Filter interviews by
I applied via LinkedIn and was interviewed in Jul 2022. There were 2 interview rounds.
I applied via Referral and was interviewed before Feb 2021. There were 2 interview rounds.
Shortlist in interview round after that training for final shortlist
I applied via Naukri.com and was interviewed in May 2024. There was 1 interview round.
I applied via Company Website and was interviewed before Dec 2023. There were 2 interview rounds.
I applied via Referral and was interviewed in Jul 2023. There were 2 interview rounds.
Predictive Maintenance is a proactive approach that uses data analysis to predict equipment failures and schedule maintenance before they occur.
Predictive Maintenance uses data analysis techniques to identify patterns and trends that indicate potential equipment failures.
It involves monitoring equipment performance in real-time and collecting data on factors such as temperature, vibration, and energy consumption.
By ana...
Power factor is a measure of how effectively electrical power is being used in a circuit.
Power factor is the ratio of real power (measured in watts) to apparent power (measured in volt-amperes).
It indicates the efficiency of power usage in a circuit.
A power factor of 1 means all the power is being used effectively, while a power factor less than 1 indicates wastage of power.
Inductive loads like electric motors have a l...
An object drawing example in 2D
Start by identifying the object you want to draw
Determine the scale and dimensions of the drawing
Use appropriate tools like rulers, compass, and protractors
Sketch the basic outline of the object
Add details and shading to enhance the drawing
Label important features or measurements
Review and refine the drawing for accuracy
ESD line monitoring is required for DI channels.
ESD line monitoring is necessary to prevent damage to sensitive electronic equipment.
DI channels are particularly vulnerable to ESD damage.
ESD line monitoring can be achieved through the use of ESD protection devices and regular testing.
Regular maintenance and calibration of monitoring equipment is also important.
I applied via Recruitment Consulltant and was interviewed before Jul 2023. There were 2 interview rounds.
Moderate to difficult
posted on 28 Mar 2022
Discipline wise deliverables are interdependent and require coordination for successful project completion.
Each discipline has its own set of deliverables that are interdependent on each other.
Coordination is required to ensure timely delivery of each discipline's deliverables.
Examples of discipline wise deliverables include civil engineering drawings, electrical schematics, and mechanical designs.
Codes and standards are crucial for ensuring safety and efficiency in process industries.
ASME B31.3 for piping systems
NFPA 70 for electrical systems
API 650 for storage tanks
OSHA for workplace safety
ISO 9001 for quality management
ANSI/ISA-88 for batch control systems
I applied via Company Website and was interviewed in Jan 2021. There was 1 interview round.
Surge arrestors protect electrical equipment from voltage spikes and surges.
Surge arrestors are devices that limit the voltage supplied to electrical equipment during a surge or spike.
They protect equipment from damage caused by overvoltage.
Surge arrestors are commonly used in power distribution systems, telecommunications networks, and electronic equipment.
They work by diverting excess voltage to the ground, preventin...
I applied via Referral and was interviewed in Jul 2022. There were 3 interview rounds.
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Design Engineer
18
salaries
| ₹0 L/yr - ₹0 L/yr |
Quality Engineer
17
salaries
| ₹0 L/yr - ₹0 L/yr |
Project Engineer
16
salaries
| ₹0 L/yr - ₹0 L/yr |
Store Incharge
8
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Project Engineer
7
salaries
| ₹0 L/yr - ₹0 L/yr |
SKF
Grindwell Norton
Timken
Schaeffler India