I applied via Apna Jobs and was interviewed before Sep 2023. There was 1 interview round.
There are typically three types of checks in a DG set: visual check, electrical check, and mechanical check.
Visual check involves inspecting the overall condition of the DG set, including checking for leaks, loose connections, and signs of damage.
Electrical check involves testing the electrical components of the DG set, such as the battery, alternator, and wiring, to ensure they are functioning properly.
Mechanical chec...
SLD stands for Single Line Diagram, which is a schematic representation of the electrical system of a commercial building.
SLD shows the electrical distribution system in a simplified manner, including main components like transformers, switchgear, and distribution panels.
It helps in understanding the flow of electricity and the interconnection of various electrical components in the building.
SLD is essential for design...
The crank battery voltage of a DG battery is typically around 12 volts.
Crank battery voltage is the voltage required to start the engine of a diesel generator.
It is usually around 12 volts for most DG batteries.
The voltage may vary slightly depending on the specific battery model and manufacturer.
Top trending discussions
Technical Supervisor
20
salaries
| ₹2.4 L/yr - ₹3.4 L/yr |
Shift Engineer
17
salaries
| ₹2 L/yr - ₹6 L/yr |
Electrician
14
salaries
| ₹1.5 L/yr - ₹4 L/yr |
Mst Electrician
8
salaries
| ₹1.9 L/yr - ₹2.8 L/yr |
Electrical Engineer
8
salaries
| ₹1.2 L/yr - ₹3.6 L/yr |
JLL
CBRE
Knight Frank
Colliers India