Upload Button Icon Add office photos

Filter interviews by

Case New-Holland Construction Equipment India Field Service Engineer Interview Questions, Process, and Tips

Updated 27 Dec 2022

Case New-Holland Construction Equipment India Field Service Engineer Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Dec 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(6 Questions)

  • Q1. 1) about hydraulic 2) about Transmission, T. C 3) about electrical system 4) Travel soothing for the case machine problem
  • Q2. What is the cause for Machine slow operation, What is function of TC What is the function of Transmission What is the difference between open circuit and close circuit. Many mor quotation discussed durin...
  • Ans. 

    Answers to technical questions related to machine operation and circuits

    • Slow machine operation can be caused by various factors such as low power supply, mechanical issues, or software problems

    • TC stands for torque converter which is used to transfer power from the engine to the transmission

    • Transmission is responsible for changing the gear ratios to provide the appropriate speed and torque for the machine

    • Open circuit me...

  • Answered by AI
  • Q3. What is the function of alternator, self stater, What is the function of Relay, fuse, diode, What is the current, voltage, power, restrictions, conductor.
  • Ans. 

    The alternator generates electrical power, self-starter starts the engine. Relay controls high power circuits, fuse protects circuits from overloading, diode allows current to flow in one direction. Current is the flow of electrons, voltage is the electrical potential difference, power is the rate at which work is done. Restrictions limit the flow of current, conductor allows the flow of current.

    • Alternator generates el...

  • Answered by AI
  • Q4. What is the causes for machine not R/ F What is the causes for hydraulic function not working What is problem for engine over heating
  • Ans. 

    Machine not R/F, hydraulic function not working, engine overheating - causes and problems

    • Machine not R/F can be caused by faulty wiring, malfunctioning control board, or damaged components

    • Hydraulic function not working can be due to low fluid levels, clogged filters, or damaged hoses

    • Engine overheating can be caused by low coolant levels, malfunctioning thermostat, or clogged radiator

    • Regular maintenance and inspections

  • Answered by AI
  • Q5. What is causes for vibration not working
  • Ans. 

    Vibration not working can be caused by various factors.

    • Loose or damaged parts

    • Electrical issues

    • Mechanical failure

    • Software malfunction

    • Environmental factors

    • Improper installation or maintenance

    • Sensor or transducer failure

    • Power supply issues

  • Answered by AI
  • Q6. Mony more discussed during interview

Interview Preparation Tips

Topics to prepare for Case New-Holland Construction Equipment India Field Service Engineer interview:
  • Pump Hydraulics
Interview preparation tips for other job seekers - I always love to my job as well as company so yes

Interview questions from similar companies

I applied via Referral and was interviewed before Feb 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. What about your confidence

Interview Preparation Tips

Interview preparation tips for other job seekers - Be alert....

Case New-Holland Construction Equipment India Interview FAQs

How many rounds are there in Case New-Holland Construction Equipment India Field Service Engineer interview?
Case New-Holland Construction Equipment India interview process usually has 2 rounds. The most common rounds in the Case New-Holland Construction Equipment India interview process are Resume Shortlist and Technical.
What are the top questions asked in Case New-Holland Construction Equipment India Field Service Engineer interview?

Some of the top questions asked at the Case New-Holland Construction Equipment India Field Service Engineer interview -

  1. What is the cause for Machine slow operation, What is function of TC What is t...read more
  2. What is the function of alternator, self stater, What is the function of Relay...read more
  3. What is the causes for machine not R/ F What is the causes for hydraulic functi...read more

Tell us how to improve this page.

Case New-Holland Construction Equipment India Field Service Engineer Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

Caterpillar Inc Interview Questions
4.3
 • 176 Interviews
JCB Interview Questions
4.0
 • 125 Interviews
PMT Machines Interview Questions
3.4
 • 19 Interviews
Trelleborg Interview Questions
4.0
 • 18 Interviews
Liebherr Interview Questions
3.9
 • 16 Interviews
View all

Case New-Holland Construction Equipment India Field Service Engineer Reviews and Ratings

based on 1 review

4.0/5

Rating in categories

3.0

Skill development

4.0

Work-life balance

4.0

Salary

3.0

Job security

4.0

Company culture

4.0

Promotions

3.0

Work satisfaction

Explore 1 Review and Rating
Senior Engineer
34 salaries
unlock blur

₹4 L/yr - ₹14.1 L/yr

Quality Engineer
28 salaries
unlock blur

₹1 L/yr - ₹4.8 L/yr

Area Service Manager
21 salaries
unlock blur

₹4.9 L/yr - ₹12 L/yr

Design Engineer
19 salaries
unlock blur

₹2.2 L/yr - ₹6 L/yr

Manager
18 salaries
unlock blur

₹13.1 L/yr - ₹26 L/yr

Explore more salaries
Compare Case New-Holland Construction Equipment India with

JCB

4.0
Compare

Komatsu

3.9
Compare

Caterpillar Inc

4.3
Compare

Volvo Construction Equipment

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview