i
Epsilon Electronics
Filter interviews by
Be the first one to contribute and help others!
I applied via Referral and was interviewed before Sep 2020. There was 1 interview round.
posted on 8 Jul 2021
I applied via Referral and was interviewed in Feb 2020. There were 6 interview rounds.
posted on 14 Jan 2022
I applied via Referral and was interviewed before Jan 2021. There were 3 interview rounds.
posted on 13 Jan 2024
I applied via Referral and was interviewed before Jan 2023. There were 2 interview rounds.
Ap per your job profile
posted on 11 Jun 2022
PPAP documents are developed in the Production Part Approval Process (PPAP) face.
PPAP documents are developed during the production part approval process.
This is typically the fourth phase of the APQP (Advanced Product Quality Planning) process.
PPAP documents include items such as control plans, FMEAs, and measurement system analysis.
The purpose of PPAP is to ensure that all parts meet customer requirements and specifi...
The shrinkage value of pa66 varies depending on the specific grade and processing conditions.
Shrinkage is the reduction in size of a molded part as it cools and solidifies.
The shrinkage value of pa66 can range from 1.5% to 3.5%.
Factors that affect shrinkage include mold design, processing parameters, and part geometry.
It is important to account for shrinkage when designing molds and parts to ensure proper fit and funct
I applied via Campus Placement and was interviewed before Oct 2022. There were 3 interview rounds.
UVM is a methodology for verifying complex designs using SystemVerilog. Blocking assignments execute sequentially, while non-blocking assignments execute concurrently.
UVM (Universal Verification Methodology) is a standardized methodology for verifying complex designs in SystemVerilog.
Blocking assignments in SystemVerilog execute sequentially, meaning the next statement waits for the current statement to finish.
Non-bloc...
I applied via LinkedIn and was interviewed in Jul 2024. There were 4 interview rounds.
Previous work clarity is essential for successful collaboration and understanding of project requirements.
Clearly explain the projects you have worked on in the past, including your role and responsibilities
Provide examples of how you communicated with team members to ensure clarity in project goals
Discuss any challenges you faced in previous projects and how you overcame them
Bit manipulation, memory layout, interrupts, semaphore mutex, implement memcpy, sorting, algo to share resource equally
based on 4 reviews
Rating in categories
Test Engineer
4
salaries
| ₹2 L/yr - ₹3.2 L/yr |
Accountant
3
salaries
| ₹2 L/yr - ₹2.5 L/yr |
Junior Engineer
3
salaries
| ₹1.8 L/yr - ₹2 L/yr |
Embedded Developer
3
salaries
| ₹2.5 L/yr - ₹3.8 L/yr |
Smiiel - A Unit Of Motherson Sumi System
Samsung Semiconductor
STJ Electronics
PICL