Filter interviews by
I applied via Recruitment Consulltant and was interviewed in Feb 2024. There were 2 interview rounds.
Top trending discussions
A working drum elements system is a mechanism that allows for the efficient and effective movement of drums.
The system should be designed to handle drums of various sizes and weights
It should include components such as rollers, conveyors, and lifters
The system should be automated to reduce manual labor and increase productivity
Regular maintenance and inspections are necessary to ensure the system is functioning properl
posted on 16 Aug 2021
posted on 14 Jan 2022
posted on 2 Apr 2022
I applied via Referral and was interviewed in Jan 2022. There were 4 interview rounds.
Expected CTC should be based on the candidate's experience, skills, and the industry standards.
Consider the candidate's years of experience in the field
Take into account the candidate's technical skills and expertise
Research industry standards for Senior Engineer salaries
Discuss with the candidate their salary expectations and negotiate if needed
posted on 12 Sep 2023
I have know all the basics ideas
A linked list in Java is a data structure that consists of a sequence of elements where each element points to the next element in the sequence.
Each element in a linked list is called a node.
Nodes in a linked list are connected through pointers or references.
Linked lists can be singly linked (each node points to the next node) or doubly linked (each node points to both the next and previous nodes).
Example: LinkedList
I applied via LinkedIn and was interviewed before Jun 2023. There were 2 interview rounds.
The critical path is the longest sequence of tasks in a project that must be completed on time in order for the project to finish on schedule.
Identifying the critical path helps in determining the minimum time needed to complete a project.
It consists of tasks that have zero slack or float, meaning any delay in these tasks will delay the entire project.
Activities on the critical path are often marked with a double line ...
I will plan a 50 Mwp project by conducting feasibility studies, creating a detailed project timeline, securing necessary permits, sourcing materials and contractors, and implementing a quality control plan.
Conduct feasibility studies to assess site suitability and potential challenges
Create a detailed project timeline outlining key milestones and deadlines
Secure necessary permits and approvals from local authorities
Sou...
MSP (Microsoft Project) is a project management software developed by Microsoft, while Primavera is a project management software developed by Oracle.
MSP is developed by Microsoft, while Primavera is developed by Oracle.
MSP is more commonly used for smaller projects, while Primavera is preferred for larger and more complex projects.
MSP is known for its user-friendly interface and ease of use, while Primavera is known f...
posted on 2 Feb 2024
I applied via Approached by Company and was interviewed in Aug 2023. There were 3 interview rounds.
posted on 6 Sep 2023
based on 1 interview
Interview experience
Assistant Manager
52
salaries
| ₹5.5 L/yr - ₹19 L/yr |
Deputy Manager
19
salaries
| ₹11 L/yr - ₹24 L/yr |
Senior Engineer
16
salaries
| ₹5.4 L/yr - ₹15 L/yr |
Engineer
12
salaries
| ₹2 L/yr - ₹7.1 L/yr |
Senior Manager
8
salaries
| ₹15 L/yr - ₹20.5 L/yr |
Vestas
Dhoot Transmission
Siemens Energy
Danfoss Power Solutions