Round 1 - Technical 

(5 Questions)

  • Q1. Manufacturing process
  • Q2. What is raw material
  • Ans. 

    Raw material is the basic material used in the production of goods.

    • Raw material is the primary substance or component used to manufacture products.

    • It can be natural resources like wood, metal, or minerals.

    • It can also be processed materials like chemicals or plastics.

    • Raw materials are transformed into finished products through manufacturing processes.

  • Answered by AI
  • Q3. What is clinker
  • Ans. 

    Clinker is a nodular material produced during the cement manufacturing process.

    • Clinker is a key ingredient in the production of cement.

    • It is formed by heating limestone, clay, and other materials in a kiln.

    • The cooled clinker is then ground into a fine powder to produce cement.

    • The quality of clinker greatly affects the quality of the final cement product.

  • Answered by AI
  • Q4. What is packing plant kapisity
  • Ans. 

    Packing plant capacity refers to the maximum amount of products that can be processed and packaged in a plant within a specific time frame.

    • Packing plant capacity is usually measured in units per hour or units per day.

    • It is important for production engineers to optimize the packing plant capacity to meet demand and maximize efficiency.

    • Factors that can affect packing plant capacity include equipment efficiency, productio

  • Answered by AI
  • Q5. What is coal mill kapisity
  • Ans. 

    Coal mill capacity refers to the maximum amount of coal that can be processed by the mill in a given time period.

    • Coal mill capacity is typically measured in tons per hour or tons per day.

    • It is important for production engineers to optimize coal mill capacity to meet production demands.

    • Factors affecting coal mill capacity include the type of coal, moisture content, and mill design.

    • Increasing coal mill capacity can invol...

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. What is ball mill
  • Ans. 

    A ball mill is a type of grinder used to grind and blend materials for use in mineral dressing processes, paints, pyrotechnics, ceramics, and selective laser sintering.

    • Consists of a hollow cylindrical shell rotating about its axis

    • The axis of the shell may be horizontal or at a small angle to the horizontal

    • The grinding media is the balls, which may be made of steel, stainless steel, ceramic, or rubber

    • The inner surface o...

  • Answered by AI
  • Q2. What is raw mill
  • Ans. 

    Raw mill is a machine used in cement production to grind raw materials into a fine powder before being used in the kiln.

    • Raw mill is used in the cement industry to grind raw materials like limestone, clay, and iron ore into a fine powder.

    • The powdered raw materials are then blended and heated in a kiln to form clinker, which is the intermediate product in cement production.

    • Common types of raw mills include ball mills, ro...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Dalmia Bharat Cement Production Engineer interview:
  • Production Engineering
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Recruitment Consulltant and was interviewed in Jul 2024. There were 2 interview rounds.

Round 1 - One-on-one 

(2 Questions)

  • Q1. What is the process for installing a fan for plant operations?
  • Ans. 

    The process for installing a fan for plant operations involves planning, preparation, installation, and testing.

    • Plan the location of the fan for optimal air circulation

    • Prepare the necessary tools and equipment for installation

    • Install the fan according to manufacturer's instructions

    • Test the fan to ensure proper functioning

    • Ensure proper maintenance and regular checks for optimal performance

  • Answered by AI
  • Q2. What is the heat consumption required for manufacturing 1 metric ton of cement?
  • Ans. 

    The heat consumption required for manufacturing 1 metric ton of cement varies depending on the type of cement and production process.

    • Heat consumption can range from 3.6 - 6.0 GJ per metric ton of cement produced.

    • Factors such as the type of kiln used, fuel type, and energy efficiency measures can impact heat consumption.

    • For example, dry process cement production typically requires less heat compared to wet process produ

  • Answered by AI
Round 2 - One-on-one 

(2 Questions)

  • Q1. What are your daily job responsibilities?
  • Ans. 

    Daily job responsibilities include overseeing production processes, managing staff, ensuring quality control, and meeting production targets.

    • Overseeing production processes to ensure efficiency and quality

    • Managing staff, including scheduling, training, and performance evaluations

    • Ensuring quality control measures are in place and followed

    • Meeting production targets and deadlines

    • Collaborating with other departments to opt

  • Answered by AI
  • Q2. What is the process for balancing raw materials in production?
  • Ans. 

    Balancing raw materials in production involves accurately measuring and adjusting the quantities of each material to ensure optimal production output.

    • Calculate the required quantities of each raw material based on the production schedule

    • Monitor the inventory levels of each raw material to avoid shortages or excess

    • Adjust the amounts of raw materials used in production based on quality control standards

    • Utilize software s...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Amrit Cement Production Manager interview:
  • Plant Operations
Interview preparation tips for other job seekers - Good analysis of daily job, think about kizen
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in Nov 2024. There were 2 interview rounds.

Round 1 - Aptitude Test 

Mathematics ,English and cement manufacturing process

Round 2 - HR 

(2 Questions)

  • Q1. HR sound Self introduction Qualification
  • Q2. Technical Self introduction Technical questions Manufacturing process

Interview Preparation Tips

Topics to prepare for UltraTech Cement Junior Engineer Production interview:
  • Cement chemistry
  • Cement manufacturing process
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Which type of pc firing
  • Ans. 

    PC firing refers to the type of firing system used in a power plant's boiler to ignite the fuel.

    • PC firing stands for Pulverized Coal firing, where coal is ground into fine powder before being injected into the boiler combustion chamber

    • It is a common method used in coal-fired power plants to efficiently burn coal and generate steam for electricity production

    • Other types of firing systems include fluidized bed combustion

  • Answered by AI
  • Q2. Witch type of cooler house
  • Ans. 

    The type of cooler house depends on the specific requirements of the production process, such as air flow, temperature control, and size.

    • Cooling towers for large-scale industrial production

    • Air conditioning units for smaller production facilities

    • Evaporative coolers for energy-efficient cooling solutions

    • Refrigeration units for temperature-sensitive production processes

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. Witch stage of preheater
  • Ans. 

    The preheater stage in cement production is the calciner stage.

    • The preheater typically consists of several stages including the cyclones and the calciner.

    • The calciner stage is where the raw materials are heated to high temperatures before entering the rotary kiln.

    • The calciner stage helps to reduce the energy consumption in the rotary kiln by preheating the raw materials.

    • An example of a preheater configuration is a 4-st

  • Answered by AI
  • Q2. How much capacity
  • Ans. 

    Capacity planning is crucial for ensuring optimal production output and resource utilization.

    • Capacity planning involves assessing current production capacity and forecasting future needs.

    • Factors to consider include equipment capabilities, workforce availability, and production demand.

    • Examples of capacity planning tools include production scheduling software and simulation models.

  • Answered by AI
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

General methametics and basics of chemical engineering

Round 2 - Technical 

(2 Questions)

  • Q1. Fluid dynamics heat transfer material balance
  • Q2. Plant safety and quality control
Round 3 - HR 

(1 Question)

  • Q1. Personal details and general HR questions
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Nov 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Basics about cement industry
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. What is the benefits bonus or pf
  • Ans. 

    Benefits, bonus, and PF (Provident Fund) are important components of an employee's compensation package.

    • Benefits typically include health insurance, retirement plans, paid time off, and other perks provided by the employer.

    • Bonuses are additional payments given to employees based on performance, company profits, or other criteria.

    • Provident Fund (PF) is a mandatory retirement savings scheme in India, where both the emplo...

  • Answered by AI
  • Q2. What is the salary

Interview Preparation Tips

Interview preparation tips for other job seekers - Yes
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Jan 2024. There were 2 interview rounds.

Round 1 - Technical 

(3 Questions)

  • Q1. Tell me about about yourself?family background.
  • Q2. Since I was from caustic chlorine background so they asked me about cl2 emergency handling ,TLV value
  • Q3. Hcl synthesis process,and it's interlock ,problem in hcl furnace,
Round 2 - Technical 

(2 Questions)

  • Q1. What will happen when flow of cooling water reduces in furnace?
  • Q2. What is the impact when freon compressor got tripped and what to do ?

I applied via Recruitment Consulltant and was interviewed in Jul 2022. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Work related technical questions
  • Q2. Technical Functions and process related

Interview Preparation Tips

Interview preparation tips for other job seekers - Good luck for great future
Nice to work and environment friendly

Tell us how to improve this page.

Interview Questions from Similar Companies

UltraTech Cement Interview Questions
4.2
 • 530 Interviews
JK Cement Interview Questions
4.1
 • 240 Interviews
Grasim Industries Interview Questions
4.0
 • 199 Interviews
ACC Interview Questions
3.9
 • 184 Interviews
Shree Cement Interview Questions
3.8
 • 148 Interviews
Ambuja Cements Interview Questions
3.9
 • 102 Interviews
JSW Cement Interview Questions
4.1
 • 100 Interviews
Nuvoco Vistas Interview Questions
4.2
 • 89 Interviews
View all
Quality Engineer
8 salaries
unlock blur

₹1.8 L/yr - ₹3 L/yr

Engineer
6 salaries
unlock blur

₹2 L/yr - ₹4 L/yr

Assistant Manager
5 salaries
unlock blur

₹5.4 L/yr - ₹6.5 L/yr

Finance Manager
5 salaries
unlock blur

₹5.8 L/yr - ₹7.3 L/yr

Senior Production Engineer
4 salaries
unlock blur

₹2 L/yr - ₹4.8 L/yr

Explore more salaries
Compare Esskay Group with

UltraTech Cement

4.2
Compare

JK Cement

4.1
Compare

ACC

3.9
Compare

Grasim Industries

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview