I applied via Walk-in and was interviewed in May 2024. There was 1 interview round.
posted on 25 Jun 2024
Grid code defines technical requirements for connecting to the grid. Critical path is the longest sequence of tasks determining project duration. Project performance measures how well project objectives are being met.
Grid code sets out technical standards and requirements for connecting power plants to the grid
Critical path is the longest sequence of tasks that determines the overall duration of a project
Project perfor...
Managing clients involves clear communication, setting expectations, building relationships, and delivering results.
Establish clear communication channels with the client to ensure understanding of project goals and timelines
Set realistic expectations and manage client's expectations throughout the project
Build a strong relationship with the client based on trust and transparency
Regularly update the client on project p...
posted on 5 Jun 2024
Optimistic costing involves estimating project costs on the lower end of the spectrum.
Identify all potential cost-saving measures and efficiencies in the project plan.
Use historical data and benchmarks to estimate costs on the lower side.
Consider best-case scenarios and optimistic assumptions when estimating costs.
Collaborate with stakeholders to gather insights and input on cost-saving opportunities.
Regularly review a...
based on 1 review
Rating in categories
Quality Engineer
4
salaries
| ₹1.2 L/yr - ₹4.8 L/yr |
Planning Engineer
4
salaries
| ₹1.4 L/yr - ₹3.1 L/yr |
Purchase Assistant
3
salaries
| ₹2.2 L/yr - ₹2.2 L/yr |
Plant Incharge
3
salaries
| ₹8.4 L/yr - ₹9.5 L/yr |
Huawei Technologies
Exotic Learning
Evision Technoserve
Cogoport