Filter interviews by
I was interviewed in Sep 2024.
posted on 30 Aug 2021
I applied via Recruitment Consultant and was interviewed before Aug 2020. There were 5 interview rounds.
posted on 4 May 2019
I applied via Approached by Company and was interviewed before Feb 2023. There were 3 interview rounds.
I was interviewed in Mar 2023.
I applied via Referral and was interviewed in Jan 2023. There were 2 interview rounds.
Productivity of machinery and manpower is crucial for efficient operations.
Efficient machinery and skilled manpower can increase productivity.
Regular maintenance of machinery can prevent downtime and increase productivity.
Proper training and motivation of manpower can also improve productivity.
Use of automation and technology can further enhance productivity.
Productivity can be measured using metrics such as output per
Standard thumb rule in estimation
Thumb rule is a rough estimate based on experience
It is not accurate and can vary based on project
Example: 1 hour per page for content writing
Example: 1 month per developer for a software project
I applied via Job Fair and was interviewed before Apr 2022. There were 2 interview rounds.
The density of cement varies depending on the type of cement and its composition.
The density of ordinary Portland cement is around 3.15 g/cm³
The density of white cement is around 2.90 g/cm³
The density of low heat cement is around 3.0 g/cm³
The density of high alumina cement is around 3.0 g/cm³
The density of rapid hardening cement is around 3.15 g/cm³
posted on 19 Dec 2023
I applied via Referral and was interviewed before Dec 2022. There were 3 interview rounds.
The number of dumpers and excavators needed for a 15 km project depends on various factors such as the type of material being transported and the size of the excavation area.
The number of dumpers needed for a 15 km project will depend on the volume and weight of material to be transported, as well as the capacity of each dumper.
The number of excavators required will depend on the size of the excavation area, the type o...
A lead is a potential customer or client who has shown interest in a product or service.
A lead is typically generated through marketing efforts such as advertising or networking.
Leads can be obtained through various channels such as social media, email campaigns, or trade shows.
Once a lead is identified, they are usually passed on to the sales team for further follow-up and conversion.
Qualifying leads involves determin...
The quantity done by 200 machines in an hour depends on the efficiency and capacity of each machine.
The quantity done will depend on the output capacity of each machine
Factors such as machine speed, efficiency, and type of work being done will also impact the quantity produced
For example, if each machine can produce 10 units per hour, then 200 machines will produce 2000 units in an hour
based on 1 interview
Interview experience
Assistant Manager
26
salaries
| ₹0 L/yr - ₹0 L/yr |
Software Developer
12
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
12
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Manager
11
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Executive
10
salaries
| ₹0 L/yr - ₹0 L/yr |
IRB Infrastructure
GMR Group
Reliance Infrastructure
IL&FS Transportation Networks