Filter interviews by
I applied via Company Website and was interviewed in May 2022. There were 2 interview rounds.
Capacitor, inductor, and resistor are electronic components used in circuits.
A capacitor stores and releases electrical energy.
An inductor stores and releases magnetic energy.
A resistor limits the flow of electrical current.
Capacitors are used in filters, timing circuits, and energy storage systems.
Inductors are used in transformers, motors, and filters.
Resistors are used to control current flow, voltage division, and
Capacitor stores electrical energy. Transistor amplifies and switches electronic signals. Electrostatic discharge is sudden flow of electricity.
Capacitor is an electronic component that stores electrical energy in an electric field. It is commonly used in electronic circuits to filter, smooth, and regulate voltage.
Transistor is a semiconductor device that can amplify or switch electronic signals. It is used in a wide r...
I applied via campus placement at Sandur Polytechnic, Bellary and was interviewed in Sep 2022. There were 2 interview rounds.
Diode, current, resistor, capacitor, forward bias, reverse bias, motor are basic components of electronics.
Diode is a semiconductor device that allows current to flow in one direction.
Current is the flow of electric charge.
Resistor is a component that resists the flow of current.
Capacitor is a component that stores electric charge.
Forward bias is when the voltage applied to a diode allows current to flow through it.
Rev...
Top trending discussions
I applied via Approached by Company and was interviewed before Feb 2023. There were 2 interview rounds.
Cycle time is the total time taken to complete a process or task from start to finish.
Cycle time is a key metric in production, measuring the efficiency of a process.
It includes all the time spent on value-added and non-value-added activities.
Cycle time can be calculated by dividing the total production time by the total number of units produced.
For example, if a production line takes 10 hours to produce 100 units, the
Takt time is the rate at which a product must be produced in order to meet customer demand.
Takt time is calculated by dividing the available production time by the customer demand.
It helps in determining the pace of production to meet customer needs efficiently.
For example, if there are 480 minutes of production time available in a day and the customer demand is 240 units, the takt time would be 2 minutes per unit.
Lead time is the amount of time it takes for a product to be manufactured and delivered to the customer.
Lead time includes the time needed for production, processing, and transportation.
It is important for businesses to minimize lead time to improve customer satisfaction.
For example, if a company has a lead time of 2 weeks for a product, it means it takes 2 weeks from order placement to delivery.
Throughput time is the total time it takes for a product to go through the entire production process.
Throughput time includes all the time spent on processing, waiting, and moving the product through each stage of production.
It is a key metric in production efficiency and can help identify bottlenecks in the process.
For example, if a product takes 5 days to go through all production stages, the throughput time is 5 day
I applied via AmbitionBox and was interviewed in Apr 2022. There were 4 interview rounds.
A detailed analysis fo a person or group from a social or psychological or medical point of view
The act of putting a person in to anon elective position_appointment, designation, naming
Discussion group, farmers discussion group
posted on 31 Jan 2025
I live in Noida in khora calony
My fevriout colur Red
My grandmother name is Radha devi
I applied via Naukri.com and was interviewed in Mar 2024. There was 1 interview round.
I applied via Walk-in and was interviewed in Sep 2023. There were 2 interview rounds.
posted on 15 Jul 2021
I applied via Walk-in and was interviewed before Jul 2020. There were 4 interview rounds.
Some of the top questions asked at the Centum Electronics Production interview -
based on 3 reviews
Rating in categories
Technician
651
salaries
| ₹1 L/yr - ₹4 L/yr |
Senior Technician
151
salaries
| ₹1.7 L/yr - ₹3.5 L/yr |
Coordinator
82
salaries
| ₹1.7 L/yr - ₹4.8 L/yr |
Quality Inspector
77
salaries
| ₹1.2 L/yr - ₹4.5 L/yr |
Senior Engineer
74
salaries
| ₹5.4 L/yr - ₹16 L/yr |
Bharat Electronics
Hindustan Aeronautics
Tata Power
Larsen & Toubro Limited