Upload Button Icon Add office photos

Dilip Buildcon

Compare button icon Compare button icon Compare

Filter interviews by

Clear (1)

Dilip Buildcon Work in Production Quality Assembly in Eicher Tractor Mandideep Bhopal M.P Interview Questions, Process, and Tips

Updated 15 Nov 2021

Dilip Buildcon Work in Production Quality Assembly in Eicher Tractor Mandideep Bhopal M.P Interview Experiences

1 interview found

Interview Questionnaire 

6 Questions

  • Q1. What is a transformer
  • Ans. 

    A transformer is an electrical device that transfers electrical energy from one circuit to another through electromagnetic induction.

    • Transformers are used to increase or decrease the voltage of an alternating current (AC) power supply.

    • They consist of two coils of wire, called the primary and secondary coils, wrapped around a magnetic core.

    • When an AC current flows through the primary coil, it creates a magnetic field th...

  • Answered by AI
  • Q2. What is machine up
  • Ans. 

    Machine up refers to the process of preparing a machine for operation.

    • It involves checking and ensuring that all components of the machine are in working order.

    • This includes inspecting for any damage or wear and tear.

    • Machine up also involves lubricating the machine and filling it with the necessary fluids.

    • It is important to follow the manufacturer's instructions for machine up to ensure safe and efficient operation.

    • Exa...

  • Answered by AI
  • Q3. What is ohm's low
  • Ans. 

    Ohm's law states that the current through a conductor between two points is directly proportional to the voltage across the two points.

    • Ohm's law is a fundamental law of electrical engineering.

    • It states that the current flowing through a conductor is directly proportional to the voltage applied across it.

    • The proportionality constant is known as resistance and is measured in ohms.

    • The formula for Ohm's law is I = V/R, whe...

  • Answered by AI
  • Q4. What is voltage current
  • Ans. 

    Voltage is the measure of electrical potential difference between two points, while current is the flow of electric charge.

    • Voltage is measured in volts (V) and current is measured in amperes (A)

    • Voltage is necessary to create a current flow

    • Ohm's law relates voltage, current, and resistance: V = IR

    • Examples of voltage sources include batteries and power outlets

    • Examples of current include the flow of electrons in a circuit

  • Answered by AI
  • Q5. What is transformer typs
  • Ans. 

    Transformers are devices that transfer electrical energy from one circuit to another through electromagnetic induction.

    • Transformers are of two types: step-up transformers and step-down transformers.

    • Step-up transformers increase the voltage while decreasing the current, while step-down transformers decrease the voltage while increasing the current.

    • Other types of transformers include isolation transformers, autotransform...

  • Answered by AI
  • Q6. What is machine
  • Ans. 

    A machine is a device that uses energy to perform a specific task or function.

    • Machines can be powered by electricity, fuel, or human effort.

    • Examples of machines include cars, computers, and manufacturing equipment.

    • Machines can be simple or complex, depending on their intended use and function.

    • They are designed to make tasks easier, faster, or more efficient.

    • Machines can be found in almost every industry, from agricultu

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - My name ankit kumar gautam
I am diploma electrical engineering

Skills evaluated in this interview

Interview questions from similar companies

I was interviewed before Jul 2016.

Interview Preparation Tips

Round: Group Discussion
Duration: 4 hours 5 minutes

Round: Test
Duration: 2 hours 5 minutes

I applied via Recruitment Consultant and was interviewed in Apr 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. About HT/LT,Motor/Feeder & Substation Errection & Commission.

Interview Preparation Tips

Interview preparation tips for other job seekers - Good Questions Are Asked.

I applied via Recruitment Consultant and was interviewed before Aug 2020. There were 5 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Machinery maintenance Dpr maintenance,local purchasing,

Interview Preparation Tips

Interview preparation tips for other job seekers - Nice,good and teritical intrew done and completed

Interview Questionnaire 

3 Questions

  • Q1. Basically questions related to power distribution field & some of college courses.
  • Q2. In this round questions basically related to management & technical composition.
  • Q3. He only asked your previous n current financial requirements as per your interview.

I applied via Walk-in and was interviewed in Aug 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. ELSR MEANS

Interview Preparation Tips

Interview preparation tips for other job seekers - Elevated service level Reservoir
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
-
Result
Selected Selected
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all Resume tips
Round 2 - Technical 

(2 Questions)

  • Q1. Civil engineering
  • Q2. Civil engineering responsibility timely site work .
Round 3 - Technical 

(2 Questions)

  • Q1. Civil engineering
  • Q2. Site relative question
Round 4 - Technical 

(2 Questions)

  • Q1. Site Execution qution
  • Q2. Highway Road Project qution

Interview Preparation Tips

Interview preparation tips for other job seekers - Bridges ,Highway Road Project and Railway Project flyovers
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-

I was interviewed in Mar 2023.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - HR 

(2 Questions)

  • Q1. Sir, Can I got Company Details ?
  • Q2. Sir, Can I know Interview process?

Interview Preparation Tips

Interview preparation tips for other job seekers - Dear sir,
This is with reference to your job requirement the position of SME I am interested in this position and would appreciate your consideration as a candidate for this role. I believe that my skills. qualifications make me a suitable candidate for the job. I'm working @ SAKTHI ASSOCIATES from 2018 June till Know. Currently my project work @EPIL (Engineering Project India Limited) I have completed B.Tech in Civil from Bharath university. I have Experience in Site Engineering 4+ Years . I have Completed project
1.ETP (Effluent Treatment plant )
2.RO ( Reverse Osmosis)
3.Weaving Shead Textile Industry
4.TCL Chinese pvt Ltd
5. Residential building G+ 4
I am confident that my skills will be the right fit for the job Please find the attached CV in the email for further reference.

Thank you for your time and consideration
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Nov 2022.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(2 Questions)

  • Q1. Earth moving Equipment, crusher plant,hotmix plant concrete plant, operation and maintenance
  • Q2. Plant and equipment related
Interview experience
3
Average
Difficulty level
Easy
Process Duration
-
Result
Selected Selected

I applied via Job Portal

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(3 Questions)

  • Q1. How many year experience ?
  • Q2. How to use bentonite use before pulsing
  • Ans. 

    Bentonite is used as a drilling fluid to stabilize boreholes before pulsing.

    • Bentonite is mixed with water to form a slurry and pumped into the borehole.

    • The slurry fills the borehole and stabilizes the walls, preventing collapse.

    • After the bentonite has set, pulsing can be done without the risk of borehole collapse.

    • Pulsing is a technique used in geophysical exploration to measure the properties of the subsurface.

  • Answered by AI
  • Q3. 1.03 mgl to 1.10 mgl

Interview Preparation Tips

Interview preparation tips for other job seekers - Piling work(550mm,600mm,750mm and 1000mm dia pile),survey,Client bills
Contribute & help others!
anonymous
You can choose to be anonymous

Dilip Buildcon Interview FAQs

What are the top questions asked in Dilip Buildcon Work in Production Quality Assembly in Eicher Tractor Mandideep Bhopal M.P interview?

Some of the top questions asked at the Dilip Buildcon Work in Production Quality Assembly in Eicher Tractor Mandideep Bhopal M.P interview -

  1. What is voltage curr...read more
  2. What is a transfor...read more
  3. What is transformer t...read more

Recently Viewed

PHOTOS

InsuranceDekho

3 office photos

LIST OF COMPANIES

Credit Bajaar

Overview

INTERVIEWS

ICA Edu Skills

No Interviews

SALARIES

Bharti Airtel

SALARIES

Bharti Airtel

SALARIES

Bharti Airtel

SALARIES

Bharti Airtel

SALARIES

Bharti Airtel

SALARIES

Bharti Airtel

INTERVIEWS

Dilip Buildcon

No Interviews

Tell us how to improve this page.

Fast track your campus placements

View all
Senior Engineer
212 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Manager
207 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Asst Store
201 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Store Executive
193 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Structural Engineer
178 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Dilip Buildcon with

Ashoka Buildcon

4.1
Compare

IRB Infrastructure

4.0
Compare

Nagarjuna Construction Company

4.1
Compare

PNC Infratech

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview