Upload Button Icon Add office photos

Filter interviews by

CHICAGO Maintenance and Construction HVAC MEP Engineer Interview Questions and Answers

Updated 30 May 2023

CHICAGO Maintenance and Construction HVAC MEP Engineer Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Referral and was interviewed in Apr 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. About hvac question
  • Q2. Mep (hvac, fire fighting, plumbing, fire alarm, bms question

Interview Preparation Tips

Interview preparation tips for other job seekers - FRIENDS CIRCLE

Interview questions from similar companies

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

General aptitude and technical questions

Round 2 - Technical 

(3 Questions)

  • Q1. Heat Transfer questions
  • Q2. Refrigeration and Air conditioning questions psychometric chart
  • Q3. Thermodynamics basic
Round 3 - HR 

(2 Questions)

  • Q1. Family details and income details
  • Q2. Location details and take our advice
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. They asking about HVAC equipment installation process
  • Q2. I give to answer for hvac equipment installation as per method of statement. And safety

I applied via Recruitment Consulltant and was interviewed in Oct 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Thorough knowledge of HVAC, and calculation part? Prototyping activity?
  • Q2. Prototyping nd physical build testing of HVAC system
  • Ans. 

    Prototyping and physical build testing of HVAC system involves creating a working model and testing it in real-world conditions.

    • Create a prototype of the HVAC system

    • Test the prototype in real-world conditions

    • Make necessary adjustments based on test results

    • Repeat the process until the system meets all requirements

    • Examples of physical build testing include measuring airflow, temperature, and humidity levels

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Whenever you are preparing for an interview, do your research about the company and the Job description they are expecting out of candidature.
Round 1 - Technical 

(3 Questions)

  • Q1. FCU connection diagram
  • Ans. 

    FCU connection diagram shows the connections between the fan coil unit and other components in the HVAC system.

    • FCU connection diagram typically includes the connections for power supply, control signals, and refrigerant lines.

    • The diagram may also show the connections for ductwork, sensors, and valves.

    • Examples of components that may be connected to the FCU include the air handling unit, chiller, and thermostat.

    • The FCU c...

  • Answered by AI
  • Q2. AHU, FCU valve packages diagrams
  • Ans. 

    AHU and FCU valve packages diagrams are used to control the flow of air and water in HVAC systems.

    • AHU and FCU valve packages are used to regulate the flow of air and water in HVAC systems

    • These diagrams show the location and type of valves used in the system

    • Valve packages can include control valves, isolation valves, and balancing valves

    • AHU valve packages may also include dampers for air flow control

    • FCU valve packages m...

  • Answered by AI
  • Q3. Pump suction and discharge diagram
  • Ans. 

    A pump suction and discharge diagram shows the flow of fluid through a pump system.

    • The suction side of the pump is where the fluid enters the pump.

    • The discharge side of the pump is where the fluid exits the pump.

    • The diagram typically includes valves, pipes, and other components of the pump system.

    • The diagram may also show the direction of flow and the pressure at various points in the system.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Check HVAC schematic diagram, Valve package, FCU to Thermostat connection diagrams

I was interviewed in Nov 2017.

Interview Questionnaire 

3 Questions

  • Q1. Calculation of ducting
  • Ans. 

    Calculation of ducting in HVAC engineering involves determining the size, shape, and layout of ducts to ensure proper airflow and ventilation.

    • Calculate the required airflow rate based on the heating or cooling load of the space

    • Determine the friction loss in the ducts using the Darcy-Weisbach equation

    • Select the appropriate duct size based on the desired air velocity and pressure drop

    • Consider factors such as duct materia...

  • Answered by AI
  • Q2. Heat Exchanger Piping connection
  • Q3. About the Engineering role

Interview Preparation Tips

Round: Resume Shortlist
Experience: Asked About work experience

Round: Technical Interview
Experience: Asked about all hvac Equipments, piping, and ducting.

CHICAGO Maintenance and Construction Interview FAQs

How many rounds are there in CHICAGO Maintenance and Construction HVAC MEP Engineer interview?
CHICAGO Maintenance and Construction interview process usually has 2 rounds. The most common rounds in the CHICAGO Maintenance and Construction interview process are Resume Shortlist and Technical.
What are the top questions asked in CHICAGO Maintenance and Construction HVAC MEP Engineer interview?

Some of the top questions asked at the CHICAGO Maintenance and Construction HVAC MEP Engineer interview -

  1. mep (hvac, fire fighting, plumbing, fire alarm, bms quest...read more
  2. about hvac quest...read more

Tell us how to improve this page.

CHICAGO Maintenance and Construction HVAC MEP Engineer Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

Tata Technologies Interview Questions
3.6
 • 252 Interviews
TCE Interview Questions
3.8
 • 244 Interviews
Saint-Gobain Interview Questions
4.0
 • 170 Interviews
Apco Infratech Interview Questions
3.7
 • 112 Interviews
AECOM Interview Questions
4.3
 • 111 Interviews
Worley Interview Questions
4.1
 • 108 Interviews
View all
Construction Management
5 salaries
unlock blur

₹25 L/yr - ₹33.8 L/yr

Project Engineer - Civil
4 salaries
unlock blur

₹8 L/yr - ₹30.6 L/yr

HSE Officer
3 salaries
unlock blur

₹8.4 L/yr - ₹14.2 L/yr

AM-IT
3 salaries
unlock blur

₹30 L/yr - ₹35 L/yr

Explore more salaries
Compare CHICAGO Maintenance and Construction with

Megha Engineering & Infrastructures

3.9
Compare

Shapoorji Pallonji Group

4.1
Compare

Alstom Transportation

3.7
Compare

Tata Technologies

3.6
Compare
Did you find this page helpful?
Yes No
write
Share an Interview