Filter interviews by
I was responsible for conducting quality inspections, analyzing data, and implementing process improvements in my previous company.
Conducted quality inspections on products to ensure they met company standards
Analyzed data to identify trends and areas for improvement
Implemented process improvements to increase efficiency and reduce defects
Collaborated with cross-functional teams to address quality issues and drive cont...
The least count of a vernier caliper is the smallest measurement that can be read on the scale.
The least count is calculated by dividing the smallest division on the main scale by the total number of divisions on the vernier scale.
For example, if the smallest division on the main scale is 1 mm and there are 10 divisions on the vernier scale, the least count would be 0.1 mm.
The least count determines the precision of me...
Top trending discussions
I applied via Naukri.com and was interviewed before Jul 2021. There were 2 interview rounds.
I applied via Walk-in and was interviewed before Apr 2020. There were 5 interview rounds.
I applied via Approached by Company and was interviewed before Aug 2021. There were 2 interview rounds.
QA is Quality Assurance and QC is Quality Control. There are three types of QA and two types of QC.
QA is the process of ensuring that the product meets the specified requirements and standards.
QC is the process of ensuring that the product meets the desired quality level.
Types of QA: Unit testing, Integration testing, System testing.
Types of QC: Inspection, Testing.
QA is proactive while QC is reactive.
I applied via Referral and was interviewed in May 2020. There were 4 interview rounds.
The 7 QC tools are a set of problem-solving techniques used in quality management.
Check sheet: Used to collect and analyze data.
Control chart: Monitors process variation over time.
Histogram: Displays data distribution.
Pareto chart: Identifies and prioritizes problems.
Cause-and-effect diagram: Visualizes potential causes of a problem.
Scatter diagram: Shows the relationship between two variables.
Flowchart: Illustrates th
I applied via Walk-in and was interviewed in Sep 2021. There was 1 interview round.
I applied via Walk-in and was interviewed before Dec 2020. There were 3 interview rounds.
L4 level rework is a term used in engineering to describe a specific type of rework process.
L4 level rework refers to the highest level of rework in a hierarchical system.
It involves complex and advanced modifications or repairs to a product or system.
L4 level rework requires a deep understanding of the engineering principles and expertise in the specific domain.
Examples of L4 level rework can include redesigning a cir...
Yes, failure analysis is the process of identifying and analyzing the root cause of a failure in a system or product.
It involves examining the failed component or system to determine the cause of the failure.
It can be used to improve the design and reliability of products.
Examples include analyzing a failed engine part to determine why it broke, or investigating a software bug to determine the cause of a system crash.
My KPI is to ensure timely completion of assigned tasks with high quality output.
Meeting project deadlines
Delivering high-quality work
Maintaining good communication with team members
Continuously improving skills and knowledge
Achieving set targets and goals
I applied via Company Website and was interviewed in Jul 2021. There was 1 interview round.
posted on 22 Oct 2022
based on 1 interview
Interview experience
Junior Engineer
255
salaries
| ₹1.6 L/yr - ₹3.6 L/yr |
Engineer
177
salaries
| ₹2 L/yr - ₹5 L/yr |
Quality Engineer
144
salaries
| ₹1.8 L/yr - ₹4.2 L/yr |
Process Engineer
77
salaries
| ₹2.1 L/yr - ₹4.8 L/yr |
Line Leader
50
salaries
| ₹2.1 L/yr - ₹4.5 L/yr |
Flex
Foxconn
Dixon Technologies
ECIL