i
Centum Electronics
Filter interviews by
I applied via Campus Placement and was interviewed before Dec 2020. There was 1 interview round.
Capacitor, J-FET, MOS-FET & Transformer symbols and working principles.
Capacitor symbol: two parallel lines with a space between them. It stores electrical charge.
J-FET symbol: a gate connected to a channel. It controls the flow of current.
MOS-FET symbol: a gate between two channels. It amplifies or switches electronic signals.
Transformer symbol: two coils with a core. It transfers electrical energy from one circuit to...
I applied via Company Website and was interviewed in Jan 2024. There were 2 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Oct 2024. There were 3 interview rounds.
Electrical electronic polytechnic hai aur mera sath mein ITI electrical se hai aur 10th and 12 tha and solar panel ki training bhi ki h
I applied via Approached by Company and was interviewed before Feb 2023. There were 2 interview rounds.
Cycle time is the total time taken to complete a process or task from start to finish.
Cycle time is a key metric in production, measuring the efficiency of a process.
It includes all the time spent on value-added and non-value-added activities.
Cycle time can be calculated by dividing the total production time by the total number of units produced.
For example, if a production line takes 10 hours to produce 100 units, the
Takt time is the rate at which a product must be produced in order to meet customer demand.
Takt time is calculated by dividing the available production time by the customer demand.
It helps in determining the pace of production to meet customer needs efficiently.
For example, if there are 480 minutes of production time available in a day and the customer demand is 240 units, the takt time would be 2 minutes per unit.
Lead time is the amount of time it takes for a product to be manufactured and delivered to the customer.
Lead time includes the time needed for production, processing, and transportation.
It is important for businesses to minimize lead time to improve customer satisfaction.
For example, if a company has a lead time of 2 weeks for a product, it means it takes 2 weeks from order placement to delivery.
Throughput time is the total time it takes for a product to go through the entire production process.
Throughput time includes all the time spent on processing, waiting, and moving the product through each stage of production.
It is a key metric in production efficiency and can help identify bottlenecks in the process.
For example, if a product takes 5 days to go through all production stages, the throughput time is 5 day
posted on 12 Apr 2024
I applied via Referral and was interviewed in Mar 2024. There was 1 interview round.
posted on 17 May 2024
I applied via Referral and was interviewed in Apr 2024. There was 1 interview round.
posted on 11 Dec 2023
I have over 5 years of experience in retail management, leading teams and driving sales.
Managed a team of 15 sales associates in a busy retail store
Implemented new sales strategies that resulted in a 20% increase in revenue
Responsible for inventory management and ordering stock
Trained new employees on company policies and procedures
I appeared for an interview in May 2017.
based on 12 reviews
Rating in categories
Technician
638
salaries
| ₹1 L/yr - ₹4 L/yr |
Senior Technician
153
salaries
| ₹1.7 L/yr - ₹3.5 L/yr |
Coordinator
102
salaries
| ₹1.7 L/yr - ₹4.8 L/yr |
Quality Inspector
78
salaries
| ₹1.2 L/yr - ₹4.5 L/yr |
Assistant Manager
77
salaries
| ₹11 L/yr - ₹38 L/yr |
Dixon Technologies
ECIL
TE Connectivity
Wistron