Filter interviews by
HVAC design parameters include load calculations, equipment selection, duct sizing, and ventilation rates.
Load calculations determine the heating and cooling requirements of a building.
Equipment selection involves choosing the appropriate HVAC system for the building's needs.
Duct sizing ensures proper air flow and distribution throughout the building.
Ventilation rates determine the amount of fresh air needed for indoor...
HVAC site execution stages involve planning, installation, testing, and commissioning of HVAC systems.
Planning stage involves designing the HVAC system, selecting equipment, and determining the layout.
Installation stage involves actual installation of the HVAC system components such as ductwork, piping, and equipment.
Testing stage involves checking the system for leaks, pressure, and temperature control.
Commissioning s...
Yes, I have experience in handling all types of HVAC equipment.
I have experience in handling air conditioning units, boilers, chillers, heat pumps, and ventilation systems.
I am familiar with both commercial and residential HVAC systems.
I have worked with various brands and models of HVAC equipment.
I am knowledgeable in troubleshooting and repairing HVAC equipment.
I am up-to-date with the latest HVAC technologies and in
Top trending discussions
AC service in the SS industry involves maintaining and repairing air conditioning systems in various industrial settings.
Regular maintenance of AC systems is crucial to ensure optimal performance and energy efficiency.
Troubleshooting and repairing AC units in industrial settings require specialized knowledge and skills.
Industrial AC systems may vary in size and complexity, requiring different approaches for servicing.
P...
I applied via Company Website and was interviewed in Mar 2023. There were 2 interview rounds.
Air outlet installation involves proper placement and sizing of vents to ensure efficient air flow and temperature control.
Consider the size and layout of the room when determining the number and placement of air outlets
Ensure that the air outlets are properly sealed to prevent air leaks
Choose the appropriate type of air outlet based on the HVAC system and the desired air flow direction
Regularly clean and maintain air ...
I applied via Walk-in and was interviewed before Feb 2021. There was 1 interview round.
based on 1 review
Rating in categories
Accountant
4
salaries
| ₹0.1 L/yr - ₹0.2 L/yr |
Project Engineer
4
salaries
| ₹3 L/yr - ₹5.5 L/yr |
TCS
Accenture
Wipro
Cognizant