Manman Manufacturing Company Interview Questions and Answers

Updated 28 Sep 2024

Q1. what is the total cost of a residential building per built up area ?

Ans.

The total cost of a residential building per built up area depends on various factors such as location, materials used, labor costs, and amenities.

  • Total cost = Cost of land + Cost of construction + Cost of amenities

  • Cost of land can vary greatly depending on location and size of the plot

  • Cost of construction includes materials, labor, and overhead expenses

  • Cost of amenities such as landscaping, parking, and utilities should also be considered

  • Example: In a high-end neighborhood, ...read more

Add your answer

Q2. Rate of mivan shuttering per Sqm ( Material + Labour ) ?

Ans.

The rate of Mivan shuttering per Sqm includes both material and labor costs.

  • The rate of Mivan shuttering per Sqm can vary depending on factors such as location, project size, and contractor rates.

  • Material costs for Mivan shuttering may include aluminum formwork panels, pins, wedges, and other accessories.

  • Labor costs for Mivan shuttering involve the installation, dismantling, and maintenance of the formwork system.

  • For example, in a particular project, the rate of Mivan shutter...read more

Add your answer

Q3. thumb rule for calculation of mivan shuttering per sqft of built up area ?

Ans.

The thumb rule for calculation of mivan shuttering per sqft of built up area is typically around 0.15 to 0.20 sqft per sqft of built up area.

  • The thumb rule for mivan shuttering is generally around 0.15 to 0.20 sqft per sqft of built up area.

  • This rule may vary depending on the complexity of the structure and other factors.

  • For example, for a simple structure, the mivan shuttering calculation may be closer to 0.15 sqft per sqft of built up area.

  • However, for a more complex struct...read more

Add your answer

Q4. Cost calculation per built up area of Civil works ?

Ans.

Cost calculation per built up area of Civil works involves determining the total cost of construction per unit area.

  • Calculate the total cost of construction including materials, labor, equipment, and overhead expenses.

  • Divide the total cost by the built up area to get the cost per unit area.

  • Consider factors such as site conditions, complexity of design, and local market rates.

  • Example: Total cost of construction is $100,000 for a built up area of 2000 sq. ft. Cost per unit area...read more

Add your answer
Discover Manman Manufacturing Company interview dos and don'ts from real experiences

Q5. What is anchorage length in BBS ?

Ans.

Anchorage length in BBS refers to the length of reinforcement bar required to transfer the load from the bar to the concrete.

  • Anchorage length is determined based on the diameter of the reinforcement bar and the type of load it will be subjected to.

  • It is essential to ensure proper anchorage length to prevent failure of the structure.

  • Anchorage length is typically specified in building codes and design standards.

  • For example, in a column reinforcement schedule, the anchorage leng...read more

Add your answer

Q6. ERP for management budgeting in Real Estate

Ans.

ERP systems are commonly used in Real Estate for management budgeting.

  • ERP systems help in integrating financial data for better budgeting and forecasting in Real Estate.

  • They streamline processes like expense tracking, revenue management, and financial reporting.

  • Examples of ERP systems used in Real Estate include Yardi, MRI Software, and RealPage.

  • These systems provide real-time insights and analytics to make informed budgeting decisions.

Add your answer

Q7. Coefficient of Steel & Concrete ?

Ans.

The coefficient of steel and concrete refers to the thermal expansion properties of these materials.

  • The coefficient of thermal expansion for steel is typically around 12 x 10^-6 /°C.

  • The coefficient of thermal expansion for concrete is typically around 10 x 10^-6 /°C.

  • These coefficients are important to consider when designing structures to account for temperature changes.

Add your answer

Q8. Lap zone in column ?

Ans.

Lap zone in column refers to the overlapping region where two reinforcement bars are spliced together.

  • Lap zone is typically located in the middle third of the column height for better load distribution.

  • Proper lap length and lap splice configuration are crucial for structural integrity.

  • Lap splices are commonly used in reinforced concrete columns to achieve required strength.

  • Lap length is determined based on the diameter of the reinforcement bars and the structural design requi...read more

Add your answer
Contribute & help others!
Write a review
Share interview
Contribute salary
Add office photos
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Top Interview Questions from Similar Companies

3.7
 • 6.2k Interview Questions
3.9
 • 1.9k Interview Questions
3.7
 • 339 Interview Questions
3.8
 • 210 Interview Questions
3.9
 • 135 Interview Questions
View all
Top Esbee Realty Interview Questions And Answers
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
70 Lakh+

Reviews

5 Lakh+

Interviews

4 Crore+

Salaries

1 Cr+

Users/Month

Contribute to help millions
Get AmbitionBox app

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter