I applied via Naukri.com and was interviewed in Aug 2023. There was 1 interview round.
Takt Time is the rate at which a product must be produced in order to meet customer demand.
Takt Time is calculated by dividing the available production time by the customer demand.
It helps in determining the pace of production to match customer requirements.
For example, if there are 480 minutes of production time in a day and customer demand is 240 units, the Takt Time would be 2 minutes per unit.
Cycle time is the total time taken to complete a task or process from start to finish.
Cycle time is a key metric in manufacturing and production processes.
It includes all the time spent on value-added and non-value-added activities.
For example, in a manufacturing plant, cycle time could be the time taken to produce one unit of a product.
Reducing cycle time can lead to increased efficiency and productivity.
Final demand of customer can be calculated by analyzing historical sales data, market trends, customer preferences, and forecasting future demand.
Collect and analyze historical sales data to identify patterns and trends
Consider market trends and external factors that may impact demand
Take into account customer preferences and feedback
Use forecasting techniques such as time series analysis or regression models to predic...
Top trending discussions
I applied via Company Website and was interviewed in Oct 2024. There was 1 interview round.
Program to count consecutive characters in a string
Iterate through the string and compare each character with the next one
Maintain a count for each character and append to the output string when a different character is encountered
Example: input 'aabbccc' -> output 'a2b2c3'
Dynamic xpath is a way to locate elements on a web page based on changing attributes or positions.
Use functions like contains(), starts-with(), or ends-with() to create dynamic xpaths
Avoid using indexes in xpaths as they can change with page updates
Consider using unique attributes or text within the element to create a reliable xpath
PUT is used to update or replace an entire resource, while PATCH is used to update specific fields of a resource.
PUT is idempotent, meaning multiple identical requests will have the same effect as a single request.
PATCH is not necessarily idempotent, as multiple identical requests may have different effects.
PUT requires the client to send the entire updated resource, while PATCH only requires the client to send the spe
Java hashmap and strings
I applied via Naukri.com and was interviewed in Sep 2023. There was 1 interview round.
Profile of surface refers to the 3D deviation of a surface from its perfect form, while Profile of line refers to the 2D deviation of a line from its perfect form.
Profile of surface is a 3D measurement, while Profile of line is a 2D measurement
Profile of surface considers the entire surface, while Profile of line focuses on a specific line on the surface
Profile of surface is used to evaluate the overall shape and form ...
Sheet metal parts can be measured using various tools and techniques to ensure accuracy and quality.
Use calipers to measure dimensions such as length, width, and thickness.
Utilize a micrometer for more precise measurements of thickness.
Perform a visual inspection to check for any defects or imperfections.
Use a coordinate measuring machine (CMM) for complex geometries and tight tolerances.
Verify measurements against eng...
Yes, sheet metal parts often require fixtures to hold them in place during manufacturing processes.
Sheet metal parts often have complex shapes that require fixtures to ensure accurate and consistent manufacturing.
Fixtures can be custom-designed to hold the sheet metal parts securely in place during processes such as cutting, bending, and welding.
Common types of fixtures for sheet metal parts include clamps, jigs, and s...
Cp and Cpk are process capability indices used to measure how well a process is performing within specification limits.
Cp measures how well the process spread fits within the specification limits
Cpk measures how centered the process is between the specification limits
Cp and Cpk are calculated using the formula: Cp = (USL - LSL) / (6 * standard deviation) and Cpk = min((USL - mean) / (3 * standard deviation), (mean - LS...
I applied via Approached by Company and was interviewed in Apr 2024. There was 1 interview round.
I have extensive experience working with optical fibre in the field, including installation, maintenance, and troubleshooting.
Installed optical fibre cables in various environments such as residential buildings, commercial offices, and data centers
Performed regular maintenance checks to ensure optimal performance of optical fibre networks
Troubleshooted and resolved issues related to signal loss, connectivity problems, ...
I applied via LinkedIn and was interviewed in Apr 2024. There were 2 interview rounds.
Learn techstack for which you are having interview
The integer list of 1 to 10 can be represented as an array of strings.
Create an array of strings containing numbers from 1 to 10
Each element in the array should be a string representation of the corresponding number
Example: ['1', '2', '3', '4', '5', '6', '7', '8', '9', '10']
I applied via Company Website and was interviewed in Feb 2024. There was 1 interview round.
Choose any one topic
based on 1 interview
Interview experience
Deputy Manager
4
salaries
| ₹8.3 L/yr - ₹16 L/yr |
Assistant Manager
3
salaries
| ₹6.8 L/yr - ₹9.8 L/yr |
Senior Engineer
3
salaries
| ₹4.5 L/yr - ₹6.6 L/yr |
Senior Purchase Executive
3
salaries
| ₹4.6 L/yr - ₹5.4 L/yr |
Samvardhana Motherson Group
Lumax Industries
Super Auto India
Spark Minda