I applied via Naukri.com and was interviewed in Sep 2021. There was 1 interview round.
Voltage is the potential difference between two points, while current is the flow of electric charge.
Voltage is measured in volts, while current is measured in amperes.
Voltage is the force that drives the current, while current is the rate of flow of electric charge.
Voltage can be compared to the pressure in a water pipe, while current can be compared to the flow of water through the pipe.
In a circuit, voltage is the d...
I applied via Referral and was interviewed before May 2021. There was 1 interview round.
Top trending discussions
I applied via Referral and was interviewed in Nov 2024. There was 1 interview round.
posted on 20 Aug 2024
I applied via Naukri.com and was interviewed before Apr 2021. There were 3 interview rounds.
How to improve Production & quality
Sales approaches involve building relationships, identifying needs, presenting solutions, and closing deals.
Building relationships with clients through networking and follow-up
Identifying client needs by asking probing questions and active listening
Presenting solutions that address the client's specific pain points
Closing deals by overcoming objections and negotiating terms
Sales process is a systematic approach to selling a product or service, involving various stages from prospecting to closing the deal.
Identifying potential leads and prospects
Qualifying leads to determine their level of interest and fit
Presenting the product or service to the prospect
Handling objections and addressing concerns
Closing the deal and following up with the customer
Building and maintaining relationships with
I applied via Naukri.com and was interviewed in Mar 2024. There was 1 interview round.
I applied via Approached by Company
Free float is the amount of time an activity can be delayed without delaying the project, while total float is the amount of time an activity can be delayed without delaying the successor activities.
Free float is specific to an activity, while total float is calculated across the entire project network.
Free float is calculated by subtracting the early start date of the activity from the early start date of the next act...
Critical path is the longest sequence of tasks in a project that must be completed on time to ensure the project finishes on schedule.
Critical path helps in identifying the minimum amount of time needed to complete a project.
It consists of tasks that have zero slack or float, meaning any delay in these tasks will delay the entire project.
Activities on the critical path are often marked with a double line in project man...
I applied via Naukri.com and was interviewed in May 2024. There were 2 interview rounds.
All related to previous work
I applied via Approached by Company and was interviewed in Sep 2023. There was 1 interview round.
based on 25 reviews
Rating in categories
Project Engineer
20
salaries
| ₹1.5 L/yr - ₹5.6 L/yr |
Project Manager
9
salaries
| ₹4.2 L/yr - ₹7 L/yr |
Engineer Trainee
7
salaries
| ₹1 L/yr - ₹2 L/yr |
PLC and Scada Engineer
5
salaries
| ₹2.8 L/yr - ₹4.2 L/yr |
Electrician
5
salaries
| ₹2 L/yr - ₹3.5 L/yr |
ABB
Siemens
Schneider Electric
Honeywell Automation