Upload Button Icon Add office photos

Filter interviews by

DMIA Land Project Manager Interview Questions, Process, and Tips

Updated 30 Nov 2024

Top DMIA Land Project Manager Interview Questions and Answers

  • Q1. What is the difference between V-connected and Scott connected arrangement for power supply arrangement of 2x25kV?
  • Q2. What is the cement consumption in per TKM of railway project with 32.5ton axle load bridges?
  • Q3. What is the steel consumption in per TKM of 2x25kV AC TRD work of Railway project?

DMIA Land Project Manager Interview Experiences

2 interviews found

Interview experience
5
Excellent
Difficulty level
-
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Nov 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What is the RDSO specification code for 32.5 ton axle load?
  • Ans. 

    The RDSO specification code for 32.5 ton axle load is RDSO/2007/CG-04.

    • RDSO specification code for 32.5 ton axle load is RDSO/2007/CG-04

    • RDSO stands for Research Designs and Standards Organization

    • 32.5 ton axle load is a common standard in railway engineering

  • Answered by AI
  • Q2. What is the difference between V-connected and Scott connected arrangement for power supply arrangement of 2x25kV?
  • Ans. 

    V-connected arrangement has two transformers connected in series while Scott connected arrangement has two transformers connected in parallel.

    • V-connected arrangement has two transformers connected in series.

    • Scott connected arrangement has two transformers connected in parallel.

    • V-connected arrangement is used when the neutral point of the system is not available.

    • Scott connected arrangement is used when the neutral point

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Oct 2023. There were 2 interview rounds.

Round 1 - Case Study 

Risk factors of previous project

Round 2 - Technical 

(2 Questions)

  • Q1. What is the cement consumption in per TKM of railway project with 32.5ton axle load bridges?
  • Ans. 

    The cement consumption in per TKM of railway project with 32.5ton axle load bridges depends on various factors such as the type of construction, design specifications, and project requirements.

    • Cement consumption for railway projects can vary based on the type of track (e.g. ballasted or non-ballasted), the type of bridges (e.g. steel or concrete), and the design standards followed.

    • Factors such as the length of the trac...

  • Answered by AI
  • Q2. What is the steel consumption in per TKM of 2x25kV AC TRD work of Railway project?
  • Ans. 

    The steel consumption in per TKM of 2x25kV AC TRD work of Railway project depends on various factors such as the design, specifications, and construction methods.

    • Steel consumption can vary based on the design of the railway project.

    • Specifications for the steel used in the project will also impact consumption.

    • Construction methods, such as welding techniques, can affect the amount of steel needed.

    • Calculations for steel c...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't give fake replies.

Project Manager Interview Questions Asked at Other Companies

Q1. What is success & what is failure to you? How do you handle f ... read more
asked in HCLTech
Q2. How did you manage the software release and deployment
Q3. If you have 1 kg of cotton and 1 kg of iron which is heavier?
asked in Infosys
Q4. What is the difference between scrum master and product manager
Q5. 1. Fundamentals of estimation techniques. 2. Which all pm tools h ... read more

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I was interviewed in Dec 2024.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Over all experience and details on Implementation project
  • Q2. Scenario based questions?
Round 2 - HR 

(1 Question)

  • Q1. What is your current salary and what is expected
  • Ans. 

    I am currently earning $80,000 annually and I am looking for a salary in the range of $90,000 to $100,000.

    • Current salary: $80,000 annually

    • Expected salary range: $90,000 - $100,000

    • Open to negotiation based on benefits and responsibilities

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Nov 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. About project management
  • Q2. About Network Infrastructure
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via Naukri.com and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - One-on-one 

(6 Questions)

  • Q1. What is your day to day activities?
  • Ans. 

    As a Project Manager, my day to day activities include overseeing project timelines, communicating with team members and stakeholders, tracking progress, resolving issues, and ensuring project goals are met.

    • Overseeing project timelines and milestones

    • Communicating with team members and stakeholders

    • Tracking project progress and updating project documentation

    • Resolving issues and conflicts that arise during the project

    • Ensu...

  • Answered by AI
  • Q2. How do you manage sharing resources?
  • Ans. 

    I manage sharing resources by prioritizing tasks, communicating effectively, and utilizing resource management tools.

    • Prioritize tasks based on importance and urgency

    • Communicate with team members to ensure everyone is aware of resource allocation

    • Utilize resource management tools to track and allocate resources efficiently

  • Answered by AI
  • Q3. How do manage change requests?
  • Ans. 

    I manage change requests by evaluating impact, prioritizing based on project goals, obtaining approval, and implementing changes.

    • Evaluate the impact of the change request on project scope, schedule, and budget.

    • Prioritize change requests based on project goals and objectives.

    • Obtain approval from stakeholders before implementing any changes.

    • Implement approved changes while ensuring minimal disruption to project progress.

    • ...

  • Answered by AI
  • Q4. How do you accept changes, what are the steps you follow?
  • Ans. 

    I accept changes by first understanding the reasons behind them, communicating with stakeholders, creating a plan, and implementing the changes effectively.

    • Understand the reasons behind the changes

    • Communicate with stakeholders to gather feedback and address concerns

    • Create a detailed plan outlining the steps needed to implement the changes

    • Implement the changes effectively while monitoring progress and making adjustments

  • Answered by AI
  • Q5. How do you do risk management? Steps
  • Ans. 

    Risk management involves identifying, assessing, and mitigating potential risks to a project.

    • Identify potential risks by brainstorming with team members and stakeholders

    • Assess the likelihood and impact of each risk using a risk matrix

    • Develop a risk response plan for high-priority risks

    • Monitor and review risks throughout the project lifecycle

    • Communicate risks and mitigation strategies to stakeholders regularly

  • Answered by AI
  • Q6. Do you know Project Goverance?
  • Ans. 

    Project Governance refers to the framework, policies, procedures, and decision-making processes that guide project management.

    • Project Governance ensures that projects are aligned with organizational goals and objectives.

    • It involves defining roles and responsibilities, establishing communication channels, and setting up project controls.

    • Examples of Project Governance mechanisms include steering committees, project chart

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - After 1st round, I never heard back from HR, neither selected nor not-selected feedback. HR did not respond to emails or calls either.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. Project related questions what was your role how did you manage resources how many resources you are handling. How did you manage team and what was your roll.

Interview Preparation Tips

Interview preparation tips for other job seekers - Questions they are asking based on your experience how many projects you have handled and which all technology you have worked.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via Naukri.com and was interviewed in Oct 2024. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Tell me about project charter
  • Ans. 

    Project charter is a document that formally authorizes a project and provides the project manager with the authority to apply organizational resources to project activities.

    • Defines the project scope, objectives, deliverables, and stakeholders

    • Outlines the project timeline, budget, and resources

    • Establishes the project manager's authority and responsibilities

    • Serves as a reference point for decision-making and conflict res...

  • Answered by AI
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. What is salary and why do you want to have it
  • Ans. 

    Salary is a fixed regular payment made by an employer to an employee for work done.

    • Salary is a form of compensation for the work and services provided by an individual.

    • It provides financial stability and security for individuals and their families.

    • Salary is often used as a measure of one's value and contribution in the workplace.

    • It can also serve as a motivation for employees to perform well and achieve goals.

    • Examples:...

  • Answered by AI
  • Q2. Why you want to earn, you should work without salary
  • Ans. 

    I believe in fair compensation for the value I bring to a project, as it motivates me to perform at my best.

    • Fair compensation is a recognition of the value and effort I contribute to a project

    • Salary is a form of appreciation and motivation for employees

    • Financial stability is important for personal and professional growth

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. How to mange agile project
  • Ans. 

    Agile project management involves iterative planning, execution, and review to adapt to changing requirements.

    • Break the project into smaller tasks called user stories

    • Prioritize user stories based on business value

    • Work in short iterations called sprints, typically 2-4 weeks

    • Hold daily stand-up meetings to track progress and address any issues

    • Regularly review and adapt the project plan based on feedback

  • Answered by AI

Skills evaluated in this interview

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Domain Knowledge 

(2 Questions)

  • Q1. What is your previous roles and responsibilities
  • Q2. What you bring to the table
Round 2 - Assignment 

Real time case study

Round 3 - Technical 

(2 Questions)

  • Q1. Related to technology you are expert
  • Q2. Related to technology you work with development team
Round 4 - HR 

(2 Questions)

  • Q1. Behavioral Questions
  • Q2. Job specific questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Get well worse with the role and responsibilities you mentioned in your resume

DMIA Land Interview FAQs

How many rounds are there in DMIA Land Project Manager interview?
DMIA Land interview process usually has 1-2 rounds. The most common rounds in the DMIA Land interview process are Technical and Case Study.
What are the top questions asked in DMIA Land Project Manager interview?

Some of the top questions asked at the DMIA Land Project Manager interview -

  1. What is the difference between V-connected and Scott connected arrangement for ...read more
  2. What is the cement consumption in per TKM of railway project with 32.5ton axle ...read more
  3. What is the steel consumption in per TKM of 2x25kV AC TRD work of Railway proje...read more

Tell us how to improve this page.

DMIA Land Project Manager Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

5.0

Skill development

4.0

Work-Life balance

4.0

Salary & Benefits

4.0

Job Security

5.0

Company culture

4.0

Promotions/Appraisal

5.0

Work Satisfaction

Explore 1 Review and Rating
Assistant Manager
4 salaries
unlock blur

₹6.5 L/yr - ₹10.2 L/yr

EHS Manager
4 salaries
unlock blur

₹10 L/yr - ₹13.2 L/yr

Explore more salaries
Compare DMIA Land with

DLF

4.0
Compare

Godrej Properties

3.7
Compare

Sobha

3.9
Compare

Prestige Group

4.3
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview