Filter interviews by
Top trending discussions
posted on 5 Feb 2022
I applied via Naukri.com and was interviewed before Feb 2021. There were 3 interview rounds.
Testing Life Cycle includes planning, designing, executing and reporting. Bug Life Cycle includes reporting, assigning, fixing and verifying.
Testing Life Cycle involves planning, designing, executing and reporting of tests.
Bug Life Cycle involves reporting, assigning, fixing and verifying bugs.
Testing Life Cycle starts with requirement analysis and ends with test closure.
Bug Life Cycle starts with bug reporting and end...
Severity is the impact of a bug on the system while priority is the urgency of fixing it.
Severity is the measure of how much a bug affects the system's functionality or performance.
Priority is the measure of how urgently a bug needs to be fixed.
A high severity bug may not have a high priority if it does not affect critical functionality.
A low severity bug may have a high priority if it affects critical functionality.
Bo...
Challenges faced during testing phase
Lack of clear requirements
Limited access to test environment
Time constraints
Difficulty in reproducing bugs
Integration issues with third-party systems
Lack of proper documentation
Testing on multiple platforms and devices
Dealing with unexpected errors
posted on 15 May 2021
I applied via Walk-in and was interviewed before May 2020. There was 1 interview round.
The President of India is the ceremonial head of state and the commander-in-chief of the Indian Armed Forces.
The current President of India is Ram Nath Kovind.
The President is elected by an Electoral College consisting of the elected members of both houses of Parliament and the elected members of the Legislative Assemblies of the states.
The President's role is largely symbolic and representative, with the real executiv...
posted on 30 Mar 2022
I applied via Walk-in and was interviewed before Mar 2021. There were 2 interview rounds.
Questions regarding e-commerce
posted on 3 Feb 2024
I applied via Company Website and was interviewed in Jan 2024. There was 1 interview round.
posted on 5 Feb 2022
I applied via Naukri.com and was interviewed before Feb 2021. There were 3 interview rounds.
Testing Life Cycle includes planning, designing, executing and reporting. Bug Life Cycle includes reporting, assigning, fixing and verifying.
Testing Life Cycle involves planning, designing, executing and reporting of tests.
Bug Life Cycle involves reporting, assigning, fixing and verifying bugs.
Testing Life Cycle starts with requirement analysis and ends with test closure.
Bug Life Cycle starts with bug reporting and end...
Severity is the impact of a bug on the system while priority is the urgency of fixing it.
Severity is the measure of how much a bug affects the system's functionality or performance.
Priority is the measure of how urgently a bug needs to be fixed.
A high severity bug may not have a high priority if it does not affect critical functionality.
A low severity bug may have a high priority if it affects critical functionality.
Bo...
Challenges faced during testing phase
Lack of clear requirements
Limited access to test environment
Time constraints
Difficulty in reproducing bugs
Integration issues with third-party systems
Lack of proper documentation
Testing on multiple platforms and devices
Dealing with unexpected errors
posted on 30 Mar 2022
I applied via Walk-in and was interviewed before Mar 2021. There were 2 interview rounds.
Questions regarding e-commerce
posted on 8 May 2024
I applied via Naukri.com and was interviewed in Apr 2024. There were 2 interview rounds.
Questions were moderate
Software Engineer
171
salaries
| ₹2.4 L/yr - ₹7.3 L/yr |
Senior Software Engineer
103
salaries
| ₹4.2 L/yr - ₹12 L/yr |
Design Engineer
90
salaries
| ₹1.5 L/yr - ₹6.5 L/yr |
Project Engineer
64
salaries
| ₹2.2 L/yr - ₹4.2 L/yr |
Softwaretest Engineer
51
salaries
| ₹2.9 L/yr - ₹7.5 L/yr |
Mphasis
LTIMindtree
Persistent Systems
Hexaware Technologies