I applied via Company Website and was interviewed before Jun 2023. There was 1 interview round.
I applied via Campus Placement and was interviewed before Mar 2020. There were 4 interview rounds.
I applied via Recruitment Consultant and was interviewed in Feb 2021. There were 3 interview rounds.
I applied via Job Fair and was interviewed in May 2022. There were 5 interview rounds.
Science Technology System Aptitude Technical Good Works Group Discussion Education
Good Education Science Technology Works
System Education Life is Good Help
I applied via Naukri.com and was interviewed in Apr 2024. There were 3 interview rounds.
Basic knowledge of the candidates
Program out put and input question
Giveing a situation and ask for the results
The VT pump installation process involves several steps. The raising main has multiple valves of different types. The cooling lubrication system is also important.
The VT pump installation process involves selecting the right location for the pump, preparing the foundation, and installing the pump.
The raising main typically has gate valves, check valves, and air release valves.
The cooling lubrication system is responsib...
I am looking for new challenges and opportunities for growth.
Seeking new challenges and opportunities for growth
Wanting to expand my skill set and knowledge
Desire for a higher level of responsibility
Seeking a better work-life balance
Unsatisfied with the current work environment or company culture
I expect a competitive salary that reflects my experience and the responsibilities of the Assistant Manager role.
I am looking for a salary that is in line with industry standards and the level of responsibility associated with the Assistant Manager position.
I have researched the average salary range for Assistant Managers in this industry and location, and I believe my skills and experience warrant a salary within that...
I applied via Company Website and was interviewed before Mar 2022. There was 1 interview round.
The manufacturing of cement involves chemical reactions with water, resulting in the durability of concrete.
Cement is made by heating limestone, clay, and other materials in a kiln
The chemical reaction between cement and water, known as hydration, results in the hardening of concrete
The durability of concrete depends on factors such as the water-cement ratio, curing time, and quality of materials used
Calculate deflection at free end of cantilever beam with point load at end
Use the formula: δ = (PL³)/(3EI)
P is the point load at the end
L is the length of the cantilever beam
E is the modulus of elasticity of the beam material
I is the moment of inertia of the beam's cross-sectional area
Example: A steel cantilever beam with a length of 2 meters and a point load of 500 N at the end has a deflection of 0.104 mm
Camber is the slope provided to the road surface to drain off rainwater. It is achieved by raising the center of the road surface.
Camber is the curvature provided to the road surface to ensure proper drainage of rainwater.
It is achieved by raising the center of the road surface.
The amount of camber depends on the width of the road and the expected rainfall.
The steps for the construction of a road include surveying, cle...
Admixtures are chemicals added to concrete to enhance its properties. They affect the workability, strength, and durability of concrete.
Admixtures are added to concrete to improve its quality and performance.
They can affect the setting time, workability, strength, and durability of concrete.
Examples of admixtures include water reducers, accelerators, retarders, air-entraining agents, and superplasticizers.
Hoop stress is the stress exerted circumferentially in a cylindrical or spherical object. Reinforcement in a dome can be provided by using steel bars or mesh.
Hoop stress is caused by the pressure inside the object and is calculated using the formula P*r/t, where P is the pressure, r is the radius, and t is the thickness of the object.
In a dome, reinforcement can be provided by using steel bars or mesh that are placed i...
Estimation and costing involves calculating the expenses of a project. No. of bricks required in 1 m3 of brickwork depends on the size of the bricks. There are various types of contracts in construction.
Estimation and costing involves calculating the expenses of a project, including materials, labor, and other costs.
No. of bricks required in 1 m3 of brickwork depends on the size of the bricks used. For example, if stan...
I applied via Walk-in and was interviewed before Jan 2022. There were 3 interview rounds.
I applied via Naukri.com and was interviewed before Jun 2023. There were 2 interview rounds.
based on 2 interviews
Interview experience
based on 40 reviews
Rating in categories
Assistant Manager
6
salaries
| ₹5 L/yr - ₹5.3 L/yr |
Cashier
5
salaries
| ₹1.4 L/yr - ₹2.8 L/yr |
Business Operations Associate
5
salaries
| ₹1.7 L/yr - ₹3 L/yr |
HR Executive
5
salaries
| ₹3.3 L/yr - ₹4.3 L/yr |
Shift Engineer
5
salaries
| ₹3.8 L/yr - ₹4.1 L/yr |
Adlabs Imagica
PVR Inox
Carnival Cinemas
Smaaash Entertainment