I applied via Recruitment Consultant and was interviewed before Nov 2020. There was 1 interview round.
Top trending discussions
I applied via Recruitment Consultant and was interviewed in Nov 2017. There were 8 interview rounds.
I applied via Walk-in and was interviewed before Sep 2021. There were 2 interview rounds.
DCS system architecture refers to the design and layout of a distributed control system.
DCS system architecture involves a network of controllers, sensors, and actuators.
The system is designed to control and monitor various processes in an industrial setting.
The architecture typically includes a central control room, field devices, and communication networks.
DCS systems can be customized to meet the specific needs of a...
Electrical earth is used for safety of electrical equipment while instrument earth is used for safety of instruments.
Electrical earth is used to protect electrical equipment from electrical faults and surges.
Instrument earth is used to protect sensitive instruments from electrical noise and interference.
Electrical earth is connected to the earth electrode while instrument earth is connected to the instrument chassis.
El...
I applied via Recruitment Consulltant and was interviewed in Dec 2023. There was 1 interview round.
I applied via Company Website and was interviewed in Oct 2021. There was 1 interview round.
Motor and panel switchgear erection in oil and gas field
Experience in installation and maintenance of motor and panel switchgear in oil and gas field
Knowledge of safety regulations and procedures in hazardous environments
Ability to read and interpret technical drawings and schematics
Familiarity with testing and commissioning procedures
Experience in troubleshooting and resolving electrical issues
Examples: installation o...
Date of completion refers to the deadline or expected date of finishing a project or task.
It is important to set a realistic date of completion to ensure timely delivery of projects.
Factors such as available resources, team capacity, and project complexity should be considered when setting the date of completion.
Regular monitoring and tracking of progress can help ensure that the project is on track to meet the date of...
posted on 24 Mar 2024
I applied via Naukri.com and was interviewed before Mar 2023. There were 3 interview rounds.
The key role in supplier quality is to ensure that suppliers meet the required standards and specifications to deliver high-quality products or services.
Establishing and maintaining supplier quality standards
Conducting supplier audits and assessments
Implementing corrective actions for non-conforming products or services
Collaborating with suppliers to improve quality processes
Monitoring supplier performance and providin
The process flow in plating process involves cleaning, rinsing, activating, plating, rinsing, and drying.
Cleaning: Parts are cleaned to remove any dirt, oil, or contaminants.
Rinsing: Parts are rinsed to remove any cleaning agents or residues.
Activating: Parts are activated to prepare the surface for plating.
Plating: Parts are plated with the desired metal.
Rinsing: Parts are rinsed again to remove any plating chemicals.
...
I handle supplier quality issues by identifying root causes, implementing corrective actions, and monitoring performance.
Identify the root cause of the quality issue
Implement corrective actions with the supplier
Monitor supplier performance to ensure issue resolution
Establish clear communication channels with suppliers
Regularly audit supplier quality processes
Issue resolution steps involve identifying the problem, analyzing root cause, developing solutions, implementing corrective actions, and monitoring effectiveness.
Identify the problem by gathering information and data
Analyze the root cause of the issue to understand why it occurred
Develop solutions or corrective actions to address the problem
Implement the chosen solution and monitor its effectiveness
Document the entire
Steps of analysis in DMAIC include Define, Measure, Analyze, Improve, and Control.
Define the problem or opportunity for improvement
Measure current processes and collect data
Analyze the data to identify root causes of issues
Improve processes based on analysis findings
Control and sustain improvements over time
FMEA stands for Failure Mode and Effects Analysis, a systematic method for identifying and preventing potential failures in a process or product.
FMEA is a proactive risk assessment tool used to identify and prioritize potential failure modes in a process or product.
It involves analyzing the potential effects of each failure mode, the likelihood of their occurrence, and the ability to detect and prevent them.
FMEA helps ...
RPN stands for Risk Priority Number in FMEA, used to prioritize potential failure modes based on severity, occurrence, and detection.
RPN is calculated by multiplying severity, occurrence, and detection ratings for each potential failure mode.
It helps prioritize which failure modes to address first based on their potential impact.
For example, a failure mode with a high severity, high occurrence, and low detection rating...
To improve severity in FMEA, focus on identifying and addressing high-risk failure modes.
Conduct a thorough risk assessment to prioritize high-severity failure modes
Implement controls to reduce the severity of high-risk failure modes
Ensure that corrective actions are effective in reducing severity
Regularly review and update the FMEA to capture new risks and improvements
Involve cross-functional teams in the FMEA process
To improve occurrence, focus on root cause analysis, implementing corrective actions, and continuous monitoring.
Conduct thorough root cause analysis to identify the underlying issues leading to occurrences.
Implement corrective actions based on the findings of the root cause analysis to prevent reoccurrence.
Establish a robust monitoring system to track the effectiveness of the corrective actions and identify any new occ...
The key steps of PPAP include submission of documents, review by customer, and approval for production.
Submission of documents such as control plans, FMEAs, and measurement system analysis
Review of documents by customer to ensure all requirements are met
Approval for production once all documents are accepted
posted on 22 May 2024
I was interviewed in Apr 2024.
IATF focuses on automotive industry requirements while ISO 9001 is a generic quality management standard.
IATF 16949 is specifically designed for automotive industry suppliers
ISO 9001 is a generic quality management standard applicable to any industry
IATF 16949 includes additional automotive-specific requirements such as production part approval process (PPAP)
Both standards emphasize continual improvement and customer s
I applied via Recruitment Consulltant and was interviewed in Feb 2022. There were 2 interview rounds.
The steps of contract creation involve offer, acceptance, consideration, and mutual agreement.
Offer: One party proposes terms to another party.
Acceptance: The other party agrees to the terms proposed.
Consideration: Both parties exchange something of value.
Mutual agreement: Both parties come to a meeting of the minds.
Drafting: The contract is written and reviewed by both parties.
Execution: Both parties sign the contract...
Engineer
39
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
39
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
34
salaries
| ₹0 L/yr - ₹0 L/yr |
Trainee
30
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
28
salaries
| ₹0 L/yr - ₹0 L/yr |
Siemens
ABB
Schneider Electric
Emerson Electric Co.