuss salary expectations based on industry standards and your qualifications
Explain your preferences for residential situation, such as relocation or commuting
Provide examples of how your residential situation can positively impact your performance
Highlight any flexibility or adaptability in terms of residential preferences
I joined the company on January 15, 2018.
Joined on January 15, 2018
Have been with the company for over 3 years
Started in the role of Production Supervisor
Top trending discussions
I applied via Naukri.com and was interviewed before Aug 2021. There were 2 interview rounds.
Costing for different types of BOPP involves various factors such as raw material cost, production cost, and overhead expenses.
Raw material cost includes the cost of polypropylene resin, additives, and other materials used in the production process.
Production cost includes expenses related to labor, energy, and maintenance of machinery.
Overhead expenses include costs related to administration, marketing, and distributi...
I applied via Referral and was interviewed before Jan 2021. There were 3 interview rounds.
posted on 22 Sep 2022
I applied via Approached by Company and was interviewed in Apr 2022. There were 2 interview rounds.
Preventive maintenance is a proactive approach to maintenance that aims to prevent equipment failure before it occurs.
Regularly scheduled inspections and maintenance
Replacing worn or damaged parts before they cause a breakdown
Cleaning and lubricating equipment to prevent wear and tear
Keeping accurate records of maintenance activities
Examples: changing the oil in a car, replacing air filters in HVAC systems, inspecting
SAP PM module is used for managing maintenance activities of an organization.
PM stands for Plant Maintenance
It helps in planning and scheduling maintenance tasks
Tracks equipment and maintenance history
Provides cost analysis and reporting
Integrates with other SAP modules like MM and FI
Example: A manufacturing company can use SAP PM to schedule maintenance of their production equipment
I have handled various utilities equipments including generators, chillers, HVAC systems, and water treatment plants.
Generators: responsible for maintenance and repair of diesel and gas generators
Chillers: handled installation and maintenance of air-cooled and water-cooled chillers
HVAC systems: managed repair and maintenance of heating, ventilation, and air conditioning systems
Water treatment plants: responsible for op...
Bearings are used to reduce friction between two moving parts. There are several types of bearings.
Plain bearings
Rolling element bearings
Jewel bearings
Fluid bearings
Magnetic bearings
posted on 18 Aug 2023
I applied via Approached by Company and was interviewed in Feb 2023. There were 4 interview rounds.
based on 5 interviews
Interview experience
based on 184 reviews
Rating in categories
Assistant Manager
28
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Supervisor
26
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Engineer
20
salaries
| ₹0 L/yr - ₹0 L/yr |
Supervisor
15
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
12
salaries
| ₹0 L/yr - ₹0 L/yr |
Garware Technical Fibres
Supreme Industries
Time Technoplast
Jindal Poly Films