Filter interviews by
Be the first one to contribute and help others!
I applied via Campus Placement and was interviewed in May 2021. There were 4 interview rounds.
I applied via Recruitment Consultant and was interviewed in Mar 2020. There were 3 interview rounds.
posted on 10 May 2018
I applied via Company Website and was interviewed in Jan 2018. There were 2 interview rounds.
I applied via Walk-in and was interviewed before Apr 2021. There was 1 interview round.
Compilation process involves several steps to convert source code into executable code.
Preprocessing: Includes header file inclusion, macro expansion, and conditional compilation.
Compilation: Translates source code into assembly code.
Assembly: Converts assembly code into machine code.
Linking: Combines object files and libraries to create an executable file.
Loading: Loads the executable file into memory and prepares it
I applied via Campus Placement and was interviewed before Feb 2021. There were 2 interview rounds.
Quant , Logical REASONING , Java
I applied via Naukri.com and was interviewed before May 2020. There was 1 interview round.
I applied via Recruitment Consultant and was interviewed in Mar 2020. There were 4 interview rounds.
I appeared for an interview before Mar 2024, where I was asked the following questions.
Experienced Senior Engineer with a strong background in software development, project management, and team leadership.
Led a team of 10 engineers in developing a scalable web application, improving performance by 30%.
Implemented Agile methodologies, resulting in a 25% increase in project delivery speed.
Designed and optimized database systems, reducing query response time by 40%.
Mentored junior engineers, fostering a col...
I bring extensive engineering experience, innovative problem-solving skills, and a passion for enhancing urban mobility solutions.
Proven track record in designing and implementing advanced elevator systems, improving efficiency by 20%.
Strong collaboration skills demonstrated through successful cross-functional projects, leading to a 15% reduction in project timelines.
Expertise in utilizing data analytics to optimize ma...
I applied via Campus Placement and was interviewed before Feb 2021. There were 3 interview rounds.
Normalization is the process of organizing data in a database while denormalization is the process of intentionally introducing redundancy into a database.
Normalization is used to minimize data redundancy and improve data integrity.
Denormalization is used to improve query performance by reducing the number of joins needed.
Normalization involves breaking down a table into smaller tables and establishing relationships be...
Fibonacci series is a sequence of numbers where each number is the sum of the two preceding ones.
Declare variables for first two numbers of the series
Loop through the series and calculate the next number by adding the previous two
Store the result in an array or print it
Repeat until desired number of terms is reached
Types of inheritance include single, multiple, multilevel, hierarchical, hybrid, and multipath inheritance.
Single inheritance: A child class inherits from a single parent class.
Multiple inheritance: A child class inherits from multiple parent classes.
Multilevel inheritance: A child class inherits from a parent class, which in turn inherits from another parent class.
Hierarchical inheritance: Multiple child classes inher...
Object is an instance of a class while class is a blueprint for creating objects.
Class is a template or blueprint for creating objects
Object is an instance of a class
Class defines the properties and methods that an object will have
Object is created from a class using the 'new' keyword
Multiple objects can be created from a single class
based on 24 reviews
Rating in categories
Business Development Manager
5
salaries
| ₹2.7 L/yr - ₹5.1 L/yr |
Business Development Executive
5
salaries
| ₹3.3 L/yr - ₹3.9 L/yr |
Warehouse Incharge
5
salaries
| ₹2.8 L/yr - ₹3.8 L/yr |
Senior Business Development Executive
5
salaries
| ₹3.7 L/yr - ₹4.6 L/yr |
Project Manager
4
salaries
| ₹2.5 L/yr - ₹10.1 L/yr |
John Deere
KONE
Caterpillar Inc
Sigma Electric Manufacturing Corporation