Filter interviews by
I applied via Recruitment Consulltant and was interviewed before Nov 2021. There were 2 interview rounds.
Yes, I have extensive automation experience.
I have experience with various automation tools such as Selenium, Appium, and Jenkins.
I have developed and implemented automation frameworks for web and mobile applications.
I have automated regression, smoke, and functional testing.
I have also integrated automation with continuous integration and delivery pipelines.
I have experience with scripting languages such as Python and...
Yes, I am experienced in Scrum methodology.
I have worked as a Scrum Master for multiple teams.
I have facilitated daily stand-up meetings, sprint planning, and retrospectives.
I have experience in backlog grooming and prioritization.
I have coached teams on Agile principles and helped them adopt Scrum practices.
I have used tools like Jira and Trello to manage Scrum projects.
Top trending discussions
It was straightforward
The candidate should discuss their previous experience, how they handle their role and expectations, their work schedule, and provide an explanation about their previous team.
Discuss previous experience in software engineering roles
Explain how you handled your role and met expectations in previous positions
Describe your typical work schedule and any flexibility you have
Provide an overview of your previous team, their s
I appeared for an interview in Oct 2023.
I applied via Job Portal and was interviewed in Sep 2022. There were 4 interview rounds.
To check mechanical seal, perform visual inspection, pressure test, and leakage test.
Perform visual inspection to check for any visible damage or wear on the seal
Conduct a pressure test to ensure the seal can withstand the required pressure
Perform a leakage test to check if the seal is properly sealing the joint
Check the temperature of the seal to ensure it is within the specified range
Check the lubrication of the seal
Runout of a shaft can be calculated by measuring the amount of deviation from a true circular path.
Use a dial indicator to measure the deviation of the shaft from a true circular path
Rotate the shaft and take readings at various points to get an accurate measurement
Calculate the average deviation to determine the runout of the shaft
Runout can be caused by various factors such as misalignment, bent shaft, or worn bearin
Utility load is calculated by determining the total power consumption of all devices connected to the utility grid.
Determine the power consumption of each device connected to the grid
Add up the total power consumption of all devices
Consider the time of day and season to account for varying energy demands
Factor in any renewable energy sources or backup generators
Use software tools to automate the calculation process
posted on 26 Feb 2024
I applied via Campus Placement and was interviewed in Aug 2023. There was 1 interview round.
I applied via Approached by Company and was interviewed before Oct 2021. There were 3 interview rounds.
Contract labor management involves managing the hiring, scheduling, and payment of temporary workers.
Contract labor refers to workers who are hired for a specific project or period of time.
Management of contract labor involves identifying the need for temporary workers, recruiting and hiring them, scheduling their work, and ensuring they are paid appropriately.
Contract labor management also involves ensuring compliance...
Compliance process involves adhering to rules and regulations to ensure legal and ethical practices.
Compliance process refers to the steps taken to ensure adherence to laws, regulations, and industry standards.
It involves identifying applicable laws and regulations that apply to the organization.
Creating policies and procedures to ensure compliance with these laws and regulations.
Training employees on compliance requir...
Prevention of accidents in plant and safety industries starts with proper handling of hazardous substances.
Identify and assess the hazards associated with the substances used
Implement appropriate control measures to minimize the risks
Train employees on safe handling and storage procedures
Regularly inspect and maintain equipment and facilities
Provide personal protective equipment (PPE) to employees
Establish emergency re...
The number of points that need inspection varies depending on the specific context and requirements.
The number of points needing inspection can be determined by the scope of the analysis or evaluation.
Factors such as the size of the dataset, complexity of the data, and specific objectives of the analysis can influence the number of points to inspect.
For example, in a quality control process, a certain percentage of pro...
Yes, Total Maintenance Loss (TML) is important for maintenance as it helps in identifying critical equipment and prioritizing maintenance activities.
TML is a key performance indicator used to measure the overall maintenance effectiveness of a system or equipment.
It helps in identifying equipment that is causing the most downtime or losses in production.
By analyzing TML, maintenance teams can prioritize their efforts on...
based on 1 interview
Interview experience
based on 106 reviews
Rating in categories
Accounts Payable Specialist
42
salaries
| ₹3.2 L/yr - ₹9 L/yr |
Assistant Finance Controller
33
salaries
| ₹6.8 L/yr - ₹12.3 L/yr |
Financial Controller
12
salaries
| ₹9.1 L/yr - ₹17 L/yr |
Operations Specialist
12
salaries
| ₹6 L/yr - ₹12 L/yr |
Assistant Manager
10
salaries
| ₹7.8 L/yr - ₹15.4 L/yr |
Nippon Paint India
BASF
SABIC
Henkel Adhesives Technologies