Filter interviews by
Fans are used to create airflow in a specific direction, while blowers are used to generate high-pressure airflow in a concentrated area.
Fans are typically used for cooling purposes in electronics or ventilation in buildings.
Blowers are commonly used in HVAC systems, industrial processes, and automotive applications.
Fans have lower pressure capabilities compared to blowers.
Blowers are more efficient in moving air over ...
Heat exchangers are devices used to transfer heat between two or more fluids.
Heat exchangers can be classified based on their construction (e.g. shell and tube, plate, finned tube)
Design considerations include fluid flow rates, temperature ranges, material selection, and pressure drop
Efficiency of heat exchangers can be improved by increasing surface area for heat transfer
Examples of heat exchangers include car radiato...
Top trending discussions
I applied via Recruitment Consultant and was interviewed in Jun 2020. There were 3 interview rounds.
I applied via Recruitment Consultant and was interviewed in May 2021. There were 3 interview rounds.
I appeared for an interview in Jul 2023.
I applied via Recruitment Consultant and was interviewed before Aug 2020. There was 1 interview round.
I applied via Company Website and was interviewed in Dec 2023. There were 2 interview rounds.
Technically knowledge
I appeared for an interview in Mar 2025, where I was asked the following questions.
A production plan outlines the strategy for manufacturing goods efficiently and effectively.
Define production goals: Set clear, measurable objectives for output and quality.
Assess resources: Evaluate available materials, labor, and machinery to meet production needs.
Create a timeline: Develop a schedule that aligns production activities with demand forecasts.
Implement quality control: Establish procedures to ensure pro...
The number of labors required in a cum RCC depends on various factors such as project size, complexity, and timeline.
The number of labors required in a cum RCC can vary depending on the size of the project. Larger projects may require more labors.
The complexity of the project also plays a role in determining the number of labors needed. More complex projects may require additional skilled labors.
The timeline of the pro...
I applied via Campus Placement and was interviewed before Mar 2021. There was 1 interview round.
I have fabricated X tons of material within Y time span with successful execution.
Amount of material fabricated
Time span for fabrication
Execution success rate
PMO stands for Project Management Office. It is a centralized department that oversees project management across an organization.
PMO provides guidance, support, and standards for project management
It ensures that projects are aligned with the organization's goals and objectives
PMO monitors project progress and provides regular reports to stakeholders
It also manages resources, budgets, and risks associated with projects
...
based on 1 interview
Interview experience
Assistant Manager
366
salaries
| ₹3.9 L/yr - ₹13.1 L/yr |
Senior Officer
193
salaries
| ₹3 L/yr - ₹9.1 L/yr |
Deputy Manager
183
salaries
| ₹6 L/yr - ₹18 L/yr |
Retail Store Manager
170
salaries
| ₹1.2 L/yr - ₹5.2 L/yr |
Executive Supervisor
120
salaries
| ₹2.5 L/yr - ₹5.2 L/yr |
Aarti Industries
UPL
PI Industries
Rallis India