Filter interviews by
I applied via Company Website and was interviewed in Sep 2022. There were 5 interview rounds.
The production target in Vice depends on various factors such as the type of product, production capacity, and demand.
The production target can vary from day to day depending on the demand for the product.
Factors such as production capacity and efficiency also play a crucial role in determining the production target.
For example, if the production capacity is 1000 pcs per day and the demand is 800 pcs, the production ta...
The temperature so determined
Top trending discussions
posted on 15 Jun 2024
I applied via Naukri.com and was interviewed in May 2024. There was 1 interview round.
I applied via Company Website and was interviewed in Sep 2024. There were 2 interview rounds.
Aptitude and basic knowledge of Plant working
I am a dedicated and experienced Production Engineer with a strong background in manufacturing processes and quality control.
Bachelor's degree in Mechanical Engineering
5+ years of experience in production engineering
Proficient in CAD software and process optimization
Led successful projects to improve production efficiency
Strong problem-solving skills and attention to detail
Bachelor's degree in Mechanical Engineering
Bachelor's degree in Mechanical Engineering
Relevant coursework in production engineering
Hands-on experience with production processes
Continuing education in relevant fields
Yes, I have 3 years of work experience in production engineering at XYZ Company.
Worked on optimizing production processes to increase efficiency
Collaborated with cross-functional teams to troubleshoot issues and implement solutions
Implemented lean manufacturing principles to reduce waste and improve productivity
I have completed 5 projects during my academic tenure, each with unique challenges.
Developing a solar-powered water desalination system - faced issues with optimizing energy efficiency
Designing a robotic arm for industrial applications - encountered difficulties with programming and calibration
Creating a prototype for a smart irrigation system - struggled with sensor integration and data analysis
Implementing a lean man...
posted on 18 Dec 2024
I applied via Naukri.com and was interviewed in Jun 2024. There were 2 interview rounds.
Productivity can be increased by implementing efficient processes, providing proper training, setting clear goals, and utilizing technology.
Implement efficient processes to streamline workflow
Provide proper training to employees to improve skills and knowledge
Set clear goals and expectations to keep employees focused
Utilize technology to automate tasks and improve efficiency
The weight of the batch is 500 kg.
The weight of the batch is 500 kg.
Ensure to use a calibrated scale to accurately measure the weight.
Record the weight in the production log for documentation purposes.
How do you calculate the batch weight of a kneader?
I applied via Naukri.com and was interviewed in Jun 2023. There were 2 interview rounds.
5S is a workplace organization method that focuses on creating a clean and efficient work environment. FIFO stands for First In, First Out and is a method used to manage inventory and ensure older items are used or sold first.
5S is a methodology for organizing and maintaining a clean and efficient workplace.
It involves five steps: Sort, Set in Order, Shine, Standardize, and Sustain.
FIFO is a method used to manage inven...
OEE (Overall Equipment Efficiency) is a calculation used to measure the effectiveness of a production process.
OEE is a metric that combines availability, performance, and quality to assess the overall efficiency of equipment or a production line.
It is calculated by multiplying the availability, performance, and quality factors together.
OEE provides insights into how well the equipment is being utilized and identifies a...
TPM-JH stands for Total Productive Maintenance - Jishu Hozen.
TPM-JH is a maintenance methodology used in manufacturing industries.
It focuses on maximizing equipment effectiveness and minimizing downtime.
TPM-JH involves proactive maintenance activities and employee involvement.
It aims to improve overall equipment efficiency and reduce defects.
Examples of TPM-JH techniques include autonomous maintenance and planned maint
7QC tools are a set of quality control tools used in production engineering to identify and solve quality-related issues.
7QC tools are also known as the 7 basic tools of quality.
These tools are used to analyze data, identify problems, and make data-driven decisions.
Examples of 7QC tools include Pareto charts, cause-and-effect diagrams, control charts, and scatter diagrams.
These tools help in improving process efficienc...
Six Sigma is a data-driven methodology used to improve business processes by reducing defects and variability.
Six Sigma aims to achieve near-perfect quality by minimizing process variation.
It uses statistical analysis to identify and eliminate sources of defects.
The goal is to reduce defects to a level of 3.4 per million opportunities.
Six Sigma follows a structured approach known as DMAIC: Define, Measure, Analyze, Imp...
Bakido and chokorate are not recognized terms in the field of production engineering.
Bakido and chokorate are not commonly used terms in production engineering.
There is no known definition or explanation for bakido and chokorate in the context of production engineering.
It is possible that the interviewer made a mistake or was referring to something unrelated to the field.
Kaizen is a Japanese term meaning continuous improvement. It refers to the philosophy of making small, incremental changes to improve processes and systems.
Kaizen is a key principle of Lean manufacturing and Six Sigma methodologies.
It involves identifying and eliminating waste, reducing defects, and improving efficiency.
Kaizen encourages employee involvement and empowerment in the improvement process.
Examples of kaizen...
PPLH stands for Pilot Proficiency and Learning Hours.
PPLH is a measure of the time a pilot spends on training and practicing to improve their skills.
It includes both flight hours and ground-based learning activities.
PPLH is important for maintaining and enhancing pilot proficiency and safety.
Examples of PPLH activities include simulator sessions, classroom instruction, and flight training exercises.
PPM stands for Parts Per Million, a unit used to measure the concentration of a substance in a solution or mixture.
PPM is a ratio of the number of parts of a substance to one million parts of the solution or mixture.
It is commonly used in various industries, such as manufacturing, environmental monitoring, and quality control.
For example, in manufacturing, PPM can be used to measure the defect rate in a production proc...
Manpower handling refers to the management and coordination of human resources in a production environment.
Manpower handling involves tasks such as workforce planning, recruitment, training, and performance management.
It also includes assigning tasks, monitoring progress, and ensuring a safe and productive work environment.
Effective manpower handling is crucial for optimizing production processes and meeting production...
Rejection analysis is a process of identifying and analyzing the reasons for product rejection or failure.
Rejection analysis helps in identifying the root causes of product rejection or failure.
It involves collecting and analyzing data related to rejected products.
The analysis helps in implementing corrective actions to prevent future rejections.
Rejection analysis can involve various techniques such as statistical anal...
Instruments knowledge refers to the understanding and familiarity with various tools and equipment used in production engineering.
Knowledge of different types of instruments used in production engineering
Understanding of how to operate and calibrate instruments
Ability to troubleshoot and maintain instruments
Knowledge of safety protocols and regulations related to instrument usage
Familiarity with software and computer s...
Manpower refers to the total number of workers or employees in a company or organization.
Manpower is a term used to describe the human resources or workforce available in a company.
It includes all the employees, workers, and staff members who contribute to the production process.
Manpower is an important factor in determining the productivity and efficiency of a company.
It can be measured in terms of the number of emplo...
The 5 human weaknesses are fear, greed, laziness, ignorance, and ego.
Fear: Humans are often driven by fear, which can limit their actions and decision-making.
Greed: The desire for more can lead to unethical behavior and a lack of contentment.
Laziness: Humans have a tendency to procrastinate and avoid hard work.
Ignorance: Lack of knowledge or awareness can hinder growth and understanding.
Ego: The need for validation and...
CAPA stands for Corrective and Preventive Action. It is a systematic approach to identify, investigate, and resolve issues in production processes.
CAPA is used to address non-conformities, deviations, and other problems in production.
It involves identifying the root cause of the issue, implementing corrective actions, and preventing recurrence.
CAPA helps improve product quality, reduce defects, and enhance overall effi...
Preventive maintenance is a proactive approach to maintenance that involves regularly scheduled inspections, repairs, and replacements to prevent equipment failure.
Preventive maintenance aims to identify and address potential issues before they cause equipment breakdowns or failures.
It involves creating a maintenance schedule and following it consistently.
Regular inspections, lubrication, cleaning, and calibration are ...
posted on 23 Dec 2023
I applied via Approached by Company and was interviewed before May 2021. There were 2 interview rounds.
posted on 15 Jul 2017
I was interviewed before Jul 2016.
Merchandiser
92
salaries
| ₹2.2 L/yr - ₹6 L/yr |
Senior Merchandiser
37
salaries
| ₹3.8 L/yr - ₹9.4 L/yr |
Merchandising Manager
20
salaries
| ₹6.4 L/yr - ₹12 L/yr |
Account Assistant
16
salaries
| ₹1.8 L/yr - ₹3.2 L/yr |
Logistic Assistant
16
salaries
| ₹1.5 L/yr - ₹3.5 L/yr |
Shahi Exports
Gokaldas Exports
Loyal Textile Mills
Arvind Group