Filter interviews by
I applied via Recruitment Consulltant and was interviewed in Nov 2021. There were 6 interview rounds.
Sageer ahmed
posted on 12 Jan 2023
Boom operations may be slow due to various reasons such as mechanical issues, operator error, or lack of maintenance.
Check for any mechanical issues with the boom equipment
Ensure the operator is properly trained and following correct procedures
Regularly maintain and service the boom equipment to prevent slowdowns
posted on 27 Dec 2021
I applied via Walk-in and was interviewed in Jan 2021. There was 1 interview round.
Pressure unit is a measurement of force per unit area exerted on a surface.
Pressure unit measures the amount of force applied to a given area.
It is commonly used in various fields such as physics, engineering, and meteorology.
The SI unit for pressure is Pascal (Pa), which is equal to one Newton per square meter (N/m²).
Other commonly used pressure units include pounds per square inch (psi), atmospheres (atm), and bar.
Fo...
based on 8 reviews
Rating in categories
Design Engineer
34
salaries
| ₹1.5 L/yr - ₹5 L/yr |
Applications Engineer
34
salaries
| ₹1.5 L/yr - ₹6 L/yr |
Valve Technician
16
salaries
| ₹2.2 L/yr - ₹3.5 L/yr |
Planning Engineer
14
salaries
| ₹1.8 L/yr - ₹4 L/yr |
Site Engineer
13
salaries
| ₹2.4 L/yr - ₹6 L/yr |
L&T Valves
Forbes Marshall
Kirloskar Brothers
Audco India