Filter interviews by
Bbs of shore pile refers to the bar bending schedule of a pile used for shore protection.
Bbs includes details of reinforcement bars like diameter, spacing, length, etc.
It helps in estimating the quantity of steel required for the pile construction.
Example: Bbs for a shore pile may include details of vertical and horizontal reinforcement bars.
It is essential for accurate cost estimation and billing of the project.
Conc quantity in pile refers to the concrete quantity required to fill up a pile foundation.
Conc quantity in pile is calculated based on the dimensions of the pile and the required strength of the concrete.
Factors such as pile diameter, length, and reinforcement details are considered in determining the concrete quantity.
For example, a 1m diameter pile with a length of 10m and requiring a concrete strength of 25MPa wou...
Different types of piles used in construction work include driven piles, bored piles, and screw piles.
Driven piles are installed by driving them into the ground using impact hammers or vibratory hammers.
Bored piles are created by drilling a hole into the ground and then filling it with concrete.
Screw piles are twisted into the ground using machinery, providing a quick and efficient foundation solution.
Other types of pi...
Civil Site Engineer
20
salaries
| ₹2 L/yr - ₹3.4 L/yr |
Accountant
5
salaries
| ₹2.3 L/yr - ₹3.6 L/yr |
Site Engineer
5
salaries
| ₹2.6 L/yr - ₹3.6 L/yr |
Civil Engineer
4
salaries
| ₹3 L/yr - ₹5.1 L/yr |
Purchase Executive
3
salaries
| ₹2.1 L/yr - ₹2.1 L/yr |
Weatherford
Schlumberger
Halliburton
Baker Hughes