OEE can be calculated by multiplying Availability, Performance, and Quality.
Calculate Availability: (Operating Time - Downtime) / Operating Time
Calculate Performance: (Ideal Cycle Time * Total Count) / Operating Time
Calculate Quality: Good Count / Total Count
Multiply Availability, Performance, and Quality to get OEE
Example: Availability = (400 - 50) / 400 = 0.875, Performance = (2 * 350) / 400 = 1.75, Quality = 300 / 3
Implemented 5S methodology to improve efficiency and organization in the production line.
Implemented visual management tools to streamline workflow
Standardized work processes to reduce variability
Engaged employees in continuous improvement initiatives
Reduced waste by optimizing inventory management
Conducted regular Gemba walks to identify improvement opportunities
posted on 26 Sep 2024
Overall equipment effectiveness (OEE) is a measure of how well a manufacturing process is performing.
OEE is calculated by multiplying availability, performance, and quality rates.
It helps identify areas for improvement in production processes.
Example: If a machine has an availability of 90%, performance of 95%, and quality of 98%, the OEE would be 83.7%.
posted on 21 Aug 2023
What is productivity
I applied via Indeed and was interviewed before Jun 2021. There were 2 interview rounds.
posted on 29 Sep 2022
I applied via Company Website and was interviewed in Jan 2022. There were 2 interview rounds.
posted on 15 Sep 2023
I applied via Referral and was interviewed before Sep 2022. There were 3 interview rounds.
Related basic knowledge
posted on 28 Nov 2023
I applied via Recruitment Consulltant and was interviewed before Nov 2022. There were 2 interview rounds.
Line balancing is the process of evenly distributing work tasks among production line workers to optimize efficiency.
Line balancing aims to minimize idle time and maximize productivity.
It involves analyzing the tasks required in a production process and assigning them to workers in a way that minimizes bottlenecks.
The goal is to achieve a smooth flow of work and ensure that no worker is overloaded while others are idle...
OEE stands for Overall Equipment Efficiency. It is a measure of how effectively a production line or machine is utilized.
OEE is calculated by multiplying Availability, Performance, and Quality factors.
Availability measures the percentage of time the machine is available for production.
Performance measures the speed at which the machine operates compared to its maximum potential.
Quality measures the percentage of good-q...
I am a production engineer with experience in optimizing manufacturing processes and improving efficiency.
Experienced in analyzing production data and identifying areas for improvement
Proficient in using Lean and Six Sigma methodologies to streamline operations
Implemented cost-saving measures that resulted in a 20% reduction in production expenses
Collaborated with cross-functional teams to develop and implement new pro
Seeking new challenges and growth opportunities.
Looking for a company that aligns better with my career goals.
Seeking a more dynamic and innovative work environment.
Wanting to broaden my skill set and learn new technologies.
Desire for increased responsibility and leadership opportunities.
Company restructuring or downsizing.
Commute or relocation reasons.
Personal reasons or family commitments.
posted on 7 Apr 2022
5S is a methodology for workplace organization and VSM is a tool for process improvement.
5S stands for Sort, Set in Order, Shine, Standardize, and Sustain
5S helps to improve efficiency, safety, and quality in the workplace
VSM stands for Value Stream Mapping
VSM is used to identify and eliminate waste in a process
VSM helps to improve lead time, quality, and cost
Both 5S and VSM are commonly used in Lean manufacturing
Production Engineer
21
salaries
| ₹2 L/yr - ₹6 L/yr |
Quality Engineer
10
salaries
| ₹2 L/yr - ₹3.6 L/yr |
Design Engineer
8
salaries
| ₹2.5 L/yr - ₹3.5 L/yr |
Purchase Executive
7
salaries
| ₹3.4 L/yr - ₹4.5 L/yr |
Senior Production Engineer
6
salaries
| ₹3 L/yr - ₹5 L/yr |
Pall Corporation
Eaton Corporation
Donaldson India Filter Systems
Mann And Hummel Filter