Dalmia Bharat Cement Production Engineer Interview Questions and Answers for Experienced

Updated 22 Dec 2024

Dalmia Bharat Cement Production Engineer Interview Experiences for Experienced

1 interview found

Interview experience
1
Bad
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Jul 2022. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. About Kiln Operations
  • Q2. About VRM Operations
Round 2 - HR 

(2 Questions)

  • Q1. What's ur Expectations
  • Q2. When u will Join

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't Come to Dalmia,Ariyalur..When u Come u Will Feel Hard....Worst Management,Worst Work Culture

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. How you beneficial to our organisation ?
  • Q2. What is your previous company achievement?
Round 3 - HR 

(2 Questions)

  • Q1. Why you switch your current organisation?
  • Q2. What is your acceptance salary
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Nov 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Basics about cement industry
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Technical manufacturing process

I applied via Company Website and was interviewed in Aug 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Group Discussion 

Diplom cement technology, cement is a most useful resource.

Round 3 - Technical 

(3 Questions)

  • Q1. 1. Cement manufacturing process .
  • Ans. Crossing, screening, stacking,reclaiming,grounding,free heating,burning,cooling,grainding,add materials prosentes.
  • Answered Anonymously
  • Q2. 2. Cement Row materials
  • Q3. Raw mill vrm boll mill
  • Ans. Grinding unit vrm speed and rpm , boll mill speed
  • Answered Anonymously
Round 4 - Group Discussion 

Vrm rpm speed 20-25 and boll mill rpm speed 25-27

Interview Preparation Tips

Topics to prepare for JK Cement Production Engineer interview:
  • Diploma in Cement technology
Interview preparation tips for other job seekers - Please find the attechment of resume of diploma in cement technology.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Mar 2024, where I was asked the following questions.

  • Q1. About job profile
  • Q2. About work life Balance

Interview Preparation Tips

Interview preparation tips for other job seekers - All the best
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

General methametics and basics of chemical engineering

Round 2 - Technical 

(2 Questions)

  • Q1. Fluid dynamics heat transfer material balance
  • Q2. Plant safety and quality control
Round 3 - HR 

(1 Question)

  • Q1. Personal details and general HR questions
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Process parameters
  • Q2. Manufacturing process cement
Round 3 - Technical 

(2 Questions)

  • Q1. CCR OPERATION in cement plant
  • Ans. 

    CCR operation in a cement plant involves monitoring and controlling the process parameters to ensure efficient production.

    • CCR stands for Central Control Room, where operators monitor and control the entire cement production process.

    • Operators in the CCR are responsible for adjusting process parameters such as kiln feed, fuel consumption, and raw material composition.

    • Efficient CCR operation is crucial for maintaining qua...

  • Answered by AI
  • Q2. Plant optimization in cement plant
  • Ans. 

    Plant optimization in cement plant involves improving efficiency, reducing costs, and maximizing output.

    • Implementing advanced process control systems to optimize production

    • Regularly monitoring equipment performance and conducting maintenance to prevent breakdowns

    • Utilizing alternative fuels and raw materials to reduce energy consumption

    • Optimizing the use of additives to improve cement quality and reduce clinker usage

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Feb 2023. There was 1 interview round.

Round 1 - Training 

(1 Question)

  • Q1. Good training provided and course designed as per plant requirements.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before Dec 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Technical questions like mass transfer,heat transfer
  • Q2. Mass balance energy balance

Interview Preparation Tips

Interview preparation tips for other job seekers - Gives interview freely and body language make normal

Dalmia Bharat Cement Interview FAQs

How many rounds are there in Dalmia Bharat Cement Production Engineer interview for experienced candidates?
Dalmia Bharat Cement interview process for experienced candidates usually has 2 rounds. The most common rounds in the Dalmia Bharat Cement interview process for experienced candidates are Technical and HR.
What are the top questions asked in Dalmia Bharat Cement Production Engineer interview for experienced candidates?

Some of the top questions asked at the Dalmia Bharat Cement Production Engineer interview for experienced candidates -

  1. What is packing plant kapisi...read more
  2. What is coal mill kapisi...read more
  3. What is raw mater...read more

Tell us how to improve this page.

Dalmia Bharat Cement Production Engineer Interview Process for Experienced

based on 1 interview

Interview experience

1
  
Bad
View more
Dalmia Bharat Cement Production Engineer Salary
based on 12 salaries
₹3 L/yr - ₹7.5 L/yr
25% more than the average Production Engineer Salary in India
View more details

Dalmia Bharat Cement Production Engineer Reviews and Ratings

based on 5 reviews

4.1/5

Rating in categories

4.0

Skill development

4.1

Work-life balance

4.9

Salary

4.1

Job security

4.1

Company culture

4.8

Promotions

4.0

Work satisfaction

Explore 5 Reviews and Ratings
Assistant Manager
462 salaries
unlock blur

₹5.3 L/yr - ₹15 L/yr

Deputy Manager
296 salaries
unlock blur

₹7.1 L/yr - ₹23.5 L/yr

Senior Executive
291 salaries
unlock blur

₹4.8 L/yr - ₹11 L/yr

Sales Officer
239 salaries
unlock blur

₹2.5 L/yr - ₹8.5 L/yr

Technical Service Engineer
192 salaries
unlock blur

₹2.5 L/yr - ₹7.3 L/yr

Explore more salaries
Compare Dalmia Bharat Cement with

UltraTech Cement

4.2
Compare

JK Cement

4.1
Compare

Grasim Industries

4.0
Compare

ACC

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview