Fiber work making cooling tower
Fiber work involves using fiber-reinforced plastic (FRP) to create the cooling tower
The process includes designing, cutting, and assembling the FRP panels
The supervisor must ensure safety protocols are followed during the construction process
Top trending discussions
I applied via Campus Placement and was interviewed before May 2020. There were 4 interview rounds.
I applied via Campus Placement and was interviewed before Feb 2020. There were 4 interview rounds.
I applied via Campus Placement and was interviewed before Jul 2020. There were 4 interview rounds.
The project involved designing and implementing a new network infrastructure for a large corporation.
Conducted a thorough analysis of the existing network infrastructure
Designed a new network architecture that met the company's needs
Implemented the new network infrastructure with minimal disruption to business operations
Tested and optimized the new network to ensure optimal performance
Provided ongoing support and maint
I applied via Walk-in and was interviewed before Feb 2020. There were 4 interview rounds.
I applied via Campus Placement and was interviewed before Jun 2020. There were 3 interview rounds.
I applied via Referral and was interviewed before Jun 2020. There were 5 interview rounds.
I applied via Campus Placement and was interviewed before Nov 2020. There was 1 interview round.
I applied via Referral and was interviewed before Mar 2021. There were 2 interview rounds.
Very easy
I applied via Walk-in and was interviewed before May 2019. There were 5 interview rounds.
based on 1 review
Rating in categories
TCS
Accenture
Wipro
Cognizant