i
Cipla
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by
I applied via Walk-in and was interviewed before Jul 2021. There was 1 interview round.
It is important to check all RM, equipment, and utility before batch charging to ensure quality and safety.
Inspect all raw materials for quality and quantity
Check equipment for cleanliness and proper functioning
Ensure all utilities (water, electricity, etc.) are available and functioning properly
Verify that all safety measures are in place
Perform necessary calibrations and validations
Document all checks and inspections
I applied via Walk-in and was interviewed before Jul 2021. There was 1 interview round.
posted on 22 Jun 2024
I applied via Company Website and was interviewed in May 2024. There were 2 interview rounds.
I applied via Walk-in and was interviewed in Jun 2023. There were 2 interview rounds.
The previous company had a well-defined manufacturing process with specific parameters.
The manufacturing process at the previous company followed a step-by-step approach.
Each step had defined parameters to ensure quality and consistency.
For example, in the production of a car, the process included stages like welding, painting, and assembly.
The parameters for welding included temperature, pressure, and duration.
Similar...
I applied via Approached by Company and was interviewed in Mar 2023. There were 2 interview rounds.
I applied via Recruitment Consulltant and was interviewed before Dec 2022. There were 3 interview rounds.
Reason for choosing abbott
The principle of all machines is the conversion of energy from one form to another.
Machines operate by transforming energy.
They can convert mechanical energy into electrical energy, or vice versa.
Examples include engines, generators, and motors.
The principle is based on the laws of thermodynamics and conservation of energy.
The principle of unscramble is to rearrange or decode a scrambled or encrypted message to its original form.
Unscrambling involves rearranging the letters or characters of a scrambled message.
The original form of the message can be obtained by reversing the scrambling process.
Unscrambling can be done using various techniques such as pattern recognition, frequency analysis, or decryption algorithms.
Example: Unscrambling
The principle of counter is a technique used to keep track of the number of occurrences of an event or the number of times a process has been executed.
A counter is typically implemented as a variable that is incremented or decremented each time the event or process occurs.
Counters are commonly used in programming to track the number of iterations in a loop or the number of times a function is called.
Counters can also b...
Induction sealing is a process that uses electromagnetic induction to create a hermetic seal on containers.
Induction sealing involves the use of a sealing material, such as a foil liner, which is placed on the container's opening.
When the container passes through an induction sealing machine, an electromagnetic field is generated, causing the foil liner to heat up.
The heat melts the foil liner's inner layer, which then...
posted on 1 Jul 2023
75 questions related to pharmaceutical education and 25 English and reasoning
I applied via Naukri.com and was interviewed in May 2023. There were 3 interview rounds.
posted on 19 Feb 2023
I applied via Walk-in and was interviewed in Aug 2022. There were 3 interview rounds.
The last process of granulation is drying.
After granulation, the wet granules are dried to remove moisture.
Drying can be done using various methods such as fluid bed drying, tray drying, or vacuum drying.
The drying process is important to ensure the stability and shelf-life of the final product.
FBD stands for Free Body Diagram, a principle used in physics to analyze forces acting on a body.
FBD is a visual representation of all the forces acting on a body
It helps in understanding the net force acting on the body
FBD is used to solve problems related to mechanics, such as calculating the tension in a rope or the force required to move an object
It is based on Newton's laws of motion
FBD is commonly used in enginee
RMG stands for Resource Management Group. The principle of RMG is to efficiently manage and allocate resources to achieve organizational goals.
RMG focuses on optimizing the use of resources such as time, money, and manpower.
It involves identifying the needs of the organization and allocating resources accordingly.
RMG also involves monitoring and evaluating the use of resources to ensure efficiency and effectiveness.
For...
Alcoa is a global aluminum producer and C++ is a programming language.
Alcoa is one of the largest aluminum producers in the world, with operations in over 10 countries.
C++ is a high-level programming language used for developing software applications and operating systems.
C++ is known for its efficiency, speed, and flexibility, making it a popular choice for developing complex software systems.
posted on 14 Jul 2021
Data integrity refers to the accuracy, consistency, and reliability of data throughout its lifecycle.
Data integrity ensures that data remains unchanged and reliable.
It involves maintaining the accuracy and consistency of data over time.
Data integrity can be achieved through various methods such as validation, encryption, and backup.
Examples of data integrity issues include data corruption, unauthorized modifications, a...
We have 10 compression machines in our company.
We have a total of 10 compression machines.
These machines are used for compressing various materials.
They are an essential part of our production process.
The machines are regularly maintained to ensure optimal performance.
Examples of materials that are compressed include plastics, metals, and powders.
The number of load cells required depends on the production process and equipment being used.
The number of load cells needed varies depending on the type of equipment and production process.
Load cells are used to measure weight or force in a production process.
For example, a packaging line may require multiple load cells to ensure accurate filling of products.
The number of load cells needed should be determined by a pr...
Load cells are available in various parts of the machine.
Load cells are commonly found in the weighing system of the machine.
They can also be found in the material handling system to measure the weight of the material being moved.
Load cells may be present in the machine's hydraulic or pneumatic systems to measure force or pressure.
They can also be used in the machine's safety systems to detect overloading or excessive ...
Load cell calibration procedure involves testing and adjusting the load cell to ensure accurate measurement.
Verify the load cell specifications and calibration requirements
Apply known loads to the load cell and record readings
Compare the readings with the expected values and adjust if necessary
Repeat the process until the load cell readings are within the acceptable range
Document the calibration process and results
SCADA stands for Supervisory Control and Data Acquisition. It is a system used for monitoring and controlling industrial processes.
SCADA systems are used in various industries such as oil and gas, water treatment, and manufacturing.
They consist of hardware and software components that work together to collect and analyze data from sensors and other devices.
SCADA systems allow operators to remotely monitor and control p...
Gun validation procedure is a process to ensure that a firearm is safe and functional.
The gun is visually inspected for any damage or defects.
The gun is disassembled and inspected for any wear or damage to internal parts.
The gun is test fired to ensure that it functions properly.
The gun's serial number is checked against a database to ensure that it is not stolen.
The gun is marked with a unique identifier to indicate t...
End point in granulation refers to the point where the desired granule size is achieved.
End point is determined by monitoring the granule size distribution.
In RMG, the end point is usually achieved when the desired particle size is obtained and the moisture content is within the specified range.
In FBD, the end point is reached when the desired particle size is achieved and the moisture content is within the specified r...
There are several types of validation used in production processes.
Data validation ensures that input data meets certain criteria or rules.
Process validation ensures that a production process consistently produces the desired output.
Equipment validation ensures that production equipment is functioning correctly and reliably.
Cleaning validation ensures that cleaning procedures effectively remove residues or contaminants...
Change control is a process of managing changes to a product or system.
It involves documenting and tracking changes
It ensures that changes are made in a controlled and systematic manner
It helps to minimize the risk of errors and defects
Examples include software updates, product design changes, and process improvements
There are various types of deviations in production processes.
There are three types of deviations: minor, major, and critical.
Minor deviations are those that do not affect the quality of the product.
Major deviations are those that affect the quality of the product but do not pose a risk to the patient.
Critical deviations are those that pose a risk to the patient and require immediate action.
Examples of deviations inclu...
There are two types of charge control: constant current and constant voltage.
Constant current charge control maintains a steady flow of current to the battery until it reaches a certain voltage level.
Constant voltage charge control maintains a steady voltage level to the battery until the current drops to a certain level.
Examples of charge control devices include battery chargers, solar charge controllers, and power ba
I'm sorry, but I need more context to understand the question.
What is RMG?
What is the context of the question?
What type of capacity is being referred to?
based on 34 reviews
Rating in categories
Senior Executive
3.7k
salaries
| ₹1 L/yr - ₹8 L/yr |
Assistant Manager
2.7k
salaries
| ₹3.7 L/yr - ₹13.4 L/yr |
Deputy Manager
1.1k
salaries
| ₹5.3 L/yr - ₹18 L/yr |
Executive
988
salaries
| ₹1.5 L/yr - ₹6 L/yr |
Area Business Manager
608
salaries
| ₹4.3 L/yr - ₹12 L/yr |
Sun Pharmaceutical Industries
DRJ & CO
Lupin
Biocon Limited