Upload Button Icon Add office photos

DRN Infrastructure

Compare button icon Compare button icon Compare

Filter interviews by

Clear (1)

DRN Infrastructure Station Manager Interview Questions and Answers

Updated 29 Sep 2023

DRN Infrastructure Station Manager Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
-
Result
No response
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - HR 

(3 Questions)

  • Q1. Document verification
  • Q2. Present location
  • Q3. Renumeration and job title with nature.
Round 3 - One-on-one 

(2 Questions)

  • Q1. About Metro project
  • Q2. What are the various foundations involved.?
  • Ans. 

    Various foundations involved in station management include government funding, private donations, grants, and corporate sponsorships.

    • Government funding: Provides financial support for station operations and infrastructure.

    • Private donations: Contributions from individuals or organizations to support station programming.

    • Grants: Funding awarded by government agencies or private foundations for specific projects or initiat...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Walkin interview, please check eligibility and go with relevant qualifications and experience documents .

Interview questions from similar companies

I applied via Naukri.com and was interviewed before Sep 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Gm 

(3 Questions)

  • Q1. What is your last project and its site design
  • Q2. What is the covered area of project
  • Ans. 

    The covered area of the project is approximately 10,000 square feet.

    • The covered area includes the indoor space of the project.

    • It does not include any outdoor space or open areas.

    • The exact covered area may vary depending on the project.

    • In this particular project, the covered area is approximately 10,000 square feet.

  • Answered by AI
  • Q3. What type of building

Interview Preparation Tips

Interview preparation tips for other job seekers - Believe in yourself and done your all duties responsibilities properly and report your senior.

I applied via Naukri.com and was interviewed before Feb 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - HR 

(4 Questions)

  • Q1. What are your salary expectations?
  • Q2. Share details of your previous job.
  • Q3. Why are you looking for a change?
  • Q4. Tell me about yourself.

Interview Preparation Tips

Interview preparation tips for other job seekers - JUST BE CONFIDENT THEY ARE LOOKING FOR CANDIDATE WHO HAVE GOOD DECISION MAKING POWER.

I applied via Naukri.com and was interviewed before May 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - HR 

(1 Question)

  • Q1. Tell me aboout yourself

Interview Preparation Tips

Interview preparation tips for other job seekers - Try to keep it genuine. Tell what you know and be open about skills you don't know but open to learn during ur job.

I applied via Company Website and was interviewed in Feb 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Power Transmission & distribution

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview for technical purpose.

I applied via Approached by Company and was interviewed before Sep 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(1 Question)

  • Q1. General and deep questions regarding the subject will be asked as per the position applied and past experience.
Round 3 - HR 

(1 Question)

  • Q1. Regarding salary negotiation the discussion was on. TPL always gives a hike from current salary where no other current contractor in the industry can offer the same. Their package is fixed.

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare well according to your past experiences. Don’t have any loose end in what you have worked on. Be vigilant and have patience while replying becoz mostly interview will be took on Skype during 2019 nowadays using Microsoft teams

I applied via Approached by Company and was interviewed before May 2021. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Asked me to brief about me.He will test English speaking ability.
  • Ans. I breifed about my qualification and experience.speak only English.
  • Answered Anonymously
Round 2 - Case Study 

Online meeting conducted with me.About 4 to 5 people along with HR had a discussion with me.Asked questions regarding my work exposure and technical questions.

Interview Preparation Tips

Interview preparation tips for other job seekers - They first look at English speaking ability.Speak confidently with out fear.

I was interviewed before May 2020.

Interview Questionnaire 

1 Question

  • Q1. How to fix rate of 1 cum metre rcc for m10 and m20
  • Ans. 

    To fix the rate of 1 cum metre RCC for M10 and M20, factors like material cost, labor cost, equipment cost, and overheads need to be considered.

    • Determine the cost of materials required for 1 cum metre RCC for M10 and M20

    • Calculate the labor cost involved in the construction process

    • Consider the cost of equipment required for the construction process

    • Include overheads like transportation, insurance, and taxes

    • Compare the ra...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - technicalviru.in

I applied via Naukri.com and was interviewed before Sep 2020. There were 4 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. What we do for shortage of material received?
  • Ans. 

    When faced with a shortage of material received, we take immediate action to address the issue and minimize any negative impact.

    • Contact the supplier to inform them about the shortage and request immediate resolution

    • Check inventory records and cross-verify with the supplier's delivery documentation

    • Investigate the cause of the shortage, such as shipping errors or miscommunication

    • Implement measures to prevent future short...

  • Answered by AI
  • Q2. Can we do correction in invoice? if ans is yes then what are the further steps?
  • Ans. 

    Yes, corrections can be made in an invoice by following certain steps.

    • The correction should be made as soon as possible to avoid any confusion.

    • The original invoice should not be destroyed, but rather marked as 'void' or 'cancelled'.

    • A new invoice should be created with the correct information and a reference to the original invoice.

    • The reason for the correction should be clearly stated on the new invoice.

    • Both the origin...

  • Answered by AI
  • Q3. Various SAP T code for Issues
  • Ans. 

    Various SAP T codes for Issues

    • MB21 - Create Reservation

    • MB1A - Goods Withdrawal

    • MB1B - Transfer Posting

    • MB1C - Other Goods Receipts

    • MB1E - Create Stock Transport Order

    • MB1F - Goods Issue

    • MB1H - Maintain Reservation

    • MB1T - Transfer Posting

    • MB1A - Goods Withdrawal

    • MB1B - Transfer Posting

    • MB1C - Other Goods Receipts

    • MB1E - Create Stock Transport Order

    • MB1F - Goods Issue

    • MB1H - Maintain Reservation

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Always be positive; interviewer may cross checks your confidence through various counter question, but what is right is right it can not be wrong, if interviewer says it wrong then don't go by interviewer words, always stick with your belief and knowledge.

Skills evaluated in this interview

I applied via Recruitment Consultant and was interviewed before Mar 2020. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. General project management questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Be honest
Contribute & help others!
anonymous
You can choose to be anonymous

DRN Infrastructure Interview FAQs

How many rounds are there in DRN Infrastructure Station Manager interview?
DRN Infrastructure interview process usually has 3 rounds. The most common rounds in the DRN Infrastructure interview process are Resume Shortlist, HR and One-on-one Round.
What are the top questions asked in DRN Infrastructure Station Manager interview?

Some of the top questions asked at the DRN Infrastructure Station Manager interview -

  1. What are the various foundations involve...read more
  2. Document verificat...read more
  3. Present locat...read more

Recently Viewed

INTERVIEWS

Blinkit

No Interviews

REVIEWS

Amazon

No Reviews

INTERVIEWS

Merino Laminates

No Interviews

INTERVIEWS

Amazon

No Interviews

INTERVIEWS

Blinkit

No Interviews

DESIGNATION

INTERVIEWS

American Express

No Interviews

JOBS

Cashfree Holiday Planners

No Jobs

INTERVIEWS

Amazon

No Interviews

INTERVIEWS

Amazon

No Interviews

Tell us how to improve this page.

DRN Infrastructure Station Manager Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 425 Interviews
ReNew Interview Questions
4.2
 • 87 Interviews
Vestas Interview Questions
4.3
 • 83 Interviews
GMR Group Interview Questions
4.0
 • 80 Interviews
Jakson Group Interview Questions
4.3
 • 78 Interviews
Siemens Energy Interview Questions
4.1
 • 73 Interviews
Waaree Energies Interview Questions
3.9
 • 57 Interviews
View all
Civil Site Engineer
17 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Highway Engineer
11 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Site Engineer
9 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
7 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Accountant
7 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare DRN Infrastructure with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

GMR Group

4.0
Compare

Reliance Infrastructure

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview
Rate your experience using AmbitionBox
Terrible
Terrible
Poor
Poor
Average
Average
Good
Good
Excellent
Excellent