Upload Button Icon Add office photos

Filter interviews by

Construction Development Company Interview Questions and Answers

Updated 5 Apr 2022

Construction Development Company Interview Experiences

Popular Designations

3 interviews found

I applied via Naukri.com and was interviewed in Mar 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Competitive test

Round 3 - Aptitude Test 

Civil

Interview Preparation Tips

Interview preparation tips for other job seekers - Building working and Road construction.Lucknow

Site Engineer Interview Questions asked at other Companies

Q1. 1.BBS calculation of slab? 2.Stairs case riser and tread dimension? 3.Types of cement? 4.Full form of tmt, pcc, rcc, tmx, dpc 5.Definition of plinth area, courtyard area, built-up area? 6.function of dpc 8.standard size of brick? 9. Write g... read more
View answer (4)

Interview Questionnaire 

1 Question

  • Q1. This is safety field?

Safety Officer/Manager Interview Questions asked at other Companies

Q1. What is Hirachi of Hazard control
View answer (6)

I applied via Naukri.com and was interviewed in Mar 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Civil branch questions

Interview Preparation Tips

Interview preparation tips for other job seekers - I am ready to give the interview

Civil Site Engineer Interview Questions asked at other Companies

Q1. What is the minimum Grade of Concrete used in R.C.C. works?
View answer (65)

Interview questions from similar companies

I applied via Walk-in and was interviewed before Jun 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. What is data structure?
  • Ans. 

    Data structure is a way of organizing and storing data in a computer so that it can be accessed and used efficiently.

    • Data structures are used to manage large amounts of data efficiently.

    • They provide a way to organize data in a way that makes it easy to access and manipulate.

    • Examples of data structures include arrays, linked lists, stacks, queues, trees, and graphs.

  • Answered by AI
Round 3 - Coding Test 

Explain logic of stack

Interview Preparation Tips

Interview preparation tips for other job seekers - Its good place to start your career

Skills evaluated in this interview

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
-
Result
Not Selected
Round 1 - Technical 

(2 Questions)

  • Q1. Execution in Structure
  • Ans. 

    Execution in structure refers to the ability to effectively implement plans and strategies within an organized framework.

    • Understanding the overall goals and objectives of the organization

    • Developing detailed action plans to achieve those goals

    • Assigning tasks and responsibilities to team members

    • Monitoring progress and making adjustments as needed

    • Ensuring that resources are allocated efficiently

    • Communicating effectively w...

  • Answered by AI
  • Q2. High rise buildings

Skills evaluated in this interview

I applied via Walk-in and was interviewed before Dec 2020. There were 5 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. NEUTRAL AXIS IN RCC STRUCTURE
  • Ans. 

    The neutral axis is the line where the stress is zero in a reinforced concrete structure.

    • The neutral axis divides the cross-section of the structure into two parts: the compression zone and the tension zone.

    • The depth of the neutral axis depends on the moment of resistance of the section and the bending moment applied.

    • The position of the neutral axis affects the amount of reinforcement required in the tension zone.

    • The n...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - GRT TO WORK WITH THIS COMPANY
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Monster and was interviewed before Apr 2023. There were 3 interview rounds.

Round 1 - Assignment 

Question are hard in panel

Round 2 - HR 

(3 Questions)

  • Q1. What is the current ctc
  • Ans. 

    I am currently earning a salary of $60,000 per year.

    • My current annual salary is $60,000

    • I am earning $5,000 per month

    • My total compensation package is $60,000

  • Answered by AI
  • Q2. What is the company name
  • Ans. 

    The company name is XYZ Corporation, a leading data analytics firm specializing in providing insights for businesses.

    • XYZ Corporation is a data analytics firm

    • Specializes in providing insights for businesses

  • Answered by AI
  • Q3. Gammon India Ltd
Round 3 - Case Study 

It is very good in study for
Further studies.

Interview Preparation Tips

Interview preparation tips for other job seekers - Good
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in May 2024. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Tell me about yourself
  • Ans. 

    Experienced business analyst with a background in data analysis and process improvement.

    • Over 5 years of experience in analyzing business processes and identifying areas for improvement

    • Skilled in data analysis tools such as Excel, SQL, and Tableau

    • Strong communication and problem-solving skills

    • Led a project to streamline inventory management processes, resulting in a 20% reduction in costs

  • Answered by AI
  • Q2. Tell me about your roles and responsibilities
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Feb 2024.

Round 1 - Technical 

(10 Questions)

  • Q1. What are the seven quality control tools, and can you provide explanations for each?
  • Ans. 

    The seven quality control tools are essential for process improvement and problem-solving in engineering.

    • Check sheet: Used to collect and analyze data in a systematic way, such as tracking defects in a manufacturing process.

    • Pareto chart: Helps identify the most significant factors contributing to a problem by displaying them in descending order of frequency or impact.

    • Cause-and-effect diagram (Fishbone diagram): Visuali...

  • Answered by AI
  • Q2. 5S and visual management
  • Q3. What are the seven steps of autonomous maintenance?
  • Ans. 

    Autonomous maintenance is a key pillar of Total Productive Maintenance (TPM) and involves seven steps to empower operators to take care of their equipment.

    • Step 1: Initial Cleaning - Operators clean the equipment and surrounding area to identify abnormalities.

    • Step 2: Eliminate Sources of Contamination - Remove dirt, dust, and debris that can lead to breakdowns.

    • Step 3: General Inspection - Operators visually inspect the ...

  • Answered by AI
  • Q4. What are the calculations involved in Overall Equipment Effectiveness (OEE)?
  • Ans. 

    OEE calculations involve Availability, Performance, and Quality factors to measure equipment efficiency.

    • Calculate Availability by dividing Operating Time by Planned Production Time.

    • Calculate Performance by dividing Actual Production by Maximum Possible Production.

    • Calculate Quality by dividing Good Units Produced by Total Units Started.

  • Answered by AI
  • Q5. Why is it mandatory for an organization to implement lean practices?
  • Ans. 

    Implementing lean practices is mandatory for organizations to improve efficiency, reduce waste, and increase productivity.

    • Lean practices help organizations identify and eliminate waste in processes, leading to cost savings and improved efficiency.

    • By implementing lean practices, organizations can improve quality control and reduce defects in products or services.

    • Lean practices promote continuous improvement and empower ...

  • Answered by AI
  • Q6. How can downstream team members be motivated?
  • Ans. 

    Downstream team members can be motivated through recognition, clear communication, opportunities for growth, and fostering a positive work environment.

    • Provide recognition for their hard work and achievements

    • Communicate clearly about goals, expectations, and feedback

    • Offer opportunities for growth and development, such as training or mentorship programs

    • Create a positive work environment through team-building activities a

  • Answered by AI
  • Q7. What is Pareto analysis and how is it applied in decision-making processes?
  • Ans. 

    Pareto analysis is a technique used to identify the most important factors contributing to a problem or situation.

    • Pareto analysis is based on the Pareto Principle, also known as the 80/20 rule, which states that roughly 80% of effects come from 20% of causes.

    • It involves identifying and prioritizing the factors that have the most significant impact on a particular outcome.

    • By focusing on addressing the most critical fact...

  • Answered by AI
  • Q8. What is a Gemba walk, and how is it performed?
  • Ans. 

    A Gemba walk is a Lean management technique where managers go to the actual workplace to observe operations and engage with employees.

    • Gemba walks involve observing processes, asking questions, and identifying opportunities for improvement.

    • Managers should focus on understanding the work being done and the challenges faced by employees.

    • Gemba walks help in building relationships with employees and fostering a culture of c...

  • Answered by AI
  • Q9. What are the steps involved in performing safety risk assessments?
  • Ans. 

    Steps involved in performing safety risk assessments

    • Identify hazards and potential risks

    • Assess the likelihood and severity of each risk

    • Implement control measures to mitigate risks

    • Monitor and review the effectiveness of control measures

    • Document findings and recommendations

    • Communicate risks to relevant stakeholders

  • Answered by AI
  • Q10. Explain about TPM
  • Ans. 

    TPM stands for Total Productive Maintenance, a proactive approach to maintenance that aims to maximize equipment effectiveness.

    • TPM focuses on preventing equipment breakdowns through regular maintenance and employee involvement.

    • It involves autonomous maintenance, planned maintenance, and focused improvement activities.

    • TPM aims to improve overall equipment effectiveness (OEE) by reducing downtime, improving quality, and ...

  • Answered by AI
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. System implementation process
  • Ans. 

    System implementation process involves planning, designing, testing, and deploying new software or hardware systems.

    • Planning phase involves defining project scope, setting goals, and creating a timeline.

    • Design phase includes creating system architecture, database design, and user interface.

    • Testing phase involves conducting various tests to ensure system functionality and performance.

    • Deployment phase includes installing...

  • Answered by AI
  • Q2. Role and responsibilities to monitor performance.
  • Ans. 

    Monitoring performance involves setting clear expectations, providing feedback, tracking progress, and addressing any issues that arise.

    • Set clear performance expectations for team members

    • Provide regular feedback on performance

    • Track progress towards goals and objectives

    • Address any performance issues promptly and constructively

  • Answered by AI

Construction Development Company Interview FAQs

How many rounds are there in Construction Development Company interview?
Construction Development Company interview process usually has 3 rounds. The most common rounds in the Construction Development Company interview process are Aptitude Test and Resume Shortlist.
What are the top questions asked in Construction Development Company interview?

Some of the top questions asked at the Construction Development Company interview -

  1. This is safety fie...read more
  2. Civil branch questi...read more

Tell us how to improve this page.

Construction Development Company Reviews and Ratings

based on 21 reviews

4.0/5

Rating in categories

3.4

Skill development

3.1

Work-life balance

3.2

Salary

3.1

Job security

3.0

Company culture

2.7

Promotions

3.5

Work satisfaction

Explore 21 Reviews and Ratings
Accountant
11 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Account Assistant
8 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Site Engineer
8 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Site Engineer
6 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Executive Accountant
6 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Construction Development Company with

GAMMON INDIA

3.8
Compare

Patil Group

3.8
Compare

Millennium Engineers & Contractors

4.1
Compare

Karam Industries

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview