Filter interviews by
Be the first one to contribute and help others!
Quantitative reasoning
posted on 22 Dec 2024
The output voltage of an AAAC Rabbit conductor is typically around 600 volts.
The output voltage of an AAAC Rabbit conductor is usually around 600 volts.
The exact output voltage may vary depending on the specific application and conditions.
It is important to consult the manufacturer's specifications for accurate information.
My execution work plan involves setting clear goals, creating a timeline, assigning tasks, monitoring progress, and adjusting as needed.
Set clear goals and objectives for the project
Create a detailed timeline with milestones and deadlines
Assign tasks to team members based on their strengths and expertise
Regularly monitor progress and make adjustments as needed
Communicate effectively with team members and stakeholders
Ut...
Job safety analysis is a process of identifying potential hazards in a job task and implementing controls to mitigate risks.
Involves breaking down a job task into steps
Identifying potential hazards for each step
Determining preventive measures to reduce risks
Ensures workers are aware of safety procedures
Examples: construction site JSA, manufacturing plant JSA
Hazard identification is the process of identifying potential sources of harm in the workplace, while risk assessment involves evaluating the likelihood and severity of those hazards.
Hazard identification involves identifying potential sources of harm such as chemicals, machinery, or ergonomic factors.
Risk assessment involves evaluating the likelihood and severity of harm from these hazards.
The goal is to implement con...
Fire safety refers to measures taken to prevent and protect against the risks of fire.
Fire safety includes having working smoke detectors in place.
It also involves creating and practicing a fire escape plan.
Proper storage and handling of flammable materials is crucial for fire safety.
Regular maintenance of fire extinguishers and other fire safety equipment is important.
Training employees on fire safety protocols is ess
A hazard site is a location where there is a potential risk of harm to people, property, or the environment.
Hazard sites can include industrial facilities, chemical plants, nuclear power plants, and construction sites.
These sites may contain hazardous materials, dangerous equipment, or unsafe conditions.
Proper safety measures and protocols must be followed at hazard sites to prevent accidents and injuries.
Examples of h...
posted on 12 Oct 2024
I applied via Approached by Company and was interviewed in Sep 2024. There was 1 interview round.
LEL stands for Lower Explosive Limit, which is the minimum concentration of a gas or vapor in air that will ignite if a source of ignition is present.
LEL is used to determine the potential for a fire or explosion in a confined space.
Procedures for LEL testing involve using gas detection equipment to measure the concentration of a specific gas in the air.
If the LEL of a gas is exceeded, it indicates a potentially hazard...
Control of confined spaces is essential for ensuring the safety of workers in potentially hazardous environments.
Implementing a permit-to-work system to control access to confined spaces
Conducting thorough risk assessments before entry
Providing appropriate training for workers on confined space entry procedures
Using gas detectors and ventilation systems to monitor and control atmospheric conditions
Having a rescue plan
I applied via Referral and was interviewed in Jul 2024. There were 3 interview rounds.
Purchase Assignment - Comparing PO's
The basic rule of purchase is to obtain goods or services at the best possible price, quality, and terms to meet the needs of the organization.
Identify the needs of the organization
Research and evaluate potential suppliers
Negotiate prices, terms, and contracts
Ensure timely delivery and quality of goods/services
Maintain good relationships with suppliers
The number of quotations taken before evaluation depends on the complexity of the purchase and the urgency of the requirement.
The number of quotations may vary based on the budget allocated for the purchase.
For routine purchases, 3-5 quotations may be sufficient for evaluation.
For high-value or complex purchases, more quotations may be required to ensure the best deal.
Consider factors such as quality, price, delivery t...
I expect the company to provide a supportive work environment, opportunities for growth, clear communication, and fair compensation.
Supportive work environment
Opportunities for growth
Clear communication
Fair compensation
Negotiable based on job responsibilities, industry standards, and benefits package.
Compensation is based on factors such as job responsibilities, industry standards, and benefits package.
Open to discussing compensation based on the overall package offered.
Seeking a fair and competitive salary based on market research and experience.
Flexible on compensation depending on the opportunities for growth and development.
posted on 19 Sep 2024
There are mainly four grades of bitumen commonly used in construction: VG-10, VG-20, VG-30, and VG-40.
VG-10: Suitable for low-traffic roads
VG-20: Suitable for medium-traffic roads
VG-30: Suitable for high-traffic roads
VG-40: Suitable for heavy-duty traffic areas like airports and container terminals
The compressive strength of cement mortar cube at 3 days is typically around 20-25 MPa.
Compressive strength of cement mortar cube is an important parameter to assess its quality and durability
The strength of cement mortar increases with age, so 3 days is an early testing point
Typical compressive strength values for cement mortar cubes at 3 days range from 20-25 MPa
I applied via Walk-in and was interviewed in May 2024. There was 1 interview round.
posted on 4 Aug 2024
Managed full-cycle recruitment process for various positions in a fast-paced tech company
Led recruitment efforts for technical roles such as software engineers and data scientists
Collaborated with hiring managers to understand hiring needs and develop job descriptions
Sourced candidates through various channels including job boards, social media, and employee referrals
Conducted phone screens, interviews, and assessments...
System implementation process involves planning, designing, testing, and deploying new software or hardware systems.
Planning phase involves defining project scope, setting goals, and creating a timeline.
Design phase includes creating system architecture, database design, and user interface.
Testing phase involves conducting various tests to ensure system functionality and performance.
Deployment phase includes installing...
Monitoring performance involves setting clear expectations, providing feedback, tracking progress, and addressing any issues that arise.
Set clear performance expectations for team members
Provide regular feedback on performance
Track progress towards goals and objectives
Address any performance issues promptly and constructively
posted on 15 Aug 2024
I applied via Approached by Company and was interviewed in Jul 2024. There was 1 interview round.
Earthwork refers to the process of moving, excavating, and compacting soil and rock to prepare the ground for construction.
Earthwork involves activities such as excavation, grading, compaction, and backfilling.
It is essential for creating a stable foundation for roads, buildings, and other structures.
Earthwork also includes the removal of unwanted materials and the addition of necessary materials to achieve the desired...
GSB stands for Granular Sub Base and WMM stands for Wet Mix Macadam. GSB WMM is a type of road construction method using layers of granular materials.
GSB is the layer of granular material placed on the subgrade of a road to provide a stable foundation.
WMM is a mixture of aggregates, filler, and water laid on the GSB layer to form a strong base for the road.
GSB WMM construction involves compacting each layer properly to...
based on 3 reviews
Rating in categories
Project Lead
10
salaries
| ₹9.5 L/yr - ₹18 L/yr |
Technical Writer
6
salaries
| ₹4 L/yr - ₹4.8 L/yr |
Senior Mechanical Design Engineer
5
salaries
| ₹6 L/yr - ₹13 L/yr |
Design Engineer
4
salaries
| ₹2.2 L/yr - ₹5.7 L/yr |
CAM Programmer
4
salaries
| ₹4.5 L/yr - ₹8 L/yr |
GAMMON INDIA
Karam Industries
Ray Engineering
MaRS Planning & Engineering Services