I applied via Recruitment Consultant and was interviewed in Nov 2021. There were 5 interview rounds.

Interview Questionnaire 

10 Questions

  • Q1. 1. Difference between cp, cpk and pp, Ppk ?
  • Ans. 

    Cp, Cpk, Pp, and Ppk are statistical process capability indices used to measure the ability of a process to produce products within specification limits.

    • Cp and Cpk are used for short-term process capability analysis, while Pp and Ppk are used for long-term process capability analysis.

    • Cp measures the potential capability of a process to meet specifications, while Cpk measures the actual capability of a process to meet s...

  • Answered by AI
  • Q2. 2. What is Hypothesis testing and its types ?
  • Ans. 

    Hypothesis testing is a statistical method to test a hypothesis about a population parameter.

    • It involves formulating a null hypothesis and an alternative hypothesis.

    • The null hypothesis assumes that there is no significant difference between the sample and population.

    • The alternative hypothesis assumes that there is a significant difference between the sample and population.

    • Types of hypothesis testing include one-tailed ...

  • Answered by AI
  • Q3. 3. Types of DOE and sample size calculation ?
  • Ans. 

    DOE types include screening, factorial, response surface, and mixture designs. Sample size calculation depends on the type of DOE.

    • Screening designs are used to identify the most important factors affecting a response.

    • Factorial designs are used to study the effects of multiple factors and their interactions.

    • Response surface designs are used to optimize a response by finding the best combination of factors.

    • Mixture design...

  • Answered by AI
  • Q4. 4. What is MSA and types and their application ?
  • Ans. 

    MSA stands for Measurement System Analysis. It is used to evaluate the measurement system's ability to provide accurate and reliable data.

    • MSA is used to identify and quantify the sources of variation in a measurement system.

    • It helps in determining the accuracy, precision, and stability of the measurement system.

    • There are two types of MSA: Attribute Agreement Analysis and Variable Gauge R&R Analysis.

    • Attribute Agreement ...

  • Answered by AI
  • Q5. 5. What are the control charts and their application ?
  • Ans. 

    Control charts are statistical tools used to monitor and control a process over time.

    • They help identify if a process is stable or unstable.

    • They can be used to detect and correct problems in a process.

    • Common types include X-bar and R charts, p charts, and c charts.

    • They are widely used in manufacturing, healthcare, and other industries.

    • Example: A hospital might use a control chart to monitor the number of patient falls p...

  • Answered by AI
  • Q6. 6. What is regression and correlation ?
  • Ans. 

    Regression and correlation are statistical methods used to analyze the relationship between two variables.

    • Regression is used to predict the value of one variable based on the value of another variable.

    • Correlation measures the strength and direction of the relationship between two variables.

    • Regression and correlation are often used in industrial engineering to analyze data and make predictions.

    • Examples of regression and...

  • Answered by AI
  • Q7. 7. What is Line Balancing, it's steps and methods ?
  • Ans. 

    Line balancing is the process of evenly distributing work among production lines to optimize efficiency.

    • Identify tasks and their sequence

    • Determine cycle time for each task

    • Calculate the minimum number of workstations needed

    • Assign tasks to workstations

    • Evaluate and adjust as necessary

    • Methods include longest task time, shortest task time, and ranked positional weight

    • Example: A car assembly line where each workstation has a...

  • Answered by AI
  • Q8. 8. What is PFD and their symbols ?
  • Ans. 

    PFD stands for Process Flow Diagram, which is a graphical representation of a process.

    • PFDs are used to show the flow of materials, energy, and information through a process.

    • They use symbols to represent equipment, valves, instruments, and other components.

    • PFDs are often used in chemical and process engineering to design and optimize processes.

    • Some common symbols used in PFDs include pumps, tanks, heat exchangers, and c

  • Answered by AI
  • Q9. 9. What is PFMEA, it's types, and priority for taking action on RPN ?
  • Ans. 

    PFMEA is a risk assessment tool used in industrial engineering to identify and prioritize potential failures.

    • PFMEA stands for Process Failure Mode and Effects Analysis

    • It is used to identify potential failures in a process and prioritize them based on their severity, occurrence, and detectability

    • There are three types of PFMEA: Design FMEA, Process FMEA, and System FMEA

    • RPN (Risk Priority Number) is calculated by multiply...

  • Answered by AI
  • Q10. 10. What is Lean, 8 wastes, DMAIC tools and difference ?
  • Ans. 

    Lean is a methodology to eliminate waste and improve efficiency. 8 wastes are non-value adding activities. DMAIC is a problem-solving tool.

    • Lean is a systematic approach to identify and eliminate waste in processes

    • 8 wastes are defects, overproduction, waiting, non-utilized talent, transportation, inventory, motion, and extra processing

    • DMAIC is a problem-solving tool used in Six Sigma methodology

    • DMAIC stands for Define, ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Most questions will be from Lean, Six Sigma and Industrial Engineering. Give your best with well preparation.

Skills evaluated in this interview

Degania Medical Devices Interview FAQs

What are the top questions asked in Degania Medical Devices Assistant Manager Industrial Engineering interview?

Some of the top questions asked at the Degania Medical Devices Assistant Manager Industrial Engineering interview -

  1. 1. Difference between cp, cpk and pp, Pp...read more
  2. 9. What is PFMEA, it's types, and priority for taking action on RP...read more
  3. 10. What is Lean, 8 wastes, DMAIC tools and differenc...read more

Tell us how to improve this page.

People are getting interviews through

based on 1 Degania Medical Devices interview
Recruitment Consultant
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.

Degania Medical Devices Assistant Manager Industrial Engineering Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

5.0

Skill development

5.0

Work-Life balance

5.0

Salary & Benefits

5.0

Job Security

5.0

Company culture

5.0

Promotions/Appraisal

5.0

Work Satisfaction

Explore 1 Review and Rating
Production Supervisor
16 salaries
unlock blur

₹2 L/yr - ₹3.2 L/yr

Senior Engineer
12 salaries
unlock blur

₹4 L/yr - ₹8.5 L/yr

Production Engineer
10 salaries
unlock blur

₹3 L/yr - ₹5.5 L/yr

Supervisor
9 salaries
unlock blur

₹2.2 L/yr - ₹3.9 L/yr

Engineer
8 salaries
unlock blur

₹2.2 L/yr - ₹5.8 L/yr

Explore more salaries
Compare Degania Medical Devices with

Opto Circuits

4.5
Compare

Trivitron Healthcare

3.4
Compare

Poly Medicure

3.7
Compare

Hindustan Syringes & Medical Devices

4.0
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview