i
Centum Electronics
Filter interviews by
I applied via Company Website and was interviewed in May 2022. There were 2 interview rounds.
Capacitor, inductor, and resistor are electronic components used in circuits.
A capacitor stores and releases electrical energy.
An inductor stores and releases magnetic energy.
A resistor limits the flow of electrical current.
Capacitors are used in filters, timing circuits, and energy storage systems.
Inductors are used in transformers, motors, and filters.
Resistors are used to control current flow, voltage division, and
Capacitor stores electrical energy. Transistor amplifies and switches electronic signals. Electrostatic discharge is sudden flow of electricity.
Capacitor is an electronic component that stores electrical energy in an electric field. It is commonly used in electronic circuits to filter, smooth, and regulate voltage.
Transistor is a semiconductor device that can amplify or switch electronic signals. It is used in a wide r...
I applied via Campus Placement and was interviewed in Sep 2022. There were 2 interview rounds.
Diode, current, resistor, capacitor, forward bias, reverse bias, motor are basic components of electronics.
Diode is a semiconductor device that allows current to flow in one direction.
Current is the flow of electric charge.
Resistor is a component that resists the flow of current.
Capacitor is a component that stores electric charge.
Forward bias is when the voltage applied to a diode allows current to flow through it.
Rev...
I applied via Approached by Company and was interviewed before Feb 2023. There were 2 interview rounds.
Cycle time is the total time taken to complete a process or task from start to finish.
Cycle time is a key metric in production, measuring the efficiency of a process.
It includes all the time spent on value-added and non-value-added activities.
Cycle time can be calculated by dividing the total production time by the total number of units produced.
For example, if a production line takes 10 hours to produce 100 units, the
Takt time is the rate at which a product must be produced in order to meet customer demand.
Takt time is calculated by dividing the available production time by the customer demand.
It helps in determining the pace of production to meet customer needs efficiently.
For example, if there are 480 minutes of production time available in a day and the customer demand is 240 units, the takt time would be 2 minutes per unit.
Lead time is the amount of time it takes for a product to be manufactured and delivered to the customer.
Lead time includes the time needed for production, processing, and transportation.
It is important for businesses to minimize lead time to improve customer satisfaction.
For example, if a company has a lead time of 2 weeks for a product, it means it takes 2 weeks from order placement to delivery.
Throughput time is the total time it takes for a product to go through the entire production process.
Throughput time includes all the time spent on processing, waiting, and moving the product through each stage of production.
It is a key metric in production efficiency and can help identify bottlenecks in the process.
For example, if a product takes 5 days to go through all production stages, the throughput time is 5 day
I applied via Company Website and was interviewed in Jan 2024. There were 2 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Oct 2024. There were 3 interview rounds.
Electrical electronic polytechnic hai aur mera sath mein ITI electrical se hai aur 10th and 12 tha and solar panel ki training bhi ki h
I appeared for an interview in May 2017.
I applied via Company Website and was interviewed before Apr 2021. There were 3 interview rounds.
I applied via Recruitment Consultant and was interviewed before Oct 2020. There were 5 interview rounds.
Developed a web-based project management tool for a software development company.
Used Agile methodology for project management
Implemented user authentication and authorization
Integrated with third-party tools like JIRA and GitHub
Provided real-time project progress tracking
Generated reports for project analysis
Some of the top questions asked at the Centum Electronics Production interview -
based on 3 reviews
Rating in categories
Technician
640
salaries
| ₹1 L/yr - ₹4 L/yr |
Senior Technician
153
salaries
| ₹1.7 L/yr - ₹3.5 L/yr |
Coordinator
102
salaries
| ₹1.7 L/yr - ₹4.8 L/yr |
Quality Inspector
78
salaries
| ₹1.2 L/yr - ₹4.5 L/yr |
Assistant Manager
77
salaries
| ₹11 L/yr - ₹38 L/yr |
Dixon Technologies
ECIL
TE Connectivity
Wistron