Round 1 - Technical 

(5 Questions)

  • Q1. Road construction progect process rverr 1 :- Flexible pavements 2:- rigid pavements Flexible pavement 1 survey, encroachment, NGl,OGL 2Embankmnt:- thickness 3m assume large sige of soil particles75m...
  • Q2. RIGID PAVEMENT Flexible pavement sn 1no 3no same process on rigid pavements 1:- DLC-150mm 2:- PQC 300mm DLC:- 1 :- aggregate size 26.5 mm 2:- max water absorption <2% 3:-soundness test:- Naso4 <12% ...
  • Ans. 

    The process and requirements for constructing a Rigid Pavement DLC layer.

    • DLC layer consists of aggregate with specific size and water absorption properties.

    • Minimum cement content required for construction.

    • DLC layer is transported and laid with specific equipment and techniques.

    • Proper compaction and curing is necessary for the DLC layer.

    • Tolerance for DLC layer is 6mm +/_.

  • Answered by AI
  • Q3. PQC:- 1. :-Aggregate size 31.5mm Soundness test to aggregate reative to alkaline same above Dlc 1;- use M40 grade concete 2:- The minimum cement content 360kg percum. If flyash is more than 20%..The ...
  • Q4. Other requirement as per site situation.
  • Q5. All highyway company

Interview Preparation Tips

Interview preparation tips for other job seekers - I have more knowledge about highway and Expressway.

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via Recruitment Consulltant and was interviewed in Nov 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Previous job roles
  • Ans. 

    I have held various project management roles in the past, overseeing the successful completion of multiple projects.

    • Managed cross-functional teams to deliver projects on time and within budget

    • Developed project plans, schedules, and budgets

    • Identified and mitigated project risks

    • Communicated project status updates to stakeholders

    • Ensured project deliverables met quality standards

  • Answered by AI
Round 3 - Technical 

(1 Question)

  • Q1. Installation of interior fitout in a specific space.
  • Ans. 

    The installation of interior fitout in a specific space involves the process of transforming an empty area into a functional and aesthetically pleasing environment.

    • Understanding the client's requirements and design specifications

    • Creating a detailed project plan and timeline

    • Coordinating with architects, designers, contractors, and suppliers

    • Managing the procurement and delivery of materials and equipment

    • Supervising the i...

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
-
Result
Not Selected
Round 1 - Technical 

(2 Questions)

  • Q1. Execution in Structure
  • Ans. 

    Execution in structure refers to the ability to effectively implement plans and strategies within an organized framework.

    • Understanding the overall goals and objectives of the organization

    • Developing detailed action plans to achieve those goals

    • Assigning tasks and responsibilities to team members

    • Monitoring progress and making adjustments as needed

    • Ensuring that resources are allocated efficiently

    • Communicating effectively w...

  • Answered by AI
  • Q2. High rise buildings

Skills evaluated in this interview

Interview experience
1
Bad
Difficulty level
Easy
Process Duration
-
Result
No response

I applied via Naukri.com and was interviewed in Oct 2023. There was 1 interview round.

Round 1 - HR 

(1 Question)

  • Q1. Polymorphism in java, oops
  • Ans. 

    Polymorphism in Java allows objects of different classes to be treated as objects of a common superclass.

    • Polymorphism is achieved through method overriding and method overloading.

    • Method overriding allows a subclass to provide a specific implementation of a method that is already provided by its superclass.

    • Method overloading allows multiple methods with the same name but different parameters in the same class.

    • Polymorphi...

  • Answered by AI

Skills evaluated in this interview

I applied via Walk-in and was interviewed before Jun 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. What is data structure?
  • Ans. 

    Data structure is a way of organizing and storing data in a computer so that it can be accessed and used efficiently.

    • Data structures are used to manage large amounts of data efficiently.

    • They provide a way to organize data in a way that makes it easy to access and manipulate.

    • Examples of data structures include arrays, linked lists, stacks, queues, trees, and graphs.

  • Answered by AI
Round 3 - Coding Test 

Explain logic of stack

Interview Preparation Tips

Interview preparation tips for other job seekers - Its good place to start your career

Skills evaluated in this interview

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Aug 2023. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Mivan knowledge
  • Q2. How many cycling days scheduled to slab casting and details
  • Ans. 

    The number of cycling days scheduled for slab casting varies depending on the project timeline and size of the slabs.

    • Cycling days for slab casting can range from 1 to 5 days per slab, depending on the size and complexity of the slab.

    • Factors such as weather conditions, equipment availability, and workforce efficiency can also impact the number of cycling days.

    • For example, a smaller slab may only require 1-2 cycling days...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for S V S Projects India Deputy Project Manager interview:
  • Planning
  • Material Management
  • Quality checklist

I applied via Company Website and was interviewed in Jul 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Site work related Nd experience
  • Q2. Site related exp wats ur job role in site?

Interview Preparation Tips

Interview preparation tips for other job seekers - If your work experienced then no need of fear about interview
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Sep 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Site responsibility
  • Q2. Formwork details
  • Q3. Drawing knowledge depth

Interview Preparation Tips

Interview preparation tips for other job seekers - Project Engineer

I applied via Referral and was interviewed in Sep 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Group Discussion 

How to add value in the Finance .
How to improve Credit rating of the Company
Practical experience on Financial reports
Expertise on GST and IT

Round 3 - Case Study 

How to Optimize the bottom line of the P&L statement

Interview Preparation Tips

Interview preparation tips for other job seekers - Focus on the area of Expectations and reply with the absolute and practical way
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Aug 2024.

Round 1 - HR 

(5 Questions)

  • Q1. Can you introduce yourself?
  • Ans. 

    I am a dedicated and experienced professional with a background in timekeeping and human resource administration.

    • Over 5 years of experience in timekeeping and human resource administration

    • Proficient in using timekeeping software such as ADP Workforce Now

    • Skilled in managing employee schedules and time-off requests

    • Strong understanding of labor laws and regulations

    • Excellent communication and organizational skills

  • Answered by AI
  • Q2. What work are you currently observing?
  • Ans. 

    I am currently observing the time management practices and employee interactions in the customer service department.

    • Observing how employees prioritize tasks and manage their time effectively

    • Noting any communication issues or conflicts among team members

    • Analyzing the impact of time management on overall productivity and customer satisfaction

  • Answered by AI
  • Q3. Why are you doing this work?
  • Ans. 

    I am passionate about helping others succeed and thrive in their roles.

    • I enjoy supporting and guiding individuals to reach their full potential

    • I find fulfillment in creating a positive work environment for employees

    • I believe in the importance of effective time management and resource allocation

    • I am dedicated to fostering a culture of growth and development within the organization

  • Answered by AI
  • Q4. How much experience do you have in this field?
  • Ans. 

    I have 5 years of experience in Time Keeper and Human Resource Administration.

    • 5 years of experience in managing time and attendance records

    • Proficient in HR software and systems

    • Skilled in payroll processing and employee scheduling

    • Handled employee onboarding and offboarding processes

    • Conducted performance evaluations and maintained employee records

  • Answered by AI
  • Q5. What salary do you expect for this position?
  • Ans. 

    I am looking for a competitive salary based on my experience, skills, and the responsibilities of the position.

    • Research the average salary range for similar positions in the industry

    • Consider your level of experience and qualifications

    • Factor in the cost of living in the location of the job

    • Be prepared to negotiate based on the benefits package offered

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - It takes time to search for a job, so be patient.

Casta Engineers Interview FAQs

How many rounds are there in Casta Engineers Senior Project Manager interview?
Casta Engineers interview process usually has 1 rounds. The most common rounds in the Casta Engineers interview process are Technical.
What are the top questions asked in Casta Engineers Senior Project Manager interview?

Some of the top questions asked at the Casta Engineers Senior Project Manager interview -

  1. RIGID PAVEMENT Flexible pavement sn 1no 3no same process on rigid pavements...read more
  2. Road construction progect process rverr 1 :- Flexible pavements 2:- rigid pa...read more
  3. PQC:- 1. :-Aggregate size 31.5mm Soundness test to aggregate reative to al...read more

Tell us how to improve this page.

Assistant Highway Engineer
12 salaries
unlock blur

₹2.4 L/yr - ₹4.1 L/yr

Business Development Executive
6 salaries
unlock blur

₹2 L/yr - ₹4 L/yr

Site Supervisor
5 salaries
unlock blur

₹1.1 L/yr - ₹1.1 L/yr

Highway Engineer
5 salaries
unlock blur

₹4.2 L/yr - ₹7 L/yr

Project Engineer
4 salaries
unlock blur

₹4.2 L/yr - ₹4.8 L/yr

Explore more salaries
Compare Casta Engineers with

Millennium Engineers & Contractors

4.1
Compare

Karam Industries

4.1
Compare

S V S Projects India

3.4
Compare

MaRS Planning & Engineering Services

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview