Basic Question covering GK, Logical Reasoning , Physics , and Electrical Core question
Power factor is the ratio of real power to apparent power in an AC circuit.
Power factor is a measure of how effectively electrical power is being used in a circuit.
It is calculated by dividing the real power (in watts) by the apparent power (in volt-amperes).
A power factor of 1 indicates that all the power is being used effectively, while a power factor less than 1 indicates inefficiency.
Low power factor can lead to in...
posted on 28 Jun 2021
I applied via Naukri.com and was interviewed before Jun 2020. There were 2 interview rounds.
posted on 13 May 2023
I applied via Walk-in and was interviewed in Apr 2023. There were 2 interview rounds.
posted on 25 Mar 2022
I applied via LinkedIn and was interviewed in Jun 2021. There were 3 interview rounds.
Provided a topic daily related work
Parts of a transformer include core, windings, insulation, tap changer, bushings, and cooling system.
Core: Provides a path for magnetic flux
Windings: Primary and secondary coils for transferring energy
Insulation: Prevents short circuits
Tap changer: Adjusts the turns ratio
Bushings: Insulated devices for connecting external circuits
Cooling system: Keeps the transformer from overheating
The rating of a transformer refers to its power capacity and voltage levels.
Transformer rating is typically given in kVA (kilovolt-amperes) or MVA (megavolt-amperes).
It indicates the maximum power that the transformer can handle without overheating.
The rating also includes the primary and secondary voltage levels of the transformer.
For example, a transformer may be rated as 500 kVA, 11 kV/415 V.
Properly sizing the tran...
One Bay Shutdown process involves isolating a single bay for maintenance while keeping the rest of the system operational.
Isolate the bay by closing necessary valves and disconnecting equipment
Ensure proper tagging and lockout procedures are followed
Implement safety measures to prevent accidents
Coordinate with other departments to minimize impact on operations
Perform necessary maintenance work efficiently and safely
Tes
A scheme of a substation refers to the layout and configuration of the various components within the substation.
The scheme includes the arrangement of transformers, circuit breakers, busbars, and other equipment.
It also shows the connections between different components and how power flows through the substation.
The scheme is essential for understanding the overall operation and maintenance of the substation.
Examples o...
posted on 3 Jun 2022
I applied via Naukri.com and was interviewed before Jun 2021. There were 3 interview rounds.
Questions related to maintenance engineering including eddy current, 5S TPM, electromagnetic induction, RPM measurement, DC motor, shift handover, major breakdown, and star delta starter.
Eddy current is a current induced in a conductor due to a changing magnetic field
5S TPM is a methodology for workplace organization and standardization
Electromagnetic induction is the production of an electromotive force across a condu...
Interview experience
Research Associate
18
salaries
| ₹2.1 L/yr - ₹3 L/yr |
Assistant Manager
11
salaries
| ₹12.2 L/yr - ₹15.1 L/yr |
Graduate Engineer Trainee (Get)
8
salaries
| ₹1.7 L/yr - ₹2 L/yr |
Project Manager
7
salaries
| ₹18 L/yr - ₹32.5 L/yr |
Assistant Manager - Production
7
salaries
| ₹12.9 L/yr - ₹18.1 L/yr |
BASF
Clariant Chemicals
Godrej Industries
Pidilite Industries