Site Engineer Interview Questions & Answers

user image Anonymous

posted on 10 Jun 2022

I applied via Walk-in and was interviewed in May 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Case Study 

Construction material and techniques
Construction labour management
Site work

Interview Preparation Tips

Topics to prepare for Construction Group Site Engineer interview:
  • Autocad
  • REVIT Architecture
Interview preparation tips for other job seekers - I am very happy to construction work related jobs and design course are completed

Interview questions from similar companies

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - HR 

(3 Questions)

  • Q1. What is penitration test
  • Ans. 

    Penetration test is a method of evaluating the security of a computer system or network by simulating an attack from a malicious source.

    • Penetration test involves identifying vulnerabilities in a system or network.

    • It includes attempting to exploit these vulnerabilities to determine the potential impact of a real attack.

    • The goal of a penetration test is to strengthen the security defenses of the system or network.

    • Common ...

  • Answered by AI
  • Q2. What is water proofing
  • Ans. 

    Waterproofing is a process of making a structure or material resistant to the penetration of water.

    • Waterproofing involves applying materials or coatings to prevent water from seeping through surfaces.

    • It is commonly used in construction to protect buildings from water damage.

    • Examples of waterproofing materials include bituminous coatings, cementitious waterproofing, and liquid membrane systems.

  • Answered by AI
  • Q3. Types of foundation
  • Ans. 

    Types of foundation include shallow, deep, and pile foundations.

    • Shallow foundations are used when the soil is strong enough to support the structure's weight, such as spread footings and mat foundations.

    • Deep foundations are used when the soil is weak and unable to support the structure's weight, such as pile foundations and drilled piers.

    • Pile foundations are deep foundations that consist of long, slender columns driven...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Mar 2023. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. Mivan formwork process?
  • Ans. 

    Mivan formwork is a construction technique that uses aluminum formwork system for casting concrete structures.

    • Mivan formwork involves setting up aluminum formwork panels, fixing reinforcement bars, pouring concrete, and removing the formwork after the concrete has set.

    • It is a fast and efficient construction method commonly used for high-rise buildings and large residential projects.

    • The system allows for smooth finishes...

  • Answered by AI
  • Q2. Finishing process
  • Q3. Reinforcement related
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
Selected Selected
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Tool test and technical round
Round 3 - HR 

(1 Question)

  • Q1. Discussion with HR regarding package and joining date

Interview Questionnaire 

1 Question

  • Q1. [07/04, 1:22 PM] kamalrAj: Un akka metar video venuma da [07/04, 1:29 PM] kamalrAj: Un akkava poyi kelu daaaa..... [07/04, 1:31 PM] kamalrAj: Un nilamai ninaicha vadivel mosama Irukumula

I applied via Referral and was interviewed before Nov 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What you know about Electrical Engineering? How Could you install New Transfomer. Define Cutoff point . Jumpering Mufffing
  • Ans. 

    Electrical engineering involves the study and application of electricity, electronics, and electromagnetism.

    • To install a new transformer, first determine the appropriate location and ensure that the site meets all necessary safety requirements.

    • Next, connect the transformer to the power source and ensure that all wiring is properly grounded.

    • Finally, test the transformer to ensure that it is functioning correctly.

    • A cutof...

  • Answered by AI
  • Q2. Could you explain procedure for installing stay set .
  • Ans. 

    Stay set installation involves several steps including site preparation, anchor installation, and tensioning.

    • Prepare the site by clearing the area and ensuring proper drainage

    • Install anchors at the appropriate locations and depths

    • Attach the stay set to the anchors and tension it to the required specifications

    • Inspect the installation regularly to ensure proper tension and stability

    • Make any necessary adjustments or repai

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Have faith in your abilities.
Stay confident even though you don't know answer
Your Dressing & self presentation should be decent

I applied via Referral and was interviewed before Aug 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Just normal question like density grade about cement

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview is normal in afita they check your basic knowledge and about on site experience.

I applied via Walk-in and was interviewed before Oct 2021. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What is 2 ton AC?
  • Ans. 

    2 ton AC refers to the cooling capacity of an air conditioning unit.

    • A 2 ton AC can cool a space of approximately 120-150 square meters.

    • The term 'ton' refers to the amount of heat required to melt one ton of ice in 24 hours.

    • A 2 ton AC unit typically requires a 220-240 volt electrical outlet.

    • The higher the tonnage, the more powerful the AC unit and the larger the space it can cool.

    • Other factors such as insulation, ceilin...

  • Answered by AI
  • Q2. What is hydraulic system?
  • Ans. 

    Hydraulic system is a technology that uses fluids to generate, control, and transmit power.

    • Hydraulic systems use a liquid, usually oil, to transmit power.

    • They work on the principle of Pascal's law, which states that pressure applied to a fluid in a closed system is transmitted equally to all parts of the system.

    • Hydraulic systems are used in a variety of applications, including heavy machinery, aircraft, and automobiles...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - For learning and get experienced it is a very good company and all are supportive staff.

I applied via Referral and was interviewed before May 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. How much salary you want

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't go for job. they are builders

I appeared for an interview before Jan 2021.

Interview Questionnaire 

2 Questions

  • Q1. Lot of technical questions.
  • Q2. About DG, LT, HT & Transformers, etc.

Interview Preparation Tips

Interview preparation tips for other job seekers - There are lots of people who an uneducated and non-technical. So, do not apply to K1 Facility Private Limited.

Construction Group Interview FAQs

How many rounds are there in Construction Group Site Engineer interview for freshers?
Construction Group interview process for freshers usually has 2 rounds. The most common rounds in the Construction Group interview process for freshers are Resume Shortlist and Case Study.
What are the top questions asked in Construction Group Site Engineer interview for freshers?

Some of the top questions asked at the Construction Group Site Engineer interview for freshers -

  1. What the thickness of compreg ply and it's s...read more
  2. Consumption of shuttering oil per ltr how much area cove...read more
  3. What the mean of rolling margin of the st...read more

Tell us how to improve this page.

Construction Group Site Engineer Salary
based on 22 salaries
₹1.5 L/yr - ₹4.2 L/yr
22% less than the average Site Engineer Salary in India
View more details

Construction Group Site Engineer Reviews and Ratings

based on 1 review

3.0/5

Rating in categories

4.0

Skill development

4.0

Work-life balance

4.0

Salary

4.0

Job security

5.0

Company culture

4.0

Promotions

5.0

Work satisfaction

Explore 1 Review and Rating
Civil Site Engineer
105 salaries
unlock blur

₹0.9 L/yr - ₹5 L/yr

Accountant
44 salaries
unlock blur

₹1.1 L/yr - ₹6 L/yr

Civil Engineer
37 salaries
unlock blur

₹2 L/yr - ₹5.2 L/yr

Executive Accountant
33 salaries
unlock blur

₹1.1 L/yr - ₹6.1 L/yr

Safety Officer
29 salaries
unlock blur

₹2.2 L/yr - ₹7 L/yr

Explore more salaries
Compare Construction Group with

Lea Associates South Asia

4.3
Compare

McNally Bharat Engineering

4.0
Compare

R.V.R. PROJECTS

4.0
Compare

ABCI Infrastructures

3.4
Compare
Did you find this page helpful?
Yes No
write
Share an Interview